Difference between revisions of "Main Page"

From MediaWiki
Jump to navigation Jump to search
(→‎Recent Minor Changes: misread instructions - needed to delete highlights altogether)
(240 intermediate revisions by 7 users not shown)
Line 2: Line 2:
  
  
<center><span STYLE="font: 80pt arial;">'''CONSTRUCTION MANUAL'''</span></center>
+
<center><span STYLE="font: 25pt arial;">'''CONSTRUCTION MANUAL'''</span></center>
  
  
 +
<center>[[File:logo.jpg|250px]]</center>
  
  
  
 +
<center><span STYLE="font: 20pt arial;">'''Bureau of Field Services'''</span></center>
  
<center>[[File:logo.jpg|600px]]</center>
+
<center><span STYLE="font: 15pt arial;">''Construction Field Services Division''</span></center>
  
 +
<span style="float: right;">
 +
<center><span style="float: right;">[[File:DI-06801-092.jpg|450px|thumb|right|Box culvert construction on M-10 in Clare County.]]</span></center>
 +
</span>
  
 +
=[[#MDOT Mission Statement|MDOT Mission Statement]]=
 +
Providing the highest quality integrated transportation services for economic benefit and improved quality of life.
  
  
<center>'''Bureau of Field Services'''</center>
+
=[[Current News|<font color="red">Current News</font>]]=
  
<center>'''Construction Field Services Division '''</center>
+
==[[#Documentation Guide|Documentation Guide]]==
 +
The NEW Documentation Guide is now available to replace the former "Minimum Documentation Guide" content (Updated July 2019). A link to the new "Documentation Guide" has been established in the Side Bar to the left. It can also be accessed by clicking on the thumbnail below.
  
 +
[[File:Documentation Guide Final Draft 07-29-19.pdf|thumb|center|200px|link=//{{SERVERNAME}}/images_construction/6/6a/Documentation_Guide_Final_Draft_07-29-19.pdf]]
  
