Search results

Jump to navigation Jump to search
Results 1 – 3 of 3
Advanced search

Search in namespaces:

  
  
  
  
  
  
  
  
  
  
  
  • <center><span STYLE="font: 60pt arial;">'''1002'''</span></center> '''1002 - Contractor Quality Control for Concrete'''
    30 KB (4,172 words) - 17:23, 3 January 2024
  • !Updated!! Division !! Section !! Summary !! What Changed ...|602 - Concrete Pavement Construction]]</center>||Major revision to entire section content on 602 - Concrete Pavement Construction New content, additional pi
    70 KB (9,101 words) - 16:47, 29 May 2024
  • ...ng the subgrades uniformity and stability. Refer to MDOT Wiki Division 2 - Section 205 for the procedure of test-rolling. Once weak areas are identified, the During final finishing operations. The previously removed 4-inch end section of the expansion filler material should be replaced and the concrete consol
    87 KB (13,988 words) - 15:30, 8 May 2024