Difference between revisions of "Frequently Searched Items"

From MDOT Wiki
Jump to: navigation, search
m (Updated link for Minimum Documentation Guide)
m (Added Link for Final Project Review Procedures)
 
Line 18: Line 18:
 
:[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures Prevailing Wage]
 
:[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures Prevailing Wage]
 
:[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates Final Estimates]
 
:[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates Final Estimates]
 +
:[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#e-Final_Project_Review_Procedures Final Project Review Procedures]

Latest revision as of 17:31, 19 December 2019

Contract Modification and FHWA limits (formerly FHWA BOHIM)
Mdot forms search
MDOT Average unit prices
MDOT Design Estimating Average Unit Price
Construction Contractor Inquiries for letting dates, item numbers, status
Frequently used special provisions
MDOT Standard plans
MMUTCD chapter 6
Traffic Sign Details
E proposal to find plans, proposals for jobs that are let
Bid tabs from lettings
Material source guide
Check for latest MDOT Form updates
Formerly Buy America BOHIM
HMA Inspector’s Daily report requirements - (Formerly CA (2006-07))
Documentation Guide
Contractor Performance Evaluations procedures (MDOT Wiki)
Prevailing Wage
Final Estimates
Final Project Review Procedures
Personal tools
Namespaces

Variants
Actions
Navigation
Division 2 - Earthwork
Division 3 - Base Courses
Division 4 - Drainage Features
Division 5 - HMA Pavements and Surface Treatments
Division 6 - PCC Pavement Mixtures
Division 7 - Structures
Division 8 - Incidental Construction
Toolbox