== Heading text ==
+
{{top}}
  
=== SubHeading ===
+
==[[#Recent Major Changes|Recent Major Changes]]==
 +
The table below is a list of Major changes. 
 +
<div style="overflow:auto; height:200px; width:700px">
 +
{| class="wikitable" style="background:orange; color:black"
 +
|-
 +
!Updated!! Division !! Section !! Summary !! What Changed
 +
|-
 +
|<center>9/26/2019</center>||<center>1</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual| 105]]</center>||2019 Summary of revisions to the Materials Quality Assurance Procedures Manual ||[http://mdotwiki.state.mi.us/construction/index.php?title=Materials_Quality_Assurance_Procedures_Manual&diff=5642&oldid=5497 Compare It]
 +
|-
 +
|<center>9/26/2019</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Field_Inspection_and_Processing_of_Progress_Payments|811]]</center>||Permanent Pavement Markings Field Inspection and Processing of Progress Payments: Updated new content ||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=5640&oldid=5632 Compare It]
 +
|-
 +
|<center>9/18/2019</center>||<center>6</center>||<center>[[602_-_Concrete_Pavement_Construction#Load_Transfer_Assemblies|602]]</center>||Load Transfer Assemblies: Updated new content and included Presentation for Load Transfer Assemblies Inspections||[http://mdotwiki.state.mi.us/construction/index.php?title=602_-_Concrete_Pavement_Construction&diff=5629&oldid=5556 Compare It]
 +
|-
 +
|<center>9/18/2018</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings|811]]</center>||Updated Paint pricing for 2019||[http://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#UNIFORM_PRICE_ADJUSTMENT.2C_REGULAR_DRY_PAINT_AND_LOW_TEMPERATURE_WATERBORNE_PAINT View Updated Table Here]
 +
|-
 +
|<center>8/30/2019</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||Update to Trunkline Boilerplate Preconstruction Meeting Minutes - 2019||[//{{SERVERNAME}}/images_construction/5/5e/TRUNKLINE_Boilerplate_Preconstruction_Meeting_Minutes_2019_Final.docx View Here]
 +
|-
 +
|<center>8/20/2019</center>||<center>1 Supplemental</center>||<center>[[FieldManager#Standard_Rounding_Convention_Guidance|FieldManager]]</center>||New guidance related to the Standard Rounding Convention ||[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=5615&oldid=5386 Compare It]
 +
|-
 +
|<center>7/31/2019</center>||<center>Main Page</center>||<center>Main Page</center>||July update to the Documentation Guide which includes corrections related to density requirements. It also includes updated language related to the [//{{SERVERNAME}}/images_construction/6/6a/Documentation_Guide_Final_Draft_07-29-19.pdf#page=3 "e-Final Project Review Procedures"]||[//{{SERVERNAME}}/images_construction/6/6a/Documentation_Guide_Final_Draft_07-29-19.pdf View Here]
 +
|-
 +
|<center>6/26/2019</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment|109]]</center>||Updated: Final Project Review Procedures to the new [[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#e-Final_Project_Review_Procedures|"e-Final Project Review Procedures"]]||[http://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&diff=5578&oldid=5538 Compare It]
 +
|-
 +
|<center>5/28/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause|102.02]]</center>||Updated to Boilerplate Progress Clause Template||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5567&oldid=5553 Compare It]
 +
|-
 +
|<center>4/9/2019</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Detailed_Contract_Modification_Information|103.02]]</center>||Updates and clarifications related to [[103.02_Contract_Revisions#Detailed_Contract_Modification_Information|Detailed Contract Modification Information]] area as well as the [[103.02_Contract_Revisions#Design_Issues.2FPremium_Costs|Design Issue/Premium Costs]] area related to Contract Revisions||[http://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&diff=5534&oldid=5521 Compare It]
 +
|-
 +
|<center>3/19/2019</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Local_Agency_Projects|103.02]]</center>||[https://www.michigan.gov/documents/mdot_federal_Guidelines_99105_7.pdf Provided link to current Local Agency Programs Section Federal Guidelines]||[http://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&diff=5521&oldid=5256 Compare It]
 +
|-
 +
|<center>3/19/2019</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||[http://mdotwiki.state.mi.us/construction/index.php/File:LOCAL_AGENCY_Boilerplate_Preconstruction_Meeting_Minutes_-_March_2019.docx Preconstruction Meeting Minutes Boilerplate - Local Agency]||[http://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting&diff=5519&oldid=5406 Compare It]
 +
|-
 +
|<center>3/6/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal#Construction_Time_Estimates_-_Production_Rates|102.02]]</center>||Removed old production rate information and replaced with [http://mdotwiki.state.mi.us/construction/index.php/File:MDOT_Production_Rates_.xlsx new .xlsx file containing updated production rate information]||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5510&oldid=5439 Compare It]
 +
|-
 +
|<center>2/28/2019</center>||<center>Main Page</center>||<center>Main Page</center>||New Documentation Guide is now available to replace former "Minimum Documentation Guide" content. Link to the "Documentation Guide" also established in Side Bar to the left. ||[//{{SERVERNAME}}/images_construction/0/0d/Documentation_Guide_Final_Draft_02-25-19.pdf View Here]
 +
|-
 +
|<center>1/10/2019</center>||<center>1</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension|104.10]]</center>||Updated Contractor Claims Procedure for 2019||[http://mdotwiki.state.mi.us/construction/index.php?title=File:MDOT_Construction_Contractor_Claims_Procedure_January_2019.pdf&page=1 View Here]
 +
|-
 +
|<center>12/12/2018</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal|102.02]]</center>||Updated Boilerplate Progress Clause Template||[http://mdotwiki.state.mi.us/construction/index.php/File:Boilerplate_Progress_Clause_Template_12-12-18.docx View Here]
 +
|-
 +
|<center>11/7/2018</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||Preconstruction Meeting Minutes Boilerplate - Trunkline||[http://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting&diff=5406&oldid=5265 Compare It]
 +
|-
 +
|<center>10/26/2018</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings|811]]</center>||Updated Paint pricing for 2018||[http://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#UNIFORM_PRICE_ADJUSTMENT.2C_REGULAR_DRY_PAINT_AND_LOW_TEMPERATURE_WATERBORNE_PAINT View Updated Table Here]
 +
|}
 +
</div>
 +
A definition to the types of changes that you might see in the Construction Manual can be found under [[Content_Revision_Procedures#Types_of_Changes|Content Revision Procedures, Types of Changes]].
  
