Difference between revisions of "Frequently Searched Items"
Jump to navigation
Jump to search
JohnsonN23 (talk | contribs) m |
m (Updated link for Minimum Documentation Guide) |
||
Line 14: | Line 14: | ||
:[http://mdotwiki.state.mi.us/construction/index.php/105.10_Source_of_Steel_and_Iron Formerly Buy America BOHIM] | :[http://mdotwiki.state.mi.us/construction/index.php/105.10_Source_of_Steel_and_Iron Formerly Buy America BOHIM] | ||
:[http://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt HMA Inspector’s Daily report requirements - (Formerly CA (2006-07))] | :[http://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt HMA Inspector’s Daily report requirements - (Formerly CA (2006-07))] | ||
− | :[ | + | :[//{{SERVERNAME}}/images_construction/0/0d/Documentation_Guide_Final_Draft_02-25-19.pdf Documentation Guide] |
:[http://mdotwiki.state.mi.us/construction/index.php/102.01_Prequalification_of_Bidders Contractor Performance Evaluations procedures (MDOT Wiki)] | :[http://mdotwiki.state.mi.us/construction/index.php/102.01_Prequalification_of_Bidders Contractor Performance Evaluations procedures (MDOT Wiki)] | ||
:[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures Prevailing Wage] | :[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures Prevailing Wage] | ||
:[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates Final Estimates] | :[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates Final Estimates] |
Revision as of 12:06, 6 March 2019
- Contract Modification and FHWA limits (formerly FHWA BOHIM)
- Mdot forms search
- MDOT Average unit prices
- MDOT Design Estimating Average Unit Price
- Construction Contractor Inquiries for letting dates, item numbers, status
- Frequently used special provisions
- MDOT Standard plans
- MMUTCD chapter 6
- Traffic Sign Details
- E proposal to find plans, proposals for jobs that are let
- Bid tabs from lettings
- Material source guide
- Check for latest MDOT Form updates
- Formerly Buy America BOHIM
- HMA Inspector’s Daily report requirements - (Formerly CA (2006-07))
- Documentation Guide
- Contractor Performance Evaluations procedures (MDOT Wiki)
- Prevailing Wage
- Final Estimates