502 - HMA Crack Treatment
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
502 - HMA Construction Practices
- 502.01 - Materials
- 502.02 - Equipment
- 502.03 - Surface Preperation
- 502.04 - Adjusting Drainage Structures
- 502.05 - Wedging
- 502.06 - Bond Coat
- 502.07 - Placing HMA Mixture
- 502.08 - Joints
- 502.09 - Compaction
- 502.10 - Coring
- 502.11 - Surface Defects
- 502.12 - Surface Tolerances
- 502.13 - Payment
- 502.14 - Paving Inspector's Checklist
- 502.15 - Mat Troubleshooting Guide
- 502.16 - MDOT Standard Practice for Random Sampling of HMA Materials
- 502.17 - Temporary Patching with HMA Mixtures
- 502.18 - Glossary of Paving Terms