 +
{{top}}
  
<center></center>
+
==[[#Recent Minor Changes|Recent Minor Changes]]==
 +
The table below is a list of Minor changes. 
 +
<div style="overflow:auto; height:200px; width:700px">
 +
{| class="wikitable" style="background:yellow; color:black"
 +
|-
 +
!Updated!! Division !! Section !! Summary !! What Changed
 +
|-
 +
|<center>10/3/2019</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Pavement_Marking_Turn_Arrows|811]]</center>||Removal of references to outdated paint marking turn arrows||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=5647&oldid=5640 Compare It]
 +
|-
 +
|<center>8/22/2019</center>||<center>1</center>||<center>[[107.09_Archeological_and_Historical_Findings|107.09]]</center>||Update related to the process for archeological findings||[http://mdotwiki.state.mi.us/construction/index.php?title=107.09_Archeological_and_Historical_Findings&diff=5618&oldid=4933 Compare It]
 +
|-
 +
|<center>7/11/2019</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208]]</center>||Added 2 flowcharts for Notice of Coverage (NOC) and Notice of Termination (NOT) in section 208 between “Notification” and “Training”. Also updated language to reflect recent name change of the "Michigan Department of Environmental Quality (MDEQ)" to the "Michigan Department of Environment, Great Lakes, and Energy (EGLE)"||[http://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&diff=5586&oldid=5241 Compare It]
 +
|-
 +
|<center>6/25/2019</center>||<center>1</center>||<center>[[107.19_Hauling_on_Local_Roads_and_Streets#Hauling_on_Local_Roads_and_Streets|107.19]]</center>||Removed Hauling Route Permit Guidance||[http://mdotwiki.state.mi.us/construction/index.php?title=107.19_Hauling_on_Local_Roads_and_Streets&diff=5577&oldid=4936 Compare It]
 +
|-
 +
|<center>6/20/2019</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|E-Construction]]</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|Standard Naming Convention for Documents]]</center>||Updated Naming Convention Table to reflect recent changes.||[http://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&diff=5574&oldid=5563 Compare It]
 +
|-
 +
|<center>6/17/2019</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs|Certification Programs]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/a/af/Eng_Record_Cert_list_06-17-19.pdf View Here]
 +
|-
 +
|<center>5/20/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Added Barrier Gates and Work Zone Speed Trailers to "Typical Long-Lead Items" table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5553&oldid=5539 Compare It]
 +
|-
 +
|<center>4/17/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Minor update to heading of Column 2 for Typical Long-Lead Items||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5539&oldid=5526 Compare It]
 +
|-
 +
|<center>4/1/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Added Delineator and 3# U-Channel Posts to Typical Long-Lead Items table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5526&oldid=5523 Compare It]
 +
|-
 +
|<center>3/14/2019</center>||<center>7</center>||<center>[[715_-_Cleaning_and_Coating_Existing_Structural_Steel#Health_and_Safety|715]]</center>||Updated content related to: Health and Safety, Respiratory Protection and Protective Equipment, Medical Surveillance, Exposure Monitoring, Hygiene Facilities, and Lead Awareness Training||[http://mdotwiki.state.mi.us/construction/index.php?title=715_-_Cleaning_and_Coating_Existing_Structural_Steel&diff=5516&oldid=5480 Compare It]
 +
|-
 +
|<center>3/13/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Added Strain Poles to Typical Long-Lead Items table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5514&oldid=5510 Compare It]
 +
|-
 +
|<center>1/22/2019</center>||<center>7</center>||<center>[[718_-_Drilled_Shafts|718]]</center>||Provided clarification relating to [[718_-_Drilled_Shafts#Tremie_Tube_Concrete_Placement|Tremie Tube Concrete Placement]] along with inspection of shaft after [[718_-_Drilled_Shafts#Placing_Steel_Reinforcement|Placing Steel Reinforcement]] cage||[http://mdotwiki.state.mi.us/construction/index.php?title=718_-_Drilled_Shafts&diff=5487&oldid=4248 Compare It]
 +
|-
 +
|<center>1/16/2019</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions#Small_Tools|109.05]]</center>||Clarification related to small tools for Force Account Work||[http://mdotwiki.state.mi.us/construction/index.php?title=109.05_Payment_for_Contract_Revisions&diff=5453&oldid=4945 Compare It]
 +
|-
 +
|<center>12/3/2018</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs|Certification Programs]]</center>||Updated Engineer Record Certification List||[http://mdotwiki.state.mi.us/construction/index.php/File:Eng_Record_Cert_list_12-03-18.pdf View Here]
 +
|}
 +
</div>
  
