Difference between revisions of "Dev Page"

From MediaWiki
Jump to navigation Jump to search
(Replaced content with "This page is for testing purposes")
Line 1: Line 1:
[http://www.michigan.gov/mdot www.michigan.gov/mdot]
+
This page is for testing purposes
 
 
 
 
<center><span STYLE="font: 40pt arial;">'''CONSTRUCTION MANUAL'''</span></center>
 
 
 
 
 
<center>[[File:logo.jpg|400px]]</center>
 
 
 
 
 
 
 
<center><span STYLE="font: 30pt arial;">'''Bureau of Field Services'''</span></center>
 
 
 
<center><span STYLE="font: 15pt arial;">'''Construction Field Services Division '''</span></center>
 
 
 
<span style="float: right;">
 
<center><span style="float: right;">[[File:DI-06414-080.jpg|550px|thumb|right|Pouring concrete on the I-75 Rouge River project.]]</span></center>
 
</span>
 
 
 
 
 
=[[#MDOT Mission Statement|MDOT Mission Statement]]=
 
Providing the highest quality integrated transportation services for economic benefit and improved quality of life.
 
 
 
 
 
=[[Current News|<font color="red">Current News</font>]]=
 
<gallery type="slideshow">
 
File:DI-06414-080.jpg
 
File:DI-06384-020.jpg
 
File:DI-06215-039.jpg
 
</gallery>
 
 
 
==[[#Wiki Navigation Videos|Wiki Navigation Videos <font color="red"> '''- NEW !!'''</font>]]==
 
For helpful tips on how to utilize the features that exist within MDOT's Construction Manual Wiki, check out the video resources that are now available. Click on the thumbnail below to go to the Construction Manual Wiki Tips video library.
 
 
 
[[File:Wiki Intro Click Here.png|border|center|300px|link=http://mdotwiki.state.mi.us/construction/index.php/Construction_Manual_Wiki_Tips]]
 
 
 
==[[#Sign Up for UPDATES|Sign Up for Updates <font color="red"> '''- NEW !!'''</font>]]==
 
To learn about how to sign up to receive updates related to MDOT's Construction Manaul Wiki along with other State of Michigan content check out the video provided below.
 
 
 
<div style="float: center; padding-left: 1px; padding-right: 1px;">{{#ev:youtube|y1g5KLud_uc|300|center|Click here to learn how to sign up for MDOT notifications}}</div>
 
 
 
[[File:ListServ Red Envelope2.PNG|300px|link=https://public.govdelivery.com/accounts/MIDOT/subscriber/new]]
 
 
 
 
 
{{top}}
 
 
 
==[[#Recent Major Changes|Recent Major Changes]]==
 
The table below is a list of Major changes. 
 
<div style="overflow:auto; height:200px; width:700px">
 
{| class="wikitable" style="background:orange; color:black"
 
|-
 
!Updated!! Division !! Section !! Summary !! What Changed
 
|-
 
|<center>6/4/2018</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102]]</center>||Provided New Table for "Typical Long Lead Time Items" along with updating to the latest "Boilerplate Progress Clause Template 5-30-15"||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5353&oldid=5201 Compare It]
 
|-
 
|<center>4/26/2018</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment|109]]</center>||Update to Purpose of Review.||[http://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection,_Acceptance,_and_Final_Payment&diff=5280&oldid=4987 Compare It]
 
|-
 
|<center>1/19/2018</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208]]</center>||Addition of Notice of termination section.||[http://mdotwiki.state.mi.us/construction/index.php/208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Submittal_of_Notice_of_Termination view here]
 
|-
 
|<center>1/17/2018</center>||<center>7</center>||<center>[[708_-_Prestressed_Concrete|708]]</center>||Overhaul of information for section 708||[http://mdotwiki.state.mi.us/construction/index.php?title=708_-_Prestressed_Concrete&diff=5238&oldid=5233 compare]
 
|-
 
|<center>1/16/2018</center>||<center>7</center>||<center>[[707_-_Structural_Steel|707]]||Overhaul of information for section 707||[http://mdotwiki.state.mi.us/construction/index.php?title=707_-_Structural_Steel&diff=5230&oldid=5186 compare]
 
|-
 
|12/19/2017</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs#Engineer_Certification_Program| Engineer Certification]]</center>||Updated Engineer Certification List||[//{{SERVERNAME}}/images_construction/a/ac/Eng_Record_Cert_list_12-19-17.pdf Linked Here]
 
|-
 
|<center>12/12/2017</center>||<center>1 Supplemental</center>||<center>[[Plans,_Proposal,_Input,_Review_and_Evaluation|Plans, Proposal, Imput, Review and Evaluation]]</center>||Update about Post Construction Information||[http://mdotwiki.state.mi.us/construction/index.php/Other#Post-Construction_Reviews View Here]
 
