105.07 Handling and Transporting Materials

From MDOT Wiki
Jump to: navigation, search
2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION - SECTION 105
Email this Page

Transfer of Tested Materials

When transferring construction materials which were tested and accepted for a specific project but are to be used on another project, it is not necessary to include a copy of the test report. However, the laboratory test report number must be placed on the Transfer of Tested Materials, Form 1178, so the test report can be obtained if necessary. One exception is for borderline results in which case a copy of the test report should be included with the Transfer of Tested Materials form for the information or action of the receiving Engineer. Refer to Figure 105-1.

Figure 105-1 - Form 1178 - Transfer of Tested Materials

[top of page]


Personal tools
Namespaces

Variants
Actions
Navigation
Division 2 - Earthwork
Division 3 - Base Courses
Division 4 - Drainage Features
Division 5 - HMA Pavements and Surface Treatments
Division 6 - PCC Pavement Mixtures
Division 7 - Structures
Division 8 - Incidental Construction
Toolbox