502 - HMA Crack Treatment
Jump to navigation
Jump to search
502 - HMA Construction Practices
- 502.01 - Materials
- 502.02 - Equipment
- 502.03 - Surface Preperation
- 502.04 - Adjusting Drainage Structures
- 502.05 - Wedging
- 502.06 - Bond Coat
- 502.07 - Placing HMA Mixture
- 502.08 - Joints
- 502.09 - Compaction
- 502.10 - Coring
- 502.11 - Surface Defects
- 502.12 - Surface Tolerances
- 502.13 - Payment
- 502.14 - Paving Inspector's Checklist
- 502.15 - Mat Troubleshooting Guide
- 502.16 - MDOT Standard Practice for Random Sampling of HMA Materials
- 502.17 - Temporary Patching with HMA Mixtures
- 502.18 - Glossary of Paving Terms