|-
 
|<center>12/7/2017</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal|102.02]]</center>||Updated Boilerplate Progress Clause Template||[http://mdotwiki.state.mi.us/construction/index.php/File:Boilerplate_Progress_Clause_Template_12-6-17.docx View Here]
 
|-
 
|<center>11/27/2017</center>||<center>Main Page</center>||<center>Main Page</center>||New Preamble for Construction Manual||
 
|-
 
|<center>11/27/2017</center>||<center>1 Supplemental</center>||<center>[[e-Construction#Standard_Naming_Convention_for_Documents|Standard Naming Convention]]</center>||New format for Standard Naming Convention||
 
|-
 
|<center>11/3/2017</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Testing Charges]]</center>||Updated LDPR coding||[http://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use View here]
 
|-
 
|<center>11/2/2017</center>||<center>1 Supplemental</center>||<center>[[E-Construction|E-Construction]]</center>||Updated table for file naming||[http://mdotwiki.state.mi.us/construction/index.php/E-Construction#e-Construction.2FPaper_File_System View table here]
 
|-
 
|<center>11/1/2017</center>||<center>1 Supplemental</center>||<center>[[Local_Agency|Local Agency]]</center>||Updated coding information for SIGMA||[http://mdotwiki.state.mi.us/construction/index.php/Local_Agency#CHARGING_TIME_TO_LOCAL_AGENCY_PROJECTS View Here]
 
|-
 
|<center>10/26/2017</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings|811]]</center>||Added new section for Special Markings for Cold Weather||[http://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#Temporary_Special_Markings_for_Cold_Weather View Here]
 
|-
 
|<center>10/19/2017</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings|811]]</center>||Updated Paint pricing for 2017||[http://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#UNIFORM_PRICE_ADJUSTMENT.2C_REGULAR_DRY_PAINT_AND_LOW_TEMPERATURE_WATERBORNE_PAINT View Updated Table Here]
 
|-
 
|<center>9/21/2017</center>||<center>1</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual|Materials Quality Assurance Procedures Manual]]</center>||2017 Summary of Revision to the manual||
 
|-
 
|<center>9/14/2017</center>||<center>1 Supplemental</center>||<center>[[Local_Agency#Project_Administration:_MDOT_Oversight_Folder|Local Agency]]</center>||Guidance on new folder in ProjectWise||
 
|-
 
|<center>9/6/2017</center>||<center>1</center>||<center>[[LCPtracker_Supplemental_Information|LCPtracker Tracker]]</center>||New Page specifically for LCPtracker||
 
|-
 
|<center>8/24/2017</center>||<center>1</center>||<center>[[102.14_Construction_Progress_Schedule|102.14]]</center>||Moved progress form 1130 to new section 102.14||
 
|-
 
|<center>7/11/2017</center>||<center>1</center>||<center>[[108.01_Subcontracting_of_Contract_Work#Construction_Subcontract_Process|108.1]]</center>||Changed email for 1302A Forms||[mailto:MDOT-ConstructionSubcontracts@michigan.gov New email address here]
 
|-
 
|<center>6/20/2017</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Construction Field Services Indirect Testing Charges]]</center>||New coding content||[http://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use View Coding Guidelines here]
 
|-
 
|<center>6/16/2016</center>||<center>1 Supplemental</center>||<center>[[FieldManager|FieldManager]]</center>||Addition of CMU 2017-003, Electronic Read only Files||[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=4895&oldid=4836 View Here]
 
|-
 
|<center>4/25/2017</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal#Progress_Clause| 102.02]]</center>||Update according to CA 2015-11 with Boiler progress update.||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal&diff=4631&oldid=4454 Compare It]
 
|-
 
|<center>4/21/2017</center>||<center>1</center>||<center>[[Contract_Administration_and_Oversight_Guidelines_for_Projects_Containing_Warranty_Work|Contract Admin]]</center>||Added content according to CA 2015-13||[http://mdotwiki.state.mi.us/construction/index.php?title=Contract_Administration_and_Oversight_Guidelines_for_Projects_Containing_Warranty_Work&diff=4616&oldid=4544 Compare It]
 
|-
 
|<center>4/19/2017</center>||<center>2</center>||<center>[[205_-_Roadway_Earthwork#Cost_Over_Runs_From_Off_Site_Disposal_of_Soil|205]]</center>||Added content in accordance with CA 2008-01||[http://mdotwiki.state.mi.us/construction/index.php?title=205_-_Roadway_Earthwork&diff=4609&oldid=4268 Compare It]
 