<center></center>
+
{{top}}
  
<center></center>
+
=[[#Preamble|Preamble]]=
  
<center></center>
+
This manual provides guidance to administrative, engineering, and technical staff.  Engineering practice requires that professionals use a combination of technical skills and judgment in decision making.  Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare.  This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary.  Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials.  As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public.  It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed.  It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise.  MDOT Leadership is committed to a culture of innovation to optimize engineering solutions.
 +
The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons.  Those canons are provided below.
 +
Engineers, in the fulfillment of their professional duties, shall:
 +
::#Hold paramount the safety, health, and welfare of the public.
 +
::#Perform Services only in areas of their competence.
 +
::#Issue public statement only in an objective and truthful manner.
 +
::#Act for each employer or client as faithful agents or trustees.
 +
::#Avoid deceptive acts.
 +
::#Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession.
  
<center></center>
 
  
<center>'''FOREWORD'''</center>
+
This manual has been revised throughout to incorporate changes brought about by the release of the 2012 Standard Specifications for Construction and by progress in equipment, construction practices, and materials. The format has been established to follow the standard specification outline with divisions and sections set up to facilitate revision and addition of new information as needed.
  
<center></center>
 
  
<center></center>
+
Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the [[Help:Contents]] page.
  
This manual has been prepared to give information and guidance to construction project personnel associated with the Michigan Department of Transportation (MDOT).  In case of conflict between the Standard Specifications for Construction or contract documents and this manual, the specifications and contract documents will have precedence.
 
  
 
+
{{top}}
 
+
[[Category:Construction Manual]]
This manual has been revised throughout to incorporate changes brought about by the release of the 2012 Standard Specifications for Construction and by progress in equipment, construction practices, and materials. The format has been established to follow the standard specification outline with divisions and sections set up to facilitate revision and addition of new information as needed.
 
 
 
 
 
Testing the changes to wiki page.
 
 
 
 
 
<center>'''MDOT ''''''Mission'''''' Statement:'''</center>
 
 
 
 
 
 
 
<center>Providing the highest quality integrated transportation services</center>
 
 
 
<center>for economic benefit and improved quality of life.</center>
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
<center>'''
 
 
 
'''TABLE OF CONTENTS'''</center>
 
 
 
 
 
 
 
 
 
 
 
'''General - Contract Administration'''
 
 
 
 
 
 
 
[[Division 1 – General Provisions]]
 
 
 
[[101 - General Project Administration|101    Terms, Format, and Definitions]]
 
 
 
102    Bid Submission, Award, and Execution of Contract
 
 
 
103    Scope of the Work
 
 
 
104    Control of the Work
 
 
 
105    Control of Materials
 
 
 
106    Quality Assurance Acceptance Program
 
 
 
107    Legal Relations and Responsibilities to the Public
 
 
 
108    Prosecution and Progress
 
 
 
109    Measurement and Payment
 
 
 
150    Mobilization
 
 
 
 
 
 
 
'''Division 2 - Earthwork'''
 
 
 
[[201 - Clearing|201    Clearing]]
 
 
 
[[202 - Removing Trees, Stumps, and Corduroy|202    Removing Trees, Stumps, and Corduroy]]
 
 
 
[[203 - Removing Drainage Structures, Culverts, and Sewers|203    Removing Drainage Structures, Culverts, and Sewers]]
 
 
 
[[204 - Removing Miscellaneous Structures and Materials|204    Removing Miscellaneous Structures, and Materials]]
 
 
 
205    Roadway Earthwork
 
 
 
[[206 - Excavation and Backfill for Structures|206    Excavation and Backfill for Structures]]
 
 
 
207    Obliterating Roadway
 
 
 
[[208 - Soil Erosion and Sedimentation Control (NPDES)|208    Soil Erosion and Sedimentation Control]]
 
 
 
[[209 - Project Cleanup|209    Project Cleanup]]
 
 
 
 
 
'''Division 3 - Bases'''
 
 
 
[[301 - Subbase|301    Subbase]]
 
 
 
[[302 - Aggregate Base Courses|302    Aggregate Base Course]]
 
 
 
[[303 - Open Graded Drainage Course|303    Open-Graded Drainage Courses]]
 
 
 
[[304 - Rubbilizing Existing PCC Pavement|304    Rubblizing Portland Cement Concrete Pavement]]
 
 
 
[[305 - HMA Base Crushing and Shaping|305    HMA Base Crushing and Shaping]]
 
 
 
[[306 - Aggregate Surface Course|306    Aggregate Surface Course]]
 
 
 
