Frequently Searched Items
Revision as of 10:09, 3 July 2017 by JohnsonN23 (talk | contribs)
- Contract Modification and FHWA limits (formerly FHWA BOHIM)
- Mdot forms search
- MDOT Average unit prices
- MDOT Design Estimating Average Unit Price
- Construction Contractor Inquiries for letting dates, item numbers, status
- Frequently used special provisions
- MDOT Standard plans
- MMUTCD chapter 6
- Traffic Sign Details
- E proposal to find plans, proposals for jobs that are let
- Bid tabs from lettings
- Material source guide
- Check for latest MDOT Form updates
- Formerly Buy America BOHIM
- HMA Inspector’s Daily report requirements - (Formerly CA (2006-07))
- Material Documentation Guide
- Contractor Performance Evaluations procedures (MDOT Wiki)
- Prevailing Wage
- Final Estimates