Difference between revisions of "502 - HMA Crack Treatment"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
502 - HMA Construction Practices | 502 - HMA Construction Practices | ||
− | * [[ | + | * [[502.01 - Materials]] |
− | * [[ | + | * [[502.02 - Equipment]] |
− | * [[ | + | * [[502.03 - Surface Preperation]] |
− | * [[ | + | * [[502.04 - Adjusting Drainage Structures]] |
− | * [[ | + | * [[502.05 - Wedging]] |
− | * [[ | + | * [[502.06 - Bond Coat]] |
− | * [[ | + | * [[502.07 - Placing HMA Mixture]] |
− | * [[ | + | * [[502.08 - Joints]] |
− | * [[ | + | * [[502.09 - Compaction]] |
− | * [[ | + | * [[502.10 - Coring]] |
− | * [[ | + | * [[502.11 - Surface Defects]] |
− | * [[ | + | * [[502.12 - Surface Tolerances]] |
− | * [[ | + | * [[502.13 - Payment]] |
− | * [[ | + | * [[502.14 - Paving Inspector's Checklist]] |
− | * [[ | + | * [[502.15 - Mat Troubleshooting Guide]] |
− | * [[ | + | * [[502.16 - MDOT Standard Practice for Random Sampling of HMA Materials]] |
− | * [[ | + | * [[502.17 - Temporary Patching with HMA Mixtures]] |
− | * [[ | + | * [[502.18 - Glossary of Paving Terms]] |
Revision as of 15:42, 23 May 2013
502 - HMA Construction Practices
- 502.01 - Materials
- 502.02 - Equipment
- 502.03 - Surface Preperation
- 502.04 - Adjusting Drainage Structures
- 502.05 - Wedging
- 502.06 - Bond Coat
- 502.07 - Placing HMA Mixture
- 502.08 - Joints
- 502.09 - Compaction
- 502.10 - Coring
- 502.11 - Surface Defects
- 502.12 - Surface Tolerances
- 502.13 - Payment
- 502.14 - Paving Inspector's Checklist
- 502.15 - Mat Troubleshooting Guide
- 502.16 - MDOT Standard Practice for Random Sampling of HMA Materials
- 502.17 - Temporary Patching with HMA Mixtures
- 502.18 - Glossary of Paving Terms