[[307 - Aggregate Shoulders and Approaches|307    Aggregate Shoulders and Approaches]]
 
 
 
308    Geotextile for Base
 
 
 
 
 
 
 
'''Division 4 - Drainage Features'''
 
 
 
[[401 - Culverts|401    Pipe Culverts]]
 
 
 
[[402 - Storm Sewers|402    Storm Sewers]]
 
 
 
[[403 - Drainage Structures|403    Drainage Structures]]
 
 
 
[[404 - Underdrain|404    Underdrains]]
 
 
 
[[405 - Pump Station Construction|405    Pump Station Construction]]
 
 
 
406    Precast Three-Sided, Arch, AND Box Culverts
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
'''Division 5 - Hot Mix Asphalt Pavements and Surface Treatments'''
 
 
 
[[501 - HMA Mixtures|501    Plant Produced Hot Mix Asphalt]]
 
 
 
502    HMA Crack Treatment
 
 
 
[[503 - Contractor Quality Control for HMA|503    Paver Placed Surface Seal]]
 
 
 
[[504 - Furnishing and Placing HMA Mixtures (Quality Assurance)|504    Micro-Surfacing]]
 
 
 
[[505 - Overband Crack Seal|505    Chip Seals]]
 
 
 
[[506 - Slurry Seal|506    Slurry Seal]]
 
 
 
 
 
'''Division 6 - Portland Cement Concrete Pavements'''
 
 
 
[[601 - PCC Pavement Mixtures|601    Portland Cement Concrete for Pavements]]
 
 
 
602    Concrete Pavement Construction
 
 
 
603    Concrete Pavement Restoration
 
 
 
[[604 - Contractor Quality Control for Concrete|604    Contractor Quality Control for Concrete]]
 
 
 
[[605 - Contractor Quality Assurance for Concrete|605    Quality Assurance (Acceptance) for Concrete]]
 
 
 
 
 
 
 
'''Division 7 - Structures'''
 
 
 
[[701 - Portland Cement Concrete|701    Portland Cement Concrete for Structures]]
 
 
 
[[702 - Mortar and Grout|702    Mortar and Grout]]
 
 
 
[[703 - Mortar and Concrete Patching Repair and Resurfacing Mixes|703    Mortar and Concrete Patching, Repair, and Resurfacing Mixtures]]
 
 
 
[[704 - Steel Piling and Cofferdams|704    Steel Sheet Piling and Cofferdams]]
 
 
 
[[705 - Foundation Piling|705    Foundation Piling]]
 
 
 
[[706 - Structural Concrete|706    Structural Concrete Construction]]
 
 
 
[[707 - Structural Steel|707    Structural Steel Construction]]
 
 
 
[[708 - Precast Concrete Beams (Prestressed)|708    Prestressed Concrete]]
 
 
 
[[709 - Timber Sturctures|709    Timber Structures]]
 
 
 
[[710 - Waterproofing and Protective Covers|710    Waterproofing and Protective Covers]]
 
 
 
[[711 - Bridge Railings|711    Bridge Railings]]
 
 
 
712    Bridge Rehabilitation - Concrete
 
 
 
[[713 - Bridge Rehabilitation, Steel|713    Bridge Rehabilitation - Steel]]
 
 
 
[[714 - Temporary Structures and Approaches|714    Temporary Structures and Approaches]]
 
 
 
[[715 - Cleaning and Coating Existing Structural Steel|715    Cleaning and Coating Existing Structural Steel]]
 
 
 
[[716 - Shop Cleaning and Coating Structural Steel|716    Shop Cleaning and Coating Structural Steel]]
 
 
 
[[717 - Downspouts and Drains|717    Downspouts and Drains]]
 
 
 
718    Drilled Shafts
 
 
 
 
 
 
 
'''Division 8 - Incidental Construction'''
 
 
 
[[801 - Concrete Driveways|801    Concrete Driveways]]
 
 
 
[[802 - Concrete Curb, Gutter, and Dividers|802    Concrete Curb, Gutter, and Dividers]]
 
 
 
[[803 - Concrete Sidewalk, Ramps, and Steps|803    Concrete Sidewalks, Sidewalk Ramps, and Steps]]
 
 
 
[[804 - Concrete Barriers and Glare Screens|804    Concrete Barriers, Glare Screens, and Foundations for Light Standards and Sign Supports]]
 
 
 
[[805 - Hot Mix Asphalt Curb|805    Hot Mix Asphalt Curb]]
 