|-
 
|<center>4/19/2017</center>||<center>1</center>||<center>[[104.07_Contractor_Obligations#Project_.26_Worksite_Safety|104.07]]</center>||Added Content according to CA 2013-12, Workers Safety||[http://mdotwiki.state.mi.us/construction/index.php?title=104.07_Contractor_Obligations&diff=4605&oldid=4570 Compare It]
 
|-
 
|<center>4/19/2017</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions#Force Account Work|109.05]]</center>||Made adjustments to implement form 1101-SP109||[http://mdotwiki.state.mi.us/construction/index.php?title=109.05_Payment_for_Contract_Revisions&diff=4603&oldid=4588 Compare It]
 
|-
 
|<center>4/5/2017</center>||<center>1</center>||<center>[[Prevailing_Wage_Oversight_Procedures#Prevailing_Wage_Classifications|Prevailing Wage]]</center>||Added Section for Prevailing Wage Classification from CA 2007-15||[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures#Prevailing_Wage_Classifications View Here]
 
|}
 
</div>
 
A definition to the types of changes that you might see in the Construction Manual can be found under [[Content_Revision_Procedures#Types_of_Changes|Content Revision Procedures, Types of Changes]].
 
 
 
{{top}}
 
 
 
==[[#Recent Minor Changes|Recent Minor Changes]]==
 
The table below is a list of Minor changes. 
 
<div style="overflow:auto; height:200px; width:700px">
 
{| class="wikitable" style="background:yellow; color:black"
 
|-
 
!Updated!! Division !! Section !! Summary !! What Changed
 
|-
 
|<center>2/20/2018</center>||<center>1</center>||<center>[[Prevailing_Wage_Oversight_Procedures|Prevailing Wage Oversight]]</center>||Updated Title VI Poster||[http://mdotwiki.state.mi.us/construction/index.php/File:MDOT_TitleVI_englishposter.pdf View Here]
 
|-
 
|<center>2/12/2018</center>||<center>1</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension|104.10]]</center>||Changed contact info to Mike Deboer and added direction to Claims Database in ProjectWise||[http://mdotwiki.state.mi.us/construction/index.php?title=104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension&diff=5251&oldid=4922 compare here]
 
|-
 
|<center>2/6/2018</center>||<center>5</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt|501]]</center>||Changed roller speed calculation from 23.36 mph to 2.36 mph||[https://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt#Roller_Speed section here]
 
|-
 
|<center>1/16/2018</center>||<center>1</center>||<center>[[108.05_Progress_of_the_Work|108.05]]</center>||Moved content from 102.14 to 108.05||
 
|-
 
|<center>1/10/2018</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause|12.02]]</center>||Renamed page and moved structures progress clause to this section||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5189&oldid=5182 View Comparison]
 
|-
 
|<center>1/4/2018</center>||<center>1 supplemental</center>||||Separated "other" page into separate pages||
 
|-
 
|<center>12/20/2017</center>||<center>1</center>||<center>[[102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_(DBEs)#DBE_Performance_Indicators|102.18]]</center>||Updated content related to Commercially Useful Function (CUF). Part of CMU 2017-005||[http://mdotwiki.state.mi.us/construction/index.php?title=102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_(DBEs)&diff=5162&oldid=4910 Compare It]
 
|-
 
|<center>12/4/2017</center>||<center>1 Supplemental</center>||<center>[[Dispute_Review_Board_(DRB)|Dispute Review Board]]</center>||Update to page and ProjectWise directions||
 
|-
 
|<center>11/28/2017</center>||<center>1 Supplemental</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Updated examples for Calc forms||
 
|-
 
|<center>11/2/2016</center>||<center>1</center>||<center>NA</center>||Removed 'Disincentive' from manual language||
 
|-
 
|<center>10/26/2017</center>||<center>1</center>||<center>[[103.02_Contract_Revisions|103.02]]</center>||Moved ''Contract Modification Process Overview'' page to ''103.02 Contract Revisions||[http://mdotwiki.state.mi.us/construction/index.php/103.02_Contract_Revisions View Here]
 
|-
 
|<center>10/25/2017</center>||<center>7 Supplemental</center>||<center>[[Division 7 Supplemental Information#Division_7_Supplemental_Information|Division 7 Supplemental Information]]</center>||Updated notification contact information for bridge deck pours and concrete deck overlays||[https://mdotwiki.state.mi.us/construction/index.php?title=Division_7_Supplemental_Information&diff=5064&oldid=4970 View Update]
 
|-
 
|<center>10/23/2017</center>||<center>1</center>||<center>NA</center>||Changed language from "Approved for Traffic" to "Open to traffic"||
 
