Difference between revisions of "208 - Soil Erosion and Sedimentation Control (NPDES)"

From MediaWiki
Jump to navigation Jump to search
m (→‎Notification: Fixed broken link)
(15 intermediate revisions by 6 users not shown)
Line 1: Line 1:
208 - Soil Erosion and Sedimentation Control (NPDES)
 
  
* [[208.01 - General]]
+
<center><span STYLE="font: 60pt arial;">'''208'''</span></center>
 +
 
 +
<center><span STYLE="font: 40pt arial;">'''Soil Erosion and Sedimentation Control'''</span></center>
 +
 
 +
<center>[http://mdotcf.state.mi.us/public/specbook/files/2012/208%20SESC.pdf 2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION - SECTION 208]</center>
 +
 
 +
 
 +
==[[#GENERAL|GENERAL]]==
 +
 
 +
# MDOT is responsible to provide transportation services in an environmentally sensitive manner.  To that end, the following Public Acts, sponsored by the Michigan Department of Environment, Great Lakes, and Energy (EGLE) require MDOT to obtain permits and perform various environmental activities to ensure that issues related to a healthy environment are appropriately considered and enacted throughout the life of the state transportation projects and activities.
 +
#: Natural Resources and Environmental Protection Act 1994 PA 451, as amended (the Act).
 +
#: Part 91 of this Act describes MDOT’s responsibilities for Soil Erosion and Sedimentation Control (SESC) measures.
 +
#: Part 31 of this Act describes MDOT’s responsibilities for the National Pollutant Discharge Elimination System (NPDES).  Part 21 of Part 31 of this Act describes the regulations related to NPDES.
 +
#: Natural Resources and Environmental Protection Act 1994 PA 451, as amended.
 +
#: Part 31 of this Act describes MDOT’s responsibilities for floodplains and floodways.  Any work within a floodplain requires a Floodplain Permit and compliance with the State Flood Hazard Management Plan.
 +
#: Part 301 of this Act describes MDOT’s responsibilities for inland lakes and streams.  Any work below the ordinary high water elevation of an inland lake or stream requires an Inland Lakes and Streams Permit.
 +
#: Part 303 of this Act describes MDOT’s responsibilities for wetland protection.  Any work within a wetland requires a State Wetland Permit.  Any unavoidable wetland impacts resulting from construction activities in a regulated wetland must be properly mitigated on a no net loss basis.
 +
#: Part 315 of this Act describes MDOT’s responsibilities for dam safety.  Any construction, enlargement, repair, reconstruction, alteration, removal, or abandonment of any dam requires a Dam Safety Permit.
 +
#: Part 323 of this Act describes MDOT’s responsibilities for shorelands protection and management.  Any removal of vegetation, drainage alterations, land alterations or construction within flood risk, high risk erosion area, or environmental areas requires a Shorelands Protection and Management Permit.
 +
#: Part 325 of this Act describes MDOT’s responsibilities for submerged lands on the Great Lakes.  Any dredging, filling, or related construction activities in, over, or adjacent to any of the Great Lakes require a Great Lakes Submerged Lands Permit.
 +
#: Part 353 of this Act describes MDOT’s responsibilities for sand dunes protection and management. Any vegetation removal, construction, or earth change within a critical dune area requires a Sand Dune Protection and Management Permit.
 +
# SESC and NPDES procedures have been established which, when properly used, will minimize erosion and sedimentation problems associated with construction projects.
 +
#: SESC: EGLE has designated MDOT as an Authorized Public Agency (APA), which requires all earth change activities (regardless of size or location) to follow the SESC Plan (also called SESC Manual), at a minimum.  The Plan is a contract document; as such, the Contractor and the Engineer are responsible for fulfilling the commitments described in the SESC Plan.  As necessary, control measures may be adapted, adjusted, and added to maintain the level of erosion control to comply with the affected Natural Resources and Environmental Protection Act 1994 PA 451, as amended, and project specific permits.
 +
#: The APA designation allows MDOT to undertake earth change activities without obtaining an individual SESC permit.  MDOT is subject to audits by EGLE to determine the conformance to the SESC Plan.
 +
#: NPDES: MDOT need not obtain an NPDES permit.  However, a letter of authorization from EGLE is required.  MDOT is subject to site (project) specific NPDES inspections by EGLE.
 +
# Permits: Non-SESC/NPDES permits are normally obtained during the early preliminary engineering and/or preliminary engineering phases of projects and are to be shown in the contract documents with related pay items.  The Engineer is responsible to administer the permit commitments while the Contractor performs the construction activities described in the contract.  As necessary, and with the written permission of EGLE, control measures may be adapted, adjusted, and added to maintain the level of environmental mitigation activities to comply with the intent of the permit and/or the affected Act.
 +
# Project Carryover: The Contractor is responsible to maintain SESC measures in compliance with the SESC plan until adequate ground cover is established.  If it is determined adequate ground cover is not established prior to the end of a construction season, the Contractor is responsible for the maintenance of the SESC measures during the shutdown periods should there be an unusually warm period resulting in an event causing erosion and/or when a project is allowed to recommence prior to April 16.  The Contractor is responsible for the removal of the SESC measures upon complete ground cover stabilization in the spring or summer of the following construction season.  Stabilization is to be considered when planning the project’s completion dates.
 +
 