 
 
[[806 - Bicycle Paths|806    Shared Use Paths]]
 
 
 
[[807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts|807    Guardrail, Guardrail Terminals, and Miscellaneous Posts]]
 
 
[[808 - Fencing|808    Fencing]]
 
 
 
[[809 - Field Office|809    Field Office]]
 
 
 
[[810 - Permanent Traffic Signs and Supports|810    Permanent Traffic Signs and Supports]]
 
 
 
[[811 - Permanent Pavement Markings|811    Permanent Pavement Markings]]
 
 
 
[[812 - Temporary Traffic Control for Construction Zone Operations|812    Temporary Traffic Control for Construction Zone Operations]]
 
 
 
[[813 - Slope Protection|813    Slope Protection]]
 
 
 
[[814 - Paved Ditches|814    Paved Ditches]]
 
 
 
[[815 - Landscaping|815    Landscaping]]
 
 
 
[[816 - Turf Establishment|816    Turf Establishment]]
 
 
 
[[817 - Landscape Mowing|817    Landscape Mowing]]
 
 
 
[[818 - Dune Grass Planting|818    Dune Grass Planting]]
 
 
 
[[819 - Electrical and Lighting|819    Electrical and Lighting]]
 
 
 
[[820 - Traffic Signals|820    Traffic Signals]]
 
 
 
[[821 - Preservation of Land Monuments and Property Corners|821    Preservation of Land Monuments, Control Points, and Property Corners]]
 
 
 
[[822 - Ground or Cut Centerline and Shoulder Corrugations|822    Ground or Cut Shoulder Corrugations]]
 
 
 
823    Water Mains
 
 
 
824    Contractor Staking
 
 
 
 
 
 
 
'''Division 9 - Materials'''
 
 
 
901    Cement and Lime
 
 
 
902    Aggregates
 
 
 
903    Admixtures and Curing Materials for Concrete
 
 
 
904    Asphaltic Materials
 
 
 
905    Steel Reinforcement
 
 
 
906    Structural Steel
 
 
 
907    Fencing Materials
 
 
 
908    Miscellaneous Metal Products
 
 
 
909    Drainage Products
 
 
 
910    Geosynthetics
 
 
 
911    Water
 
 
 
912    Timber and Lumber
 
 
 
913    Masonry Units
 
 
 
914    Joint and Waterproofing Materials
 
 
 
915    Bridge Coating Systems
 
 
 
916    Erosion and Sedimentation Control Materials
 
 
 
917    Turf and Landscaping Materials
 
 
 
918    Electrical and Lighting Materials
 
 
 
919    Permanent Traffic Sign and Support Materials
 
 
 
920    Permanent Pavement Marking Materials
 
 
 
921    Permanent Traffic Signal Materials
 
 
 
922    Temporary Traffic Control Materials
 
 
 
923    Water Main Materials
 
 
 
 
 
[[Early CM Format]]
 

Revision as of 10:49, 4 October 2019

www.michigan.gov/mdot


CONSTRUCTION MANUAL


Logo.jpg


Bureau of Field Services
Construction Field Services Division

Box culvert construction on M-10 in Clare County.

MDOT Mission Statement

Providing the highest quality integrated transportation services for economic benefit and improved quality of life.


Current News

Documentation Guide

The NEW Documentation Guide is now available to replace the former "Minimum Documentation Guide" content (Updated July 2019). A link to the new "Documentation Guide" has been established in the Side Bar to the left. It can also be accessed by clicking on the thumbnail below.

Documentation Guide Final Draft 07-29-19.pdf

[top of page]


Recent Major Changes

The table below is a list of Major changes.

