Difference between revisions of "Frequently Searched Items"

From MDOT Wiki
Jump to: navigation, search
m
m (Updated link for Minimum Documentation Guide)
 
(One intermediate revision by one user not shown)
Line 8: Line 8:
 
:[http://mdotcf.state.mi.us/public/tands/plans.cfm MMUTCD chapter 6]  
 
:[http://mdotcf.state.mi.us/public/tands/plans.cfm MMUTCD chapter 6]  
 
:[http://www.michigan.gov/mdot/0,4616,7-151-12965_14036---F,00.html Traffic Sign Details]
 
:[http://www.michigan.gov/mdot/0,4616,7-151-12965_14036---F,00.html Traffic Sign Details]
:[http://mdotjboss.state.mi.us/BidLetting/getLettingInfo.htm?directoryName=2017-05-10&index=0 E proposal to find plans, proposals for jobs that are let]
+
:[https://mdotjboss.state.mi.us/BidLetting/BidLettingHome.htm E proposal to find plans, proposals for jobs that are let]
 
:[http://mdotjboss.state.mi.us/BidLetting/BidLettingHome.htm Bid tabs from lettings]  
 
:[http://mdotjboss.state.mi.us/BidLetting/BidLettingHome.htm Bid tabs from lettings]  
 
:[http://www.michigan.gov/mdot/0,4616,7-151-9622_11044_11367_68095---,00.html Material source guide]
 
:[http://www.michigan.gov/mdot/0,4616,7-151-9622_11044_11367_68095---,00.html Material source guide]
Line 14: Line 14:
 
:[http://mdotwiki.state.mi.us/construction/index.php/105.10_Source_of_Steel_and_Iron Formerly Buy America BOHIM]  
 
:[http://mdotwiki.state.mi.us/construction/index.php/105.10_Source_of_Steel_and_Iron Formerly Buy America BOHIM]  
 
:[http://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt HMA Inspector’s Daily report requirements - (Formerly CA (2006-07))]
 
:[http://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt HMA Inspector’s Daily report requirements - (Formerly CA (2006-07))]
:[http://www.michigan.gov/documents/mdot/MDOT_DocumentationGuide_328761_7.pdf Material Documentation Guide]
+
:[http://mdotwiki.state.mi.us/construction/images/0/0d/Documentation_Guide_Final_Draft_02-25-19.pdf Documentation Guide]
 
:[http://mdotwiki.state.mi.us/construction/index.php/102.01_Prequalification_of_Bidders Contractor Performance Evaluations procedures (MDOT Wiki)]
 
:[http://mdotwiki.state.mi.us/construction/index.php/102.01_Prequalification_of_Bidders Contractor Performance Evaluations procedures (MDOT Wiki)]
 
:[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures Prevailing Wage]
 
:[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures Prevailing Wage]
 
:[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates Final Estimates]
 
:[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates Final Estimates]

Latest revision as of 17:06, 6 March 2019

Contract Modification and FHWA limits (formerly FHWA BOHIM)
Mdot forms search
MDOT Average unit prices
MDOT Design Estimating Average Unit Price
Construction Contractor Inquiries for letting dates, item numbers, status
Frequently used special provisions
MDOT Standard plans
MMUTCD chapter 6
Traffic Sign Details
E proposal to find plans, proposals for jobs that are let
Bid tabs from lettings
Material source guide
Check for latest MDOT Form updates
Formerly Buy America BOHIM
HMA Inspector’s Daily report requirements - (Formerly CA (2006-07))
Documentation Guide
Contractor Performance Evaluations procedures (MDOT Wiki)
Prevailing Wage
Final Estimates
Personal tools
Namespaces

Variants
Actions
Navigation
Division 2 - Earthwork
Division 3 - Base Courses
Division 4 - Drainage Features
Division 5 - HMA Pavements and Surface Treatments
Division 6 - PCC Pavement Mixtures
Division 7 - Structures
Division 8 - Incidental Construction
Toolbox