 +
{{top}}
 +
 
 +
===[[#Soil Erosion and Sedimentation Control Guidlines|Soil Erosion and Sedimentation Control Guidlines]]===
 +
 
 +
 
 +
====[[#Notification|Notification]]====
 +
 
 +
While individual permits are not necessary, the Engineer is required to notify the appropriate Municipal Enforcing Agency (MEA) or County Enforcing Agency (CEA) (and County Drain Commissioner if a county drain is impacted) of the project.  The MEA or CEA are to receive a copy of the preconstruction meeting minutes.  See the SESC Manual for contact information.
 +
 
 +
{{top}}
 +
 
 +
====[[#Training|Training]]====
 +
 
 +
Those having decision making authority are required to complete SESC training and successfully pass the exam.  This training is available through MSU’s Virtual University program.  EGLE’s web site for learning more about this training is: https://www.michigan.gov/egle/. The exams are offered by EGLE.  EGLE also offers limited-seating classroom instruction for SESC training.  Contact the Construction & Technology Support Area for details and scheduling.
 +
 
 +
{{top}}
 +
 
 +
====[[#Contractor Obligation|Contractor Obligation]]====
 +
 
 +
The Contractor is responsible to construct and maintain SESC measures in keeping with the contract documents and in compliance with the SESC Manual.  Site specific conditions may result in the need to adapt, adjust, and add control measures to maintain the level of erosion control to comply with the Act.  The Engineer is responsible to direct these improvements.
 +
 
 +
If the Contractor is working outside the right-of-way for borrow operations, waste or disposal areas, haul roads, storage sites, or any other earth change activity affecting one acre or more or within 500 feet of a lake or stream, the Contractor must obtain an SESC permit from the applicable MEA or CEA, property owner agreement(s), and other applicable permits from EGLE. A copy of such permits must be submitted to the Engineer.
 +
 
 +
{{top}}
 +
 
 +
====[[#EGLE|EGLE]]====
 +
 
 +
EGLE visits project sites in reaction to complaints, due to interest, and while performing audits of MDOT’s APA status.  Portions of projects found outside the SESC Manual requirements will result in requests for corrective action.  Continued disregard for EGLE concerns or gross violations may result in a Notice of Violation (NOV) being issued to MDOT.  The SESC Manual describes the complaint procedure. The Engineer must direct the appropriate corrective actions for completion within five days of the NOV.  If timely corrective actions are not possible, the Engineer must, within the same five days, submit a plan to EGLE describing the proposed actions.
 +
 
 +
{{top}}
 +
 
 +
===[[#National Pollutant Discharge Elimination System Guidlines|National Pollutant Discharge Elimination System Guidlines]]===
 +
 
 +
 
 +
====[[#Proposal|Proposal]]====
 +
 
 +
The proposal for projects subject to NPDES regulations, earth disturbances of one acre or greater will contain a Special Provision for NPDES Inspection and Response.  Refer to EGLE’s Construction Site Storm Water Manual for comprehensive NPDES procedures.
 +
 