Updated Division Section Summary What Changed
9/26/2019
1
105
2019 Summary of revisions to the Materials Quality Assurance Procedures Manual Compare It
9/26/2019
8
811
Permanent Pavement Markings Field Inspection and Processing of Progress Payments: Updated new content Compare It
9/18/2019
6
602
Load Transfer Assemblies: Updated new content and included Presentation for Load Transfer Assemblies Inspections Compare It
9/18/2018
8
811
Updated Paint pricing for 2019 View Updated Table Here
8/30/2019
1
102
Update to Trunkline Boilerplate Preconstruction Meeting Minutes - 2019 View Here
8/20/2019
1 Supplemental
FieldManager
New guidance related to the Standard Rounding Convention Compare It
7/31/2019
Main Page
Main Page
July update to the Documentation Guide which includes corrections related to density requirements. It also includes updated language related to the "e-Final Project Review Procedures" View Here
6/26/2019
1
109
Updated: Final Project Review Procedures to the new "e-Final Project Review Procedures" Compare It
5/28/2019
1
102.02
Updated to Boilerplate Progress Clause Template Compare It
4/9/2019
1
103.02
Updates and clarifications related to Detailed Contract Modification Information area as well as the Design Issue/Premium Costs area related to Contract Revisions Compare It
3/19/2019
1
103.02
Provided link to current Local Agency Programs Section Federal Guidelines Compare It
3/19/2019
1
102
Preconstruction Meeting Minutes Boilerplate - Local Agency Compare It
3/6/2019
1
102.02
Removed old production rate information and replaced with new .xlsx file containing updated production rate information Compare It
2/28/2019
Main Page
Main Page
New Documentation Guide is now available to replace former "Minimum Documentation Guide" content. Link to the "Documentation Guide" also established in Side Bar to the left. View Here
1/10/2019
1
104.10
Updated Contractor Claims Procedure for 2019 View Here
12/12/2018
1
102.02
Updated Boilerplate Progress Clause Template View Here
11/7/2018
1
102
Preconstruction Meeting Minutes Boilerplate - Trunkline Compare It
10/26/2018
8
811
Updated Paint pricing for 2018 View Updated Table Here

A definition to the types of changes that you might see in the Construction Manual can be found under Content Revision Procedures, Types of Changes.

[top of page]


Recent Minor Changes

The table below is a list of Minor changes.

Updated Division Section Summary What Changed
10/3/2019
8
811
Removal of references to outdated paint marking turn arrows Compare It
8/22/2019
1
107.09
Update related to the process for archeological findings Compare It
7/11/2019
2
208
Added 2 flowcharts for Notice of Coverage (NOC) and Notice of Termination (NOT) in section 208 between “Notification” and “Training”. Also updated language to reflect recent name change of the "Michigan Department of Environmental Quality (MDEQ)" to the "Michigan Department of Environment, Great Lakes, and Energy (EGLE)" Compare It
6/25/2019
1
107.19
Removed Hauling Route Permit Guidance Compare It
6/20/2019
E-Construction
Standard Naming Convention for Documents
Updated Naming Convention Table to reflect recent changes. Compare It
6/17/2019
1 Supplemental
Certification Programs
Updated Engineer Record Certification List View Here
5/20/2019
1
102.02
Added Barrier Gates and Work Zone Speed Trailers to "Typical Long-Lead Items" table Compare It
4/17/2019
1
102.02
Minor update to heading of Column 2 for Typical Long-Lead Items Compare It
4/1/2019
1
102.02
Added Delineator and 3# U-Channel Posts to Typical Long-Lead Items table Compare It
3/14/2019
7
715
Updated content related to: Health and Safety, Respiratory Protection and Protective Equipment, Medical Surveillance, Exposure Monitoring, Hygiene Facilities, and Lead Awareness Training Compare It
3/13/2019
1
102.02
Added Strain Poles to Typical Long-Lead Items table Compare It
1/22/2019
7
718
Provided clarification relating to Tremie Tube Concrete Placement along with inspection of shaft after Placing Steel Reinforcement cage Compare It
1/16/2019
1
109.05
Clarification related to small tools for Force Account Work Compare It
12/3/2018
1 Supplemental
Certification Programs
Updated Engineer Record Certification List View Here

[top of page]


Preamble

This manual provides guidance to administrative, engineering, and technical staff. Engineering practice requires that professionals use a combination of technical skills and judgment in decision making. Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare. This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary. Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials. As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public. It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed. It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise. MDOT Leadership is committed to a culture of innovation to optimize engineering solutions. The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons. Those canons are provided below. Engineers, in the fulfillment of their professional duties, shall:

  1. Hold paramount the safety, health, and welfare of the public.
  2. Perform Services only in areas of their competence.
  3. Issue public statement only in an objective and truthful manner.
  4. Act for each employer or client as faithful agents or trustees.
  5. Avoid deceptive acts.
  6. Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession.


This manual has been revised throughout to incorporate changes brought about by the release of the 2012 Standard Specifications for Construction and by progress in equipment, construction practices, and materials. The format has been established to follow the standard specification outline with divisions and sections set up to facilitate revision and addition of new information as needed.


Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the Help:Contents page.


[top of page]