Difference between revisions of "405 - Pump Station Construction"
m |
|||
Line 11: | Line 11: | ||
Pump station construction is extremely specialized work. For this reason, if a pump station is to be constructed, Section [http://mdotcf.state.mi.us/public/specbook/files/2012/405%20Pump%20Station%20Constr.pdf 405] of the Standard Specifications for Construction, the plans and all other specifications should be closely followed. It is important for the inspector to know that a licensed electrical Contractor is required to perform all electrical work shown on the plans. The Contractor is to guarantee the in-service operation of the mechanical and electrical equipment and related components for a period of six months following acceptance of the total contract, or as defined in the proposal, at which time all unexpired manufacturer’s equipment warranties will be assigned to MDOT. Refer to [[819 - Electrical and Lighting|Division 8]] of this manual for further information on electrical requirements on pump stations. | Pump station construction is extremely specialized work. For this reason, if a pump station is to be constructed, Section [http://mdotcf.state.mi.us/public/specbook/files/2012/405%20Pump%20Station%20Constr.pdf 405] of the Standard Specifications for Construction, the plans and all other specifications should be closely followed. It is important for the inspector to know that a licensed electrical Contractor is required to perform all electrical work shown on the plans. The Contractor is to guarantee the in-service operation of the mechanical and electrical equipment and related components for a period of six months following acceptance of the total contract, or as defined in the proposal, at which time all unexpired manufacturer’s equipment warranties will be assigned to MDOT. Refer to [[819 - Electrical and Lighting|Division 8]] of this manual for further information on electrical requirements on pump stations. | ||
+ | {{top}} | ||
==MATERIALS== | ==MATERIALS== | ||
Line 16: | Line 17: | ||
<span style="color: red"> -Reserved- </span> | <span style="color: red"> -Reserved- </span> | ||
+ | {{top}} | ||
==CONSTRUCTION== | ==CONSTRUCTION== | ||
Line 21: | Line 23: | ||
<span style="color: red"> -Reserved- </span> | <span style="color: red"> -Reserved- </span> | ||
+ | {{top}} | ||
==MEASUREMENT AND PAYMENT== | ==MEASUREMENT AND PAYMENT== | ||
<span style="color: red"> -Reserved- </span> | <span style="color: red"> -Reserved- </span> | ||
+ | |||
+ | {{top}} |
Revision as of 13:41, 25 June 2013
GENERAL
Pump station construction is extremely specialized work. For this reason, if a pump station is to be constructed, Section 405 of the Standard Specifications for Construction, the plans and all other specifications should be closely followed. It is important for the inspector to know that a licensed electrical Contractor is required to perform all electrical work shown on the plans. The Contractor is to guarantee the in-service operation of the mechanical and electrical equipment and related components for a period of six months following acceptance of the total contract, or as defined in the proposal, at which time all unexpired manufacturer’s equipment warranties will be assigned to MDOT. Refer to Division 8 of this manual for further information on electrical requirements on pump stations.
MATERIALS
-Reserved-
CONSTRUCTION
-Reserved-
MEASUREMENT AND PAYMENT
-Reserved-