Difference between revisions of "824 - Contractor Staking"

From MDOT Wiki
Jump to: navigation, search
m
m (CONSTRUCTION: Added subheading "Use of Automated Machine Guidance (AMG)" along with content and attachments as a part of CMU 2016-001)
 
(2 intermediate revisions by one user not shown)
Line 7: Line 7:
  
  
==GENERAL==
+
==[[#GENERAL|GENERAL]]==
  
 
<span style="color: red"> -Reserved- </span>
 
<span style="color: red"> -Reserved- </span>
  
 +
{{top}}
  
==MATERIALS==
+
==[[#MATERIALS|MATERIALS]]==
  
 
<span style="color: red"> -Reserved- </span>
 
<span style="color: red"> -Reserved- </span>
  
 +
{{top}}
  
==CONSTRUCTION==
+
==[[#CONSTRUCTION|CONSTRUCTION]]==
 +
{{top}}
  
<span style="color: red"> -Reserved- </span>
+
====[[#Use of Automated Machine Guidance (AMG)|Use of Automated Machine Guidance (AMG)]]====
 +
The following information will serve as guidance for the administration of projects that incorporate the Special Provision for Automated Machine Guidance (AMG).  The documentation is specific for AMG projects and supplements information for the Engineer in the special provision for the administration of AMG work.  These procedures apply to all federal and state funded projects that use the AMG process.
  
 +
[[File:CMU16-001 AMG Attachment Final.pdf|500px|thumbnail|center|Automated Machine Guidance]]
  
==MEASUREMENT AND PAYMENT==
+
[[File:CMU16-001 AMG Sample Work Plan Final.pdf|500px|thumbnail|center|AMG Sample Work Plan]]
 +
 
 +
[[File:CMU16-001 AMG Verification Form Final.pdf|500px|thumbnail|center|AMG Verification Form]]
 +
 
 +
 
 +
{{top}}
 +
 
 +
==[[#MEASUREMENT AND PAYMENT|MEASUREMENT AND PAYMENT]]==
  
 
<span style="color: red"> -Reserved- </span>
 
<span style="color: red"> -Reserved- </span>
 +
 +
{{top}}
 +
 +
[[Category:Construction Manual]]

Latest revision as of 16:26, 20 June 2016

824
Contractor Staking
2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION - SECTION 824


Contents

[edit] GENERAL

-Reserved-

[top of page]


[edit] MATERIALS

-Reserved-

[top of page]


[edit] CONSTRUCTION

[top of page]


[edit] Use of Automated Machine Guidance (AMG)

The following information will serve as guidance for the administration of projects that incorporate the Special Provision for Automated Machine Guidance (AMG). The documentation is specific for AMG projects and supplements information for the Engineer in the special provision for the administration of AMG work. These procedures apply to all federal and state funded projects that use the AMG process.

Automated Machine Guidance
AMG Sample Work Plan
AMG Verification Form


[top of page]


[edit] MEASUREMENT AND PAYMENT

-Reserved-

[top of page]


Personal tools
Namespaces

Variants
Actions
Navigation
Division 2 - Earthwork
Division 3 - Base Courses
Division 4 - Drainage Features
Division 5 - HMA Pavements and Surface Treatments
Division 6 - PCC Pavement Mixtures
Division 7 - Structures
Division 8 - Incidental Construction
Toolbox