Difference between revisions of "109.08 Prompt Payment"
Jump to navigation
Jump to search
(Creating New Page for Prompt Payment guidance) |
(Added content to new page along with flow chart (Process for Alleged Prompt Payment Violation)) |
||
Line 1: | Line 1: | ||
+ | <div style="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/109.08_Prompt_Payment Email this Page]</div> | ||
+ | |||
+ | ===Alleged Prompt Payment Complaints=== | ||
+ | |||
+ | The following flow chart should be used to resolve alleged prompt payment complaints. Alleged complaints can come to the engineer’s attention by means of a lien notice to a bond company, email, discussion at a progress meeting, or other channels. The engineer is to request the complainant follow up with a detailed written notice (correspondence or email) to the alleged party. The written notice is to include the engineer and the prime contractor if the prime contractor is not the alleged party. Additional support is available by contacting the MDOT CFS Prompt Pay Specialist. | ||
+ | |||
+ | [[File:CMU 109.08 PPSP FlowChart 04-15-2020.pdf|300px|thumbnail|center|link=//{{SERVERNAME}}/images_construction/2/2d/CMU_109.08_PPSP_FlowChart_04-15-2020.pdf|Process for Alleged Prompt Payment Violation]] | ||
+ | |||
+ | |||
+ | |||
{{top}} | {{top}} | ||
[[Category:Construction Manual]] | [[Category:Construction Manual]] | ||
[[Category:Division 1]] | [[Category:Division 1]] | ||
[[Category:Section 109]] | [[Category:Section 109]] |
Revision as of 13:25, 21 April 2020
Alleged Prompt Payment Complaints
The following flow chart should be used to resolve alleged prompt payment complaints. Alleged complaints can come to the engineer’s attention by means of a lien notice to a bond company, email, discussion at a progress meeting, or other channels. The engineer is to request the complainant follow up with a detailed written notice (correspondence or email) to the alleged party. The written notice is to include the engineer and the prime contractor if the prime contractor is not the alleged party. Additional support is available by contacting the MDOT CFS Prompt Pay Specialist.