Difference between revisions of "824 - Contractor Staking"
Jump to navigation
Jump to search
824
Contractor Staking
2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION - SECTION 824
(Created page with " <center><span STYLE="font: 60pt arial;">'''824'''</span></center> <center><span STYLE="font: 40pt arial;">'''Contractor Staking'''</span></center> <center>[http://mdotcf.st...") |
m (→CONSTRUCTION: Added subheading "Use of Automated Machine Guidance (AMG)" along with content and attachments as a part of CMU 2016-001) |
||
(3 intermediate revisions by one other user not shown) | |||
Line 7: | Line 7: | ||
− | ==GENERAL== | + | ==[[#GENERAL|GENERAL]]== |
− | <span style="color: red"> -Reserved- <span> | + | <span style="color: red"> -Reserved- </span> |
+ | {{top}} | ||
− | ==MATERIALS== | + | ==[[#MATERIALS|MATERIALS]]== |
− | <span style="color: red"> -Reserved- <span> | + | <span style="color: red"> -Reserved- </span> |
+ | {{top}} | ||
− | ==CONSTRUCTION== | + | ==[[#CONSTRUCTION|CONSTRUCTION]]== |
+ | {{top}} | ||
− | + | ====[[#Use of Automated Machine Guidance (AMG)|Use of Automated Machine Guidance (AMG)]]==== | |
+ | The following information will serve as guidance for the administration of projects that incorporate the Special Provision for Automated Machine Guidance (AMG). The documentation is specific for AMG projects and supplements information for the Engineer in the special provision for the administration of AMG work. These procedures apply to all federal and state funded projects that use the AMG process. | ||
+ | [[File:CMU16-001 AMG Attachment Final.pdf|500px|thumbnail|center|Automated Machine Guidance]] | ||
− | + | [[File:CMU16-001 AMG Sample Work Plan Final.pdf|500px|thumbnail|center|AMG Sample Work Plan]] | |
− | <span style="color: red"> -Reserved- <span> | + | [[File:CMU16-001 AMG Verification Form Final.pdf|500px|thumbnail|center|AMG Verification Form]] |
+ | |||
+ | |||
+ | {{top}} | ||
+ | |||
+ | ==[[#MEASUREMENT AND PAYMENT|MEASUREMENT AND PAYMENT]]== | ||
+ | |||
+ | <span style="color: red"> -Reserved- </span> | ||
+ | |||
+ | {{top}} | ||
+ | |||
+ | [[Category:Construction Manual]] |
Revision as of 16:26, 20 June 2016
GENERAL
-Reserved-
MATERIALS
-Reserved-
CONSTRUCTION
Use of Automated Machine Guidance (AMG)
The following information will serve as guidance for the administration of projects that incorporate the Special Provision for Automated Machine Guidance (AMG). The documentation is specific for AMG projects and supplements information for the Engineer in the special provision for the administration of AMG work. These procedures apply to all federal and state funded projects that use the AMG process.
MEASUREMENT AND PAYMENT
-Reserved-