 +
{{top}}
 +
 
 +
====[[#Notification|Notification]]====
 +
 
 +
For projects subject to NPDES regulations, EGLE is to receive a Notice of Coverage (NOC) prior to the start of the project describing the project details. Development staff are to prepare the NOC and submit it to Construction and Technology Support Area.  Construction and Technology staff will submit the NOC to the Bureau of Highways Engineer of Delivery for signature. Once signed, the NOC is returned to Construction and Technology for processing to EGLE.  EGLE provides a letter of authorization.  The TSC delivery staff is to complete the Notice of Termination (NOT) and submit it to Construction and Technology upon project stabilization.
 +
 
 +
[[File:NPDES NOC Chart 11-12-19.pdf|link=//{{SERVERNAME}}/images_construction/f/fe/NPDES_NOC_Chart_11-12-19.pdf|File:NPDES_NOC_Chart_11-12-19.pdf|400px|thumbnail|center|Notice of Coverage (NOC) Chart]]
 +
 
 +
[[File:NPDES NOT Chart 11-12-19.pdf|link=//{{SERVERNAME}}/images_construction/2/26/NPDES_NOT_Chart_11-12-19.pdf|File:NPDES_NOT_Chart_11-12-19.pdf|400px|thumbnail|center|Notice of Termination (NOT) Chart]]
 +
{{top}}
 +
 
 +
====[[#Training|Training]]====
 +
 
 +
Inspectors assigned to perform NPDES inspections are required to be certified Storm Water Operators (SWO).  This self-training is coordinated through the Region Office and the testing is offered once per month by EGLE.  Contact the Michigan Department of Environment, Great Lakes, and Energy (EGLE) district office in your area for further details.
 +
 
 +
{{top}}
 +
 
 +
====[[#Administration|Administration]]====
 +
 
 +
The Engineer is to administer the contract such that the Contractor constructs and properly maintains all applicable temporary and permanent soil erosion control measures.
 +
 
 +
If the Contractor is working outside of the right-of-way for borrow operations, storage or disposal areas, haul roads or any other earth change activity affecting five acres or more, the Contractor must obtain a NPDES permit from Michigan Department of Environment, Great Lakes, and Energy (EGLE).  A copy of any such permit must be submitted to the Engineer prior to the start of work.
 +
 
 +
{{top}}
 +
 
 +
====[[#Inspection|Inspection]]====
 +
 
 +
The project’s SWO is required to perform inspection for NPDES compliance once per week, and within 24 hours after every precipitation event that results in a discharge from the right of way and ensure that any needed corrective actions are carried out.  A log of the inspections and corrective actions shall be maintained on file for review and shall be retained for a period of three years from the date of the inspection or corrective action.  The SWO shall document these inspections and corrective actions onto MDOT’s NPDES [http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1126.pdf Form 1126].  Deficiencies must be brought to the attention of the Contractor, in writing, and this notice must include a deadline for completing the corrective actions.
 +
 
 +
{{top}}
 +
 
 +
====[[#Corrective Actions Deadline|Corrective Actions Deadline]]====
 +
 
 +
If corrective actions are warranted, the SWO will notify the Contractor of the expected actions and provide a timely deadline.  The SWO is to record this notification and subsequent corrective actions on the part of the Contractor. The corrective actions should be completed within seven calendar days.  Emergency corrective actions, related to 1) sedimentation that occurs in streams, drainage structures, or watercourses, or 2) erosion that affects the support of the roadbed, or 3) the safety of the public should be completed within 24 hours.
 +
 
 +
{{top}}
 +
 
 +
===[[#Winter Construction Storm Water Inspection Reports | Winter Construction Storm Water Inspection Reports]]===
 +
 
 +
On March 6, 2013, the Michigan Department of Environment, Great Lakes, and Energy (EGLE) issued revised procedures for winter construction storm water inspections.  EGLE will no longer accept “frozen ground” as a weather condition for determining construction site inspection frequency.  On-site inspections must be resumed within 24 hours of any change in conditions that may allow runoff to occur such as construction operations resuming, rainfall, or warming conditions that will cause snow melt.  Detailed weather conditions must be recorded on Form 1126 National Pollutant Discharge Elimination System (NPDES) and Soil Erosion and Sedimentation Control (SESC).
 +
 
