Difference between revisions of "Dispute Review Board (DRB)"

From MediaWiki
Jump to navigation Jump to search
Line 12: Line 12:
  
 
[http://www.michigan.gov/documents/mdot/MDOT_DRB_Procedures_After090415_494187_7.pdf Dispute Review Board (DRB) Operating Procedures (effective for projects let on September 4, 2015, through and including March 3, 2016]
 
[http://www.michigan.gov/documents/mdot/MDOT_DRB_Procedures_After090415_494187_7.pdf Dispute Review Board (DRB) Operating Procedures (effective for projects let on September 4, 2015, through and including March 3, 2016]
 
[http://www.michigan.gov/documents/mdot/MDOT_DRB_Procedures_399279_7.pdf Dispute Review Board (DRB) Operating Procedures (effective for all projects let before September 4, 2015)]
 
  
 
{{top}}
 
{{top}}

Revision as of 08:01, 28 September 2017

Email this Page

Dispute Review Board (DRB) Procedures

This DRB Procedured describes the Michigan Department of Transportation (MDOT) procedures for submittal and review of Contractor claims and Contractor performance evaluation appeals using a Dispute Review Board (DRB). The Dispute Review Board (DRB) process is used on projects that have incorporated the Special Provision for Dispute Review Board. The DRB process is used on Contractor claims and Contractor performance evaluation appeals as described within.

The most current DRB Procedures are published on the website and linked below:

Dispute Review Board (DRB) Operating Procedures (effective for all projects let on and after October 6, 2017)

NOTE: For projects let before October 6, 2017 please reference the applicable DRB procedures linked below.

Dispute Review Board (DRB) Operating Procedures (effective for all projects let on and March 4, 2016 through and including September 6, 2017).

Dispute Review Board (DRB) Operating Procedures (effective for projects let on September 4, 2015, through and including March 3, 2016

[top of page]


Dispute Review Board Process Flowchart

DRB Process Flowchart
Email this Page