|-
 
|<center>10/11/2017</center>||<center>8</center>||<center>[[803_-_Concrete_Sidewalk,_Ramps,_and_Steps#MEASUREMENT_AND_PAYMENT|803]]</center>||Added illustration of sidewalk measurement and payment||[//{{SERVERNAME}}/images_construction/7/72/Road_Design_Manual_Chapter_6_-_ADA_Ramp_payment_items.pdf See Here]
 
|-
 
|<center>9/26/2017</center>||<center>1</center>||<center>[[Prevailing_Wage_Oversight_Procedures|Prevailing Wage Oversight Procedures]]</center>||Updated Posters to add USERRA Poster||[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures#JOBSITE_POSTING View Here]
 
|-
 
|<center>4/24/2017</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Pay_Item_Selection|109.07]]</center>||Updated according CA 2015-06||[http://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&diff=4622&oldid=4591 Compare It]
 
|-
 
|<center>4/24/2017</center>||<center>1</center>||<center>[[Disadvantaged_Business_Enterprises_(DBE)#Disadvantages_Business_Enterprises_.28DBE.29|Disadvantaged Business]]</center>||Updated content according CA 2014-13||[http://mdotwiki.state.mi.us/construction/index.php?title=Disadvantaged_Business_Enterprises_%28DBE%29&diff=4620&oldid=4571 Compare It]
 
|-
 
|<center>4/21/2017</center>||<center>1 Supplemental</center>||<center>[[Local_Agency#PROJECT_ADMINISTRATION_MDOT-LET_LOCAL_AGENCY_PROJECTS|Local Agency]]</center>||Updated content according to CA 2009-16||[http://mdotwiki.state.mi.us/construction/index.php?title=Local_Agency&diff=4618&oldid=4574 Compare It]
 
|-
 
|<center>4/20/2017</center>||<center>5</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt|501]]</center>||Updated content from CA 2006-07||[http://mdotwiki.state.mi.us/construction/index.php?title=501_-_Plant_Produced_Hot_Mix_Asphalt&diff=4614&oldid=4250 Compare It]
 
|-
 
|<center>4/20/2017</center>||<center>5</center>||<center>[[502_-_HMA_Crack_Treatment#GENERAL|502]]</center>||Added update from CA 2009-03 to CM||[http://mdotwiki.state.mi.us/construction/index.php?title=502_-_HMA_Crack_Treatment&diff=4611&oldid=3361 Compare It]
 
|-
 
|<center>4/19/2017</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs#Review_Procedure|Cert Programs]]</center>||Added text from CA 2014-03||[http://mdotwiki.state.mi.us/construction/index.php?title=Certification_Programs&diff=4607&oldid=4311 Compare It]
 
|-
 
|<center>4/5/2017</center>||<center>6</center>||<center>[[603_-_Concrete_Pavement_Restoration#Removing Old Concrete|603]]</center>||Added text update from CA 2013-09||[http://mdotwiki.state.mi.us/construction/index.php?title=603_-_Concrete_Pavement_Restoration&diff=4429&oldid=4017 Compare It]
 
|-
 
|<center>3/28/2017</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Marked_Plans|109.07]]</center>||Added links from CA 2009-20||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Marked_Plans View Here]
 
|-
 
|<center>3/27/2017</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions#DOCUMENTING_PRICE_NEGOTIATIONS|109.05]]</center>||Updated reference to CFR and included link||[http://mdotwiki.state.mi.us/construction/index.php/109.05_Payment_for_Contract_Revisions#DOCUMENTING_PRICE_NEGOTIATIONS View Here]
 
|}
 
</div>
 
 
 
{{top}}
 
 
 
=[[#Preamble|Preamble]]=
 
 
 
This manual provides guidance to administrative, engineering, and technical staff.  Engineering practice requires that professionals use a combination of technical skills and judgment in decision making.  Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare.  This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary.  Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials.  As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public.  It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed.  It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise.  MDOT Leadership is committed to a culture of innovation to optimize engineering solutions.
 
The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons.  Those canons are provided below.
 
Engineers, in the fulfillment of their professional duties, shall:
 
::#Hold paramount the safety, health, and welfare of the public.
 
::#Perform Services only in areas of their competence.
 
::#Issue public statement only in an objective and truthful manner.
 
::#Act for each employer or client as faithful agents or trustees.
 
::#Avoid deceptive acts.
 
::#Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession.
 
 
 
 
 
This manual has been revised throughout to incorporate changes brought about by the release of the 2012 Standard Specifications for Construction and by progress in equipment, construction practices, and materials. The format has been established to follow the standard specification outline with divisions and sections set up to facilitate revision and addition of new information as needed.
 
 
 
 
 
Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the [[Help:Contents]] page.
 
 
 
 
 
{{top}}
 
[[Category:Construction Manual]]
 

Revision as of 16:28, 6 June 2018

This page is for testing purposes