 +
Michigan’s Public Act 451 Storm Water Construction Regulation 323.2190 requires that construction activities on sites one acre or greater in size with a point source discharge to waters of the state be inspected once per week and within 24 hours after every precipitation event that results in a runoff from the site.  During inactive periods when a construction site has been temporarily stabilized and below freezing temperatures predominate, the Certified Storm Water Operator, without performing an on site inspection, may certify on Form 1126 that weather and inactive conditions are such that runoff from the site will not occur.
 +
 
 +
'''Certified Storm Water Operator Procedures'''
 +
<ol type="1">
 +
<li>In order to cease on site weekly inspections during periods of inactive earth change activity during periods of time where discharges from the site are unlikely, each of the following must occur:
 +
<ol type="A">
 +
<li>Ensure that earth change activity has ceased.  Document this condition on Form 1126.</li>
 +
<li>Confirm with an on site inspection that the site has temporary soil erosion and sedimentation control measures implemented to minimize discharge of sediment from the site.  Document this condition on Form 1126.</li>
 +
<li>Document weather conditions.  Weather conditions must be consistently below freezing and unlikely to result in runoff from the site.  Document this condition on Form 1126.</li>
 +
</ol>
 +
Once conditions 1A, 1B, and 1C are met, subsequent weekly inspection documentation may be completed without a site visit by documenting weather conditions for the site location on Form 1126.</li>
 +
 
 +
<li>On site inspections must resume if any of the following occurs:
 +
<ol type="A">
 +
<li>Earth change activity resumes.</li>
 +
<li>Weather conditions are such that snow melt runoff or precipitation in the form of rain is likely to leave the right of way.</li>
 +
<li>Weather conditions are consistently above freezing for several days in a row and the possibility exists for surface runoff, an inspection would be required.</li>
 +
<li>The site becomes unstabilized.</li>
 +
</ol>
 +
</li>
 +
<li>Once any of the conditions identified in 2A 2D occur, on site inspections shall resume within 24 hours.  On site inspections must be performed weekly or within 24 hours of a precipitation event that results in a runoff from the site.</li>
 +
</ol>
 +
These EGLE winter inspection requirements apply to all Local Agency Projects which are covered pursuant to the provisions of Michigan’s Permit-by-Rule (R323.2190) of Part 31.
 +
 
 +
'''Detailed Reporting of Weather Conditions Affecting a Construction Site'''
 +
 
 +
Warming conditions may result in runoff from the site.  However, the ground may still be frozen.  Typical weather condition documentation that is acceptable may be obtained from any reliable weather source.  This documentation should include the reporting period and the high temperature and average for the week.
 +
{{top}}
 +
 
 +
===[[#Non-Compliance Progressive Steps|Non-Compliance Progressive Steps]]===
 +
 
 +
The following are suggested progressive steps to take if a Contractor fails to comply with either the SESC or NPDES regulations.
 +
 
 +
* Issue a work order describing the work to be completed and the applicable deadlines.
 +
 
 +
* Issue a Notice of Non-Compliance with Contract Requirements ([http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1165.pdf Form 1165]) for failure to respond to sedimentation and erosion control needs in a timely manner, with language describing a projected project shutdown date and/or curtailment of biweekly progress estimates if the needs still are not resolved within the appropriate time frames.
 +
 
 +
* Request maintenance (direct or contract forces) to perform the work.  The Contractor is subject to back charges for the costs associated for work performed by others.
 +
 
 +
* In certain situations, it is possible to contract with other specialty Contractors to perform work.  The Contractor may be subject to back charges for the costs associated for work performed by others.
 +
 
 +
* Prepare an interim Contractor Evaluation ([http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1182W.pdf Form 1182W]) documenting problems with SESC/NPDES measures.
 +
 
 +
{{top}}
 +
===[[#Submittal of Notice of Termination|Submittal of Notice of Termination]]===
 +
 
 +
The purpose of this construction manual update is to clarify the requirements for submitting a Notice of Termination (NOT) when a project is completely stabilized.
 +
 
