<center><span STYLE="font: 40pt arial;">'''Micro-Surfacing'''</span></center>
 
<center><span STYLE="font: 40pt arial;">'''Micro-Surfacing'''</span></center>
  
<center>[http://mdotcf.state.mi.us/public/specbook/files/2012/504%20Micro-Surfacing.pdf 2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION - SECTION 504]</center>
 
  
  
Line 21: Line 20:
 
==[[#CONSTRUCTION|CONSTRUCTION]]==
 
==[[#CONSTRUCTION|CONSTRUCTION]]==
  
Before placing the mixture, the Contractor shall thoroughly clean the existing surface of all loose materials, vegetation, dirt, dust, mud and other objectionable materials.  The Contractor also shall remove all plastic pavement markings using an abrasion method.
+
===[[#Surface Preparation|Surface Preparation]]===
  
Micro-surfacing shall be applied in a manner to fill ruts and minor cracks, and leave a uniform, smooth surface with straight edges.  Drainage structures, monument boxes, water shutoffs, etc. shall be protected during the application of the mixture.
+
Before placing the mixture, the Contractor shall thoroughly clean the existing surface of all loose materials, vegetation, dirt, dust, mud and other objectionable materials. The Contractor also shall remove all pavement markings using an abrasion method.
  
A micro-surface mix with 3FA shall be applied with an approved rut box for each wheel path.  Each pass of rut filling shall be limited to a maximum depth of 1 inch (25 mm).
+
Centerline rumble strips must be adequately filled to allow for the regrinding of the rumbles at the end of the projectThis can be done using two different methods.  The first method is to make a separate pass to fill the rumbles prior to the leveling course.  The second method is to extend each pass; leveling and top course for each lane, over the centerline rumbles essentially filling them 4 times.  
 
 
Each rutted wheel track shall be slightly over-crowned to allow for some consolidation by traffic.
 
 
 
{{top}}
 
 
 
===[[#Standard Treatment|Standard Treatment]]===
 
 
 
Standard micro-surfacing shall be applied full lane width in two courses for a total application rate of 25 pounds/square yard (14 kg/m<sup>2</sup>).  The first course shall be 10 pounds/square yard (6 kg/m<sup>2</sup>); the second course shall be 15 pounds/square yard (8 kg/m<sup>2</sup>).
 
 
 
The finished surface should be free from excessive scratch marks, tears, rippling and other surface irregularities.  The longitudinal construction joints and lane edges shall coincide with the painted lane lines.
 
 
 
{{top}}
 
 
 
===[[#Traffic Control|Traffic Control]]===
 
 
 
Traffic shall not be allowed on the mixture until it has cured sufficiently to prevent pick up by vehicle tires.  The new surface shall be capable of carrying normal traffic within one hour after application without any damage occurring.
 
 
 
{{top}}
 
 
 
===[[#Weather|Weather]]===
 
 
 
Placement is not permitted if there is rain, or threatening weather, and temperatures are forecast to be below 32°F (0°C) within 24 hours of completion of the workThe mixture cannot be placed when the air and pavement surface temperatures are below 45°F (7°C).
 
 
 
{{top}}
 
 
 
===[[#Equipment|Equipment]]===
 
 
 
 
 
====[[#Mixing Machine|Mixing Machine]]====
 
 
 
The mixing machine shall be equipped with a positive connection conveyer belt aggregate delivery system and an inter-connected positive displacement, water-jacketed gear pump to accurately proportion aggregate and asphalt emulsion.  The filler feed must be located so the proper amount of filler is dropped on the aggregate before discharging into the pug mill.  A minimum of two truck-mounted machines will be required at all times.  The Contractor shall cycle these machines so as not to delay mixture production by more than 15 minutes.  If at any time this requirement is not met, production should be stopped.
 
 
 
{{top}}
 
 
 
====[[#Spreader Box|Spreader Box]]====
 
 
 
The mixture shall be spread uniformly by a mechanical tube spreader box attached to the mixer and equipped with paddles mounted on adjustable shafts to continually agitate and distribute the mixture.  The spreader box shall be equipped with front and rear flexible seals to achieve direct contact with the road surface.  When a two-course application is called for, the first pass shall be made using a metal or stiff rubber strike off on the box.  The final pass, or surface pass, shall use a secondary strike off to provide a finished smooth surface texture.
 
 
 
{{top}}
 
 
 
====[[#Rut Box|Rut Box]]====
 
 
 
The rut filling application shall be achieved with a steel V-shaped configuration screed (rut box) specifically designed to fill ruts.  The rut box shall achieve a mixture spread width of 5 to 6 feet (1.5 to 1.8 meters) and have a secondary strike off to control crown and texture.
 
 
 
{{top}}
 
 
 
====[[#Miscellaneous Equipment|Miscellaneous Equipment]]====
 
 
 
Hand squeegees, shovels and other equipment shall be provided as necessary to perform the work.  Cleaning equipment, such as power brooms, air compressors, water flushing equipment and hand brooms shall be adequate for surface preparation.
 
  
 
{{top}}
 
{{top}}
Line 83: Line 33:
 
===[[#Delayed Acceptance|Delayed Acceptance]]===
 
===[[#Delayed Acceptance|Delayed Acceptance]]===
  
The Contractor is responsible for placing a uniform product.  This type of work has a 30 day delayed acceptance procedure so that any major problems will be corrected by the Contractor before the project can be accepted.  In most cases, the inspector has little to do with the micro-surfacing operation itself, but must ensure that traffic control is conducted properly and that all safety rules are followed.
+
<span style="color: red"> -Reserved- </span>
 
 
If the inspector notices a nonuniform application, any traffic control or safety violations, the Contractor must be notified immediately.  If the Contractor does not correct the violation, the project should be stopped.
 
  
 
{{top}}
 
{{top}}
  
 
[[Category:Construction Manual]]
 
[[Category:Construction Manual]]
 +
[[Category:Division 5]]
 +
[[Category:Section 504]]

Latest revision as of 18:17, 15 December 2021

504
Micro-Surfacing


GENERAL

-Reserved-

[top of page]


MATERIALS

-Reserved-

[top of page]


CONSTRUCTION

Surface Preparation

Before placing the mixture, the Contractor shall thoroughly clean the existing surface of all loose materials, vegetation, dirt, dust, mud and other objectionable materials. The Contractor also shall remove all pavement markings using an abrasion method.

Centerline rumble strips must be adequately filled to allow for the regrinding of the rumbles at the end of the project. This can be done using two different methods. The first method is to make a separate pass to fill the rumbles prior to the leveling course. The second method is to extend each pass; leveling and top course for each lane, over the centerline rumbles essentially filling them 4 times.