Difference between revisions of "405 - Pump Station Construction"

From MediaWiki
Jump to navigation Jump to search
m
Line 7: Line 7:
  
  
==GENERAL==
+
==[[#GENERAL|GENERAL]]==
  
 
Pump station construction is extremely specialized work.  For this reason, if a pump station is to be constructed, Section [http://mdotcf.state.mi.us/public/specbook/files/2012/405%20Pump%20Station%20Constr.pdf 405] of the Standard Specifications for Construction, the plans and all other specifications should be closely followed.  It is important for the inspector to know that a licensed electrical Contractor is required to perform all electrical work shown on the plans.  The Contractor is to guarantee the in-service operation of the mechanical and electrical equipment and related components for a period of six months following acceptance of the total contract, or as defined in the proposal, at which time all unexpired manufacturer’s equipment warranties will be assigned to MDOT.  Refer to [[819 - Electrical and Lighting|Division 8]] of this manual for further information on electrical requirements on pump stations.
 
Pump station construction is extremely specialized work.  For this reason, if a pump station is to be constructed, Section [http://mdotcf.state.mi.us/public/specbook/files/2012/405%20Pump%20Station%20Constr.pdf 405] of the Standard Specifications for Construction, the plans and all other specifications should be closely followed.  It is important for the inspector to know that a licensed electrical Contractor is required to perform all electrical work shown on the plans.  The Contractor is to guarantee the in-service operation of the mechanical and electrical equipment and related components for a period of six months following acceptance of the total contract, or as defined in the proposal, at which time all unexpired manufacturer’s equipment warranties will be assigned to MDOT.  Refer to [[819 - Electrical and Lighting|Division 8]] of this manual for further information on electrical requirements on pump stations.
Line 13: Line 13:
 
{{top}}
 
{{top}}
  
==MATERIALS==
+
==[[#MATERIALS|MATERIALS]]==
  
 
<span style="color: red"> -Reserved- </span>
 
<span style="color: red"> -Reserved- </span>
Line 19: Line 19:
 
{{top}}
 
{{top}}
  
==CONSTRUCTION==
+
==[[#CONSTRUCTION|CONSTRUCTION]]==
  
 
<span style="color: red"> -Reserved- </span>
 
<span style="color: red"> -Reserved- </span>
Line 25: Line 25:
 
{{top}}
 
{{top}}
  
==MEASUREMENT AND PAYMENT==
+
==[[#MEASUREMENT AND PAYMENT|MEASUREMENT AND PAYMENT]]==
  
 
<span style="color: red"> -Reserved- </span>
 
<span style="color: red"> -Reserved- </span>
  
 
{{top}}
 
{{top}}
 +
 +
[[Category: Construction Manual]]

Revision as of 14:45, 29 July 2013

405
Pump Station Construction
2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION - SECTION 405


GENERAL

Pump station construction is extremely specialized work. For this reason, if a pump station is to be constructed, Section 405 of the Standard Specifications for Construction, the plans and all other specifications should be closely followed. It is important for the inspector to know that a licensed electrical Contractor is required to perform all electrical work shown on the plans. The Contractor is to guarantee the in-service operation of the mechanical and electrical equipment and related components for a period of six months following acceptance of the total contract, or as defined in the proposal, at which time all unexpired manufacturer’s equipment warranties will be assigned to MDOT. Refer to Division 8 of this manual for further information on electrical requirements on pump stations.

[top of page]


MATERIALS

-Reserved-

[top of page]


CONSTRUCTION

-Reserved-

[top of page]


MEASUREMENT AND PAYMENT

-Reserved-

[top of page]