 +
Part 31 of Michigan Public Act 451, the Natural Resources and Environmental Protection Act (NREPA), requires a Notice of Coverage (NOC) be submitted to the Michigan Department of Environment, Great Lakes, and Energy (EGLE) for those projects which create an earth disturbance of five acres or more and have a storm water discharge to the waters of the state. The NOC is submitted during the project design phase. When a NOC is required, a Notice of Termination (NOT) is also required to be submitted to EGLE when the project is stabilized. The NOT submittal is critical for compliance with NREPA and the MDOT Storm Water Permit.
 +
 
 +
Prior to NOT submittal, the region resource specialist or the region soils engineer must inspect the site and concur that it is stabilized. A site is considered stabilized when all temporary soil erosion and sedimentation control (SESC) measures have been removed, permanent SESC measures installed, and vegetation well established. SESC inspections must continue and be documented until the site is stabilized and the NOT has been submitted to the Michigan Department of Environment, Great Lakes, and Energy (EGLE).
 +
 
 +
The region resource specialist or region soils engineer will notify the resource specialist in the Bureau of Bridges and Structures Geotechnical Section that the site has been stabilized. The resource specialist in the Bureau of Bridges and Structures will submit the NOT and distribute copies to the respective construction engineer, resource specialist, and/or region soils engineer.
 +
 
 +
Once the NOT for a project has been submitted, the site will be subject to final inspection by EGLE to ensure the site is completely stabilized prior to acceptance of the NOT. Further information can be found in the MDOT SESC Manual, which is available at:
 +
 
 +
[http://www.michigan.gov/documents/2006_SESC_Manual_165226_7.pdf http://www.michigan.gov/documents/2006_SESC_Manual_165226_7.pdf]
 +
 
 +
==[[#MATERIALS|MATERIALS]]==
 +
 
 +
<span style="color: red"> -Reserved- </span>
 +
 
 +
{{top}}
 +
 
 +
==[[#CONSTRUCTION|CONSTRUCTION]]==
 +
 
 +
<span style="color: red"> -Reserved- </span>
 +
 
 +
{{top}}
 +
 
 +
==[[#MEASUREMENT AND PAYMENT|MEASUREMENT AND PAYMENT]]==
 +
 
 +
<span style="color: red"> -Reserved- </span>
 +
 
 +
{{top}}
 +
 
 +
[[Category:Construction Manual]]

Revision as of 16:22, 12 November 2019

208
Soil Erosion and Sedimentation Control
2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION - SECTION 208


GENERAL

  1. MDOT is responsible to provide transportation services in an environmentally sensitive manner. To that end, the following Public Acts, sponsored by the Michigan Department of Environment, Great Lakes, and Energy (EGLE) require MDOT to obtain permits and perform various environmental activities to ensure that issues related to a healthy environment are appropriately considered and enacted throughout the life of the state transportation projects and activities.
    Natural Resources and Environmental Protection Act 1994 PA 451, as amended (the Act).
    Part 91 of this Act describes MDOT’s responsibilities for Soil Erosion and Sedimentation Control (SESC) measures.
    Part 31 of this Act describes MDOT’s responsibilities for the National Pollutant Discharge Elimination System (NPDES). Part 21 of Part 31 of this Act describes the regulations related to NPDES.
    Natural Resources and Environmental Protection Act 1994 PA 451, as amended.
    Part 31 of this Act describes MDOT’s responsibilities for floodplains and floodways. Any work within a floodplain requires a Floodplain Permit and compliance with the State Flood Hazard Management Plan.
    Part 301 of this Act describes MDOT’s responsibilities for inland lakes and streams. Any work below the ordinary high water elevation of an inland lake or stream requires an Inland Lakes and Streams Permit.
    Part 303 of this Act describes MDOT’s responsibilities for wetland protection. Any work within a wetland requires a State Wetland Permit. Any unavoidable wetland impacts resulting from construction activities in a regulated wetland must be properly mitigated on a no net loss basis.
    Part 315 of this Act describes MDOT’s responsibilities for dam safety. Any construction, enlargement, repair, reconstruction, alteration, removal, or abandonment of any dam requires a Dam Safety Permit.
    Part 323 of this Act describes MDOT’s responsibilities for shorelands protection and management. Any removal of vegetation, drainage alterations, land alterations or construction within flood risk, high risk erosion area, or environmental areas requires a Shorelands Protection and Management Permit.
    Part 325 of this Act describes MDOT’s responsibilities for submerged lands on the Great Lakes. Any dredging, filling, or related construction activities in, over, or adjacent to any of the Great Lakes require a Great Lakes Submerged Lands Permit.
    Part 353 of this Act describes MDOT’s responsibilities for sand dunes protection and management. Any vegetation removal, construction, or earth change within a critical dune area requires a Sand Dune Protection and Management Permit.
  2. SESC and NPDES procedures have been established which, when properly used, will minimize erosion and sedimentation problems associated with construction projects.
    SESC: EGLE has designated MDOT as an Authorized Public Agency (APA), which requires all earth change activities (regardless of size or location) to follow the SESC Plan (also called SESC Manual), at a minimum. The Plan is a contract document; as such, the Contractor and the Engineer are responsible for fulfilling the commitments described in the SESC Plan. As necessary, control measures may be adapted, adjusted, and added to maintain the level of erosion control to comply with the affected Natural Resources and Environmental Protection Act 1994 PA 451, as amended, and project specific permits.
    The APA designation allows MDOT to undertake earth change activities without obtaining an individual SESC permit. MDOT is subject to audits by EGLE to determine the conformance to the SESC Plan.
    NPDES: MDOT need not obtain an NPDES permit. However, a letter of authorization from EGLE is required. MDOT is subject to site (project) specific NPDES inspections by EGLE.
  3. Permits: Non-SESC/NPDES permits are normally obtained during the early preliminary engineering and/or preliminary engineering phases of projects and are to be shown in the contract documents with related pay items. The Engineer is responsible to administer the permit commitments while the Contractor performs the construction activities described in the contract. As necessary, and with the written permission of EGLE, control measures may be adapted, adjusted, and added to maintain the level of environmental mitigation activities to comply with the intent of the permit and/or the affected Act.
  4. Project Carryover: The Contractor is responsible to maintain SESC measures in compliance with the SESC plan until adequate ground cover is established. If it is determined adequate ground cover is not established prior to the end of a construction season, the Contractor is responsible for the maintenance of the SESC measures during the shutdown periods should there be an unusually warm period resulting in an event causing erosion and/or when a project is allowed to recommence prior to April 16. The Contractor is responsible for the removal of the SESC measures upon complete ground cover stabilization in the spring or summer of the following construction season. Stabilization is to be considered when planning the project’s completion dates.

[top of page]


Soil Erosion and Sedimentation Control Guidlines

Notification

While individual permits are not necessary, the Engineer is required to notify the appropriate Municipal Enforcing Agency (MEA) or County Enforcing Agency (CEA) (and County Drain Commissioner if a county drain is impacted) of the project. The MEA or CEA are to receive a copy of the preconstruction meeting minutes. See the SESC Manual for contact information.

[top of page]


Training

Those having decision making authority are required to complete SESC training and successfully pass the exam. This training is available through MSU’s Virtual University program. EGLE’s web site for learning more about this training is: https://www.michigan.gov/egle/. The exams are offered by EGLE. EGLE also offers limited-seating classroom instruction for SESC training. Contact the Construction & Technology Support Area for details and scheduling.

[top of page]


Contractor Obligation

The Contractor is responsible to construct and maintain SESC measures in keeping with the contract documents and in compliance with the SESC Manual. Site specific conditions may result in the need to adapt, adjust, and add control measures to maintain the level of erosion control to comply with the Act. The Engineer is responsible to direct these improvements.

If the Contractor is working outside the right-of-way for borrow operations, waste or disposal areas, haul roads, storage sites, or any other earth change activity affecting one acre or more or within 500 feet of a lake or stream, the Contractor must obtain an SESC permit from the applicable MEA or CEA, property owner agreement(s), and other applicable permits from EGLE. A copy of such permits must be submitted to the Engineer.

[top of page]


EGLE

EGLE visits project sites in reaction to complaints, due to interest, and while performing audits of MDOT’s APA status. Portions of projects found outside the SESC Manual requirements will result in requests for corrective action. Continued disregard for EGLE concerns or gross violations may result in a Notice of Violation (NOV) being issued to MDOT. The SESC Manual describes the complaint procedure. The Engineer must direct the appropriate corrective actions for completion within five days of the NOV. If timely corrective actions are not possible, the Engineer must, within the same five days, submit a plan to EGLE describing the proposed actions.

