Difference between revisions of "504 - Micro-Surfacing"
Jump to navigation
Jump to search
504
Micro-Surfacing
2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION - SECTION 504
Line 34: | Line 34: | ||
===[[#Delayed Acceptance|Delayed Acceptance]]=== | ===[[#Delayed Acceptance|Delayed Acceptance]]=== | ||
− | + | <span style="color: red"> -Reserved- </span> | |
− | |||
− | |||
{{top}} | {{top}} | ||
[[Category:Construction Manual]] | [[Category:Construction Manual]] |
Revision as of 11:45, 27 June 2014
GENERAL
-Reserved-
MATERIALS
-Reserved-
CONSTRUCTION
Surface Preparation
Before placing the mixture, the Contractor shall thoroughly clean the existing surface of all loose materials, vegetation, dirt, dust, mud and other objectionable materials. The Contractor also shall remove all pavement markings using an abrasion method.
Centerline rumble strips must be adequately filled to allow for the regrinding of the rumbles at the end of the project. This can be done using two different methods. The first method is to make a separate pass to fill the rumbles prior to the leveling course. The second method is to extend each pass; leveling and top course for each lane, over the centerline rumbles essentially filling them 4 times.
MEASUREMENT AND PAYMENT
Delayed Acceptance
-Reserved-