Difference between revisions of "Frequently Searched Items"

From MDOT Wiki
Jump to: navigation, search
(Common searches with links 5/1/2016)
 
m (wording change)
Line 1: Line 1:
:[https://mdotwiki.state.mi.us/construction/index.php/Construction_Contract_Modification_Process_Overview Contract Modification] and FHWA limits BOH IM
+
:[https://mdotwiki.state.mi.us/construction/index.php/Construction_Contract_Modification_Process_Overview Contract Modification] and FHWA limits (formerly FHWA BOHIM)
 
:[http://mdotjboss.state.mi.us/webforms/WebFormsHome.htm Mdot forms search]
 
:[http://mdotjboss.state.mi.us/webforms/WebFormsHome.htm Mdot forms search]
 
:[http://www.michigan.gov/mdot/0,4616,7-151-9625_21539_21546---,00.html Average unit prices]
 
:[http://www.michigan.gov/mdot/0,4616,7-151-9625_21539_21546---,00.html Average unit prices]
Line 11: Line 11:
 
:[http://www.michigan.gov/mdot/0,4616,7-151-9622_11044_11367_68095---,00.html Material source guide]
 
:[http://www.michigan.gov/mdot/0,4616,7-151-9622_11044_11367_68095---,00.html Material source guide]
 
:[http://mdotjboss.state.mi.us/webforms/NewRevisedConstrForms.htm Check for latest MDOT Form updates]
 
:[http://mdotjboss.state.mi.us/webforms/NewRevisedConstrForms.htm Check for latest MDOT Form updates]
:[http://mdotwiki.state.mi.us/construction/index.php/105.10_Source_of_Steel_and_Iron Buy America BOH IM]  
+
:[http://mdotwiki.state.mi.us/construction/index.php/105.10_Source_of_Steel_and_Iron Formerly Buy America BOHIM]  
:[http://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt HMA Inspector’s Daily report requirements - CA (2006-07)]
+
:[http://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt HMA Inspector’s Daily report requirements - (Formerly CA (2006-07))]
 
:[http://www.michigan.gov/documents/mdot/MDOT_DocumentationGuide_328761_7.pdf Material Documentation Guide]
 
:[http://www.michigan.gov/documents/mdot/MDOT_DocumentationGuide_328761_7.pdf Material Documentation Guide]
 
:[https://mdotwiki.state.mi.us/construction/index.php/102.01_Prequalification_of_Bidders Contractor Performance Evaluations procedures (MDOT Wiki)]
 
:[https://mdotwiki.state.mi.us/construction/index.php/102.01_Prequalification_of_Bidders Contractor Performance Evaluations procedures (MDOT Wiki)]
 
:[https://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures Prevailing Wage]
 
:[https://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures Prevailing Wage]

Revision as of 16:56, 4 May 2017

Contract Modification and FHWA limits (formerly FHWA BOHIM)
Mdot forms search
Average unit prices
Construction Contractor Inquiries for letting dates, item numbers, status
Frequently used special provisions
MDOT Standard plans
MMUTCD chapter 6
Traffic Sign Details
E proposal to find plans, proposals for jobs that are let
Bid tabs from lettings
Material source guide
Check for latest MDOT Form updates
Formerly Buy America BOHIM
HMA Inspector’s Daily report requirements - (Formerly CA (2006-07))
Material Documentation Guide
Contractor Performance Evaluations procedures (MDOT Wiki)
Prevailing Wage
Personal tools
Namespaces

Variants
Actions
Navigation
Division 2 - Earthwork
Division 3 - Base Courses
Division 4 - Drainage Features
Division 5 - HMA Pavements and Surface Treatments
Division 6 - PCC Pavement Mixtures
Division 7 - Structures
Division 8 - Incidental Construction
Toolbox