[top of page]


National Pollutant Discharge Elimination System Guidlines

Proposal

The proposal for projects subject to NPDES regulations, earth disturbances of one acre or greater will contain a Special Provision for NPDES Inspection and Response. Refer to EGLE’s Construction Site Storm Water Manual for comprehensive NPDES procedures.

[top of page]


Notification

For projects subject to NPDES regulations, EGLE is to receive a Notice of Coverage (NOC) prior to the start of the project describing the project details. Development staff are to prepare the NOC and submit it to Construction and Technology Support Area. Construction and Technology staff will submit the NOC to the Bureau of Highways Engineer of Delivery for signature. Once signed, the NOC is returned to Construction and Technology for processing to EGLE. EGLE provides a letter of authorization. The TSC delivery staff is to complete the Notice of Termination (NOT) and submit it to Construction and Technology upon project stabilization.

Notice of Coverage (NOC) Chart
Notice of Termination (NOT) Chart

[top of page]


Training

Inspectors assigned to perform NPDES inspections are required to be certified Storm Water Operators (SWO). This self-training is coordinated through the Region Office and the testing is offered once per month by EGLE. Contact the Michigan Department of Environment, Great Lakes, and Energy (EGLE) district office in your area for further details.

[top of page]


Administration

The Engineer is to administer the contract such that the Contractor constructs and properly maintains all applicable temporary and permanent soil erosion control measures.

If the Contractor is working outside of the right-of-way for borrow operations, storage or disposal areas, haul roads or any other earth change activity affecting five acres or more, the Contractor must obtain a NPDES permit from Michigan Department of Environment, Great Lakes, and Energy (EGLE). A copy of any such permit must be submitted to the Engineer prior to the start of work.

[top of page]


Inspection

The project’s SWO is required to perform inspection for NPDES compliance once per week, and within 24 hours after every precipitation event that results in a discharge from the right of way and ensure that any needed corrective actions are carried out. A log of the inspections and corrective actions shall be maintained on file for review and shall be retained for a period of three years from the date of the inspection or corrective action. The SWO shall document these inspections and corrective actions onto MDOT’s NPDES Form 1126. Deficiencies must be brought to the attention of the Contractor, in writing, and this notice must include a deadline for completing the corrective actions.

[top of page]


Corrective Actions Deadline

If corrective actions are warranted, the SWO will notify the Contractor of the expected actions and provide a timely deadline. The SWO is to record this notification and subsequent corrective actions on the part of the Contractor. The corrective actions should be completed within seven calendar days. Emergency corrective actions, related to 1) sedimentation that occurs in streams, drainage structures, or watercourses, or 2) erosion that affects the support of the roadbed, or 3) the safety of the public should be completed within 24 hours.

[top of page]


Winter Construction Storm Water Inspection Reports

On March 6, 2013, the Michigan Department of Environment, Great Lakes, and Energy (EGLE) issued revised procedures for winter construction storm water inspections. EGLE will no longer accept “frozen ground” as a weather condition for determining construction site inspection frequency. On-site inspections must be resumed within 24 hours of any change in conditions that may allow runoff to occur such as construction operations resuming, rainfall, or warming conditions that will cause snow melt. Detailed weather conditions must be recorded on Form 1126 National Pollutant Discharge Elimination System (NPDES) and Soil Erosion and Sedimentation Control (SESC).

Michigan’s Public Act 451 Storm Water Construction Regulation 323.2190 requires that construction activities on sites one acre or greater in size with a point source discharge to waters of the state be inspected once per week and within 24 hours after every precipitation event that results in a runoff from the site. During inactive periods when a construction site has been temporarily stabilized and below freezing temperatures predominate, the Certified Storm Water Operator, without performing an on site inspection, may certify on Form 1126 that weather and inactive conditions are such that runoff from the site will not occur.

