Difference between revisions of "Main Page"

From MediaWiki
Jump to navigation Jump to search
m (Preamble edit)
(→‎Recent Minor Changes: misread instructions - needed to delete highlights altogether)
(85 intermediate revisions by 4 users not shown)
Line 2: Line 2:
  
  
<center><span STYLE="font: 40pt arial;">'''CONSTRUCTION MANUAL'''</span></center>
+
<center><span STYLE="font: 25pt arial;">'''CONSTRUCTION MANUAL'''</span></center>
  
  
<center>[[File:logo.jpg|400px]]</center>
+
<center>[[File:logo.jpg|250px]]</center>
  
  
  
<center><span STYLE="font: 30pt arial;">'''Bureau of Field Services'''</span></center>
+
<center><span STYLE="font: 20pt arial;">'''Bureau of Field Services'''</span></center>
  
<center><span STYLE="font: 15pt arial;">'''Construction Field Services Division '''</span></center>
+
<center><span STYLE="font: 15pt arial;">''Construction Field Services Division''</span></center>
  
[[File:DI-05222-017.jpg|800px|thumb|center|I-96. Cascade Rd. Diverging Diamond Interchange project in Grand Rapids, Kent County.]]
+
<span style="float: right;">
 +
<center><span style="float: right;">[[File:DI-06801-092.jpg|450px|thumb|right|Box culvert construction on M-10 in Clare County.]]</span></center>
 +
</span>
  
[[File:DI-05650-060.jpg|300px|thumb|Construciton on Bridge decks on the Square Lake Rd. Interchange project.]]
+
=[[#MDOT Mission Statement|MDOT Mission Statement]]=
 
 
[[File:DI-05649-050.jpg|300px|thumb|Construction work on the M-1 Rail Woodward Ave.]]
 
 
 
==[[#Preamble|Preamble]]==
 
 
 
 
 
This manual provides guidance to administrative, engineering, and technical staff.  Engineering practice requires that professionals use a combination of technical skills and judgment in decision making.  Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare.  This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary.  Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials.  As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public.  It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed.  It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise.  MDOT Leadership is committed to a culture of innovation to optimize engineering solutions.
 
The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons.  Those canons are provided below.
 
Engineers, in the fulfillment of their professional duties, shall:
 
::#Hold paramount the safety, health, and welfare of the public.
 
::#Perform Services only in areas of their competence.
 
::#Issue public statement only in an objective and truthful manner.
 
::#Act for each employer or client as faithful agents or trustees.
 
::#Avoid deceptive acts.
 
::#Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession.
 
 
 
 
 
This manual has been revised throughout to incorporate changes brought about by the release of the 2012 Standard Specifications for Construction and by progress in equipment, construction practices, and materials. The format has been established to follow the standard specification outline with divisions and sections set up to facilitate revision and addition of new information as needed.
 
 
 
 
 
Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the [[Help:Contents]] page.
 
 
 
 
 
Since it's release in April of 2014 there are a total of {{NUMBEROFUSERS}} registered users of the MDOT Construction Manual.
 
 
 
{{top}}
 
 
 
===[[#MDOT Mission Statement|MDOT Mission Statement]]===
 
 
Providing the highest quality integrated transportation services for economic benefit and improved quality of life.
 
Providing the highest quality integrated transportation services for economic benefit and improved quality of life.
  
{{top}}
 
  
== General Information ==
+
=[[Current News|<font color="red">Current News</font>]]=
===[[#Current News|Current News]]===
 
With the first release of the MDOT Wiki Construction Manual there are bound to be some errors.  If you find an error on a page please contact the Content Manager for that particular Division located [[Help:Contents#Content_Suggestions|here]] in the [[Help:Contents|Help page]].  Some sections are still undergoing content revisions, most have been identified by the Content Managers and are noted as such in the Wiki Constrution Manual.
 
  
 +
==[[#Documentation Guide|Documentation Guide]]==
 +
The NