Construction Field Services Indirect Testing Charges

From MediaWiki
Revision as of 16:28, 29 October 2019 by SchaeferS (talk | contribs) (→‎Eligibility and Use: added verbiage per Jason Gutting)
Jump to navigation Jump to search
Email this Page

Construction Field Services Indirect Testing Charges

Materials testing and investigation is an essential component to the overall operations of MDOT. There are a number of reasons for materials testing, including verification and qualification of material products, inspections of labs and facilities for testing and acceptance of products, and field testing to ensure compliance with standard material specifications. The indirect testing template program detail reads:

The budget for the state funded required programs states the following:

Construction Field Services Indirect Testing Charges
This program number provides funding for the Construction Field Services Indirect Testing Program for testing performed in materials labs throughout the state that are not project specific, such as certification and verification of materials used in MDOT projects, stockpile testing, and non-project specific testing functions that are required to maintain the integrity of the materials used in trunkline maintenance and construction.

The purpose of the Construction Field Services indirect testing budget is to cover performance, material, and acquisition expenditures that relate to a category of projects, capital program administrative testing, and/or to perform testing related work for an un-programmed project wherein the activity is not scoping in nature. This coding is not to be used for activities related to local agency projects. Coding of local activities is described in the Charging Time to Local Agency Projects section.


  • Bulleted list item

Eligibility and Use

The following are examples of types of expenditures that would be appropriate to code to the Construction Field Services indirect testing coding. Please note this is not an all-inclusive list.

  • Prequalification of material vendors (Approved Manufacturers, Aggregate Producers, etc.) (salary and travel).
  • Certification/verification of samples taken at a vendor’s lab/facility (salary and travel).
  • Certification/verification of samples taken in the field if a project number is not available (salary and travel).
  • Construction season closing process, including preparation of forms, documentation, manual updates, etc. (salary and travel).
  • Lab preparation for a future construction season (salary).
  • Lab supplies and materials required for testing (other operating expense).
  • Lab equipment required for testing (other operating expense).
  • Lab supplies and materials required for research (other operating expense).
  • Calibration related expenses for testing and research equipment (salary, travel, and other operating expenses).
  • Vehicle and equipment usage (other operating expenses).
  • Lab qualification activities, such as proficiency testing.
  • Lab accreditation activities.
  • Sample collections and transport.

Inappropriate Use

It is not appropriate to use the Construction Field Services indirect testing coding to substitute or supplement administrative costs, as a substitute for small increments of activity that occurred on multiple programmed projects, or avoidance of multiple lines of coding. The following are examples of administrative costs (overhead 79900) and direct project costs that are not appropriate to code to the indirect testing project number.

Salary:

  • Leave (annual, sick, other)
  • Training
  • Project Scoping eligible activities
  • Project specific activities
  • Administrative or project activities that are not directly related to materials and testing processes, as previously identified


Travel:

  • Training
  • Project Scoping eligible activities
  • Project specific activities
  • Administrative or project activities that are not directly related to materials and testing processes, as previously identified


Other:

  • Telephone (Mobile or Desk) and Telegraph
  • Utilities
  • Rentals and Leases (Land and Building, Office Equipment)
  • Consultant Fees and Compensation (Except those directly related to materials and testing.)
  • Subscriptions
  • Membership Dues
  • Postage and UPS
  • Fuel (Vehicle, Equipment, Facility Heating)
  • Computer Equipment
  • Office Supplies
  • Conferences, Seminars, Training (Internal/External)
  • Lease Payments


Per the guidance provided above, staff are to use the following coding for construction field services indirect testing in conjunction with their LDPR coding::

Development/PE
Unit: Use Employee Standard Unit
Activity: 6140
Program: 209251PE
Phase: 14
Location: X000 (three "zeros")


Construction/CE
Unit: Use Employee Standard Unit
Activity: 6310
Program: 209251CON
Phase: 02
Location: X000 (three "zeros")