819 - Electrical and Lighting

From MediaWiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
819
Electrical and Lighting


GENERAL DESCRIPTION

-Reserved-

[top of page]



MATERIALS

Electrical and Lighting Conduit

Labeled conduit is defined as having the certification mark (as shown on the following NRTL website for each laboratory) of the testing laboratory printed, stamped or otherwise physically on the conduit. The NRTLs can be found at the following website:

https://www.osha.gov/dts/otpca/nrtl/nrtllist.html


[top of page]


EQUIPMENT

-Reserved-

[top of page]


PRECONSTRUCTION

-Reserved-

[top of page]



CONSTRUCTION

-Reserved-

[top of page]


INSPECTION & TESTING

Initial Inspection

This inspection should be performed shortly after an asset is constructed. Please reference Section 810 for initial asset inspection procedures of frangible light pole structures, non-frangible light pole structures, and tower lighting structures.

[top of page]


MEASUREMENT, DOCMENTATION & PAYMENT

-Reserved-

[top of page]