Certified Storm Water Operator Procedures

  1. In order to cease on site weekly inspections during periods of inactive earth change activity during periods of time where discharges from the site are unlikely, each of the following must occur:
    1. Ensure that earth change activity has ceased. Document this condition on Form 1126.
    2. Confirm with an on site inspection that the site has temporary soil erosion and sedimentation control measures implemented to minimize discharge of sediment from the site. Document this condition on Form 1126.
    3. Document weather conditions. Weather conditions must be consistently below freezing and unlikely to result in runoff from the site. Document this condition on Form 1126.
    Once conditions 1A, 1B, and 1C are met, subsequent weekly inspection documentation may be completed without a site visit by documenting weather conditions for the site location on Form 1126.
  2. On site inspections must resume if any of the following occurs:
    1. Earth change activity resumes.
    2. Weather conditions are such that snow melt runoff or precipitation in the form of rain is likely to leave the right of way.
    3. Weather conditions are consistently above freezing for several days in a row and the possibility exists for surface runoff, an inspection would be required.
    4. The site becomes unstabilized.
  3. Once any of the conditions identified in 2A 2D occur, on site inspections shall resume within 24 hours. On site inspections must be performed weekly or within 24 hours of a precipitation event that results in a runoff from the site.

These EGLE winter inspection requirements apply to all Local Agency Projects which are covered pursuant to the provisions of Michigan’s Permit-by-Rule (R323.2190) of Part 31.

Detailed Reporting of Weather Conditions Affecting a Construction Site

Warming conditions may result in runoff from the site. However, the ground may still be frozen. Typical weather condition documentation that is acceptable may be obtained from any reliable weather source. This documentation should include the reporting period and the high temperature and average for the week.

[top of page]


Non-Compliance Progressive Steps

The following are suggested progressive steps to take if a Contractor fails to comply with either the SESC or NPDES regulations.

  • Issue a work order describing the work to be completed and the applicable deadlines.
  • Issue a Notice of Non-Compliance with Contract Requirements (Form 1165) for failure to respond to sedimentation and erosion control needs in a timely manner, with language describing a projected project shutdown date and/or curtailment of biweekly progress estimates if the needs still are not resolved within the appropriate time frames.
  • Request maintenance (direct or contract forces) to perform the work. The Contractor is subject to back charges for the costs associated for work performed by others.
  • In certain situations, it is possible to contract with other specialty Contractors to perform work. The Contractor may be subject to back charges for the costs associated for work performed by others.
  • Prepare an interim Contractor Evaluation (Form 1182W) documenting problems with SESC/NPDES measures.

[top of page]


Submittal of Notice of Termination

The purpose of this construction manual update is to clarify the requirements for submitting a Notice of Termination (NOT) when a project is completely stabilized.

Part 31 of Michigan Public Act 451, the Natural Resources and Environmental Protection Act (NREPA), requires a Notice of Coverage (NOC) be submitted to the Michigan Department of Environment, Great Lakes, and Energy (EGLE) for those projects which create an earth disturbance of five acres or more and have a storm water discharge to the waters of the state. The NOC is submitted during the project design phase. When a NOC is required, a Notice of Termination (NOT) is also required to be submitted to EGLE when the project is stabilized. The NOT submittal is critical for compliance with NREPA and the MDOT Storm Water Permit.

Prior to NOT submittal, the region resource specialist or the region soils engineer must inspect the site and concur that it is stabilized. A site is considered stabilized when all temporary soil erosion and sedimentation control (SESC) measures have been removed, permanent SESC measures installed, and vegetation well established. SESC inspections must continue and be documented until the site is stabilized and the NOT has been submitted to the Michigan Department of Environment, Great Lakes, and Energy (EGLE).

The region resource specialist or region soils engineer will notify the resource specialist in the Bureau of Bridges and Structures Geotechnical Section that the site has been stabilized. The resource specialist in the Bureau of Bridges and Structures will submit the NOT and distribute copies to the respective construction engineer, resource specialist, and/or region soils engineer.

Once the NOT for a project has been submitted, the site will be subject to final inspection by EGLE to ensure the site is completely stabilized prior to acceptance of the NOT. Further information can be found in the MDOT SESC Manual, which is available at:

http://www.michigan.gov/documents/2006_SESC_Manual_165226_7.pdf

MATERIALS

-Reserved-

[top of page]


CONSTRUCTION

-Reserved-

[top of page]


MEASUREMENT AND PAYMENT

-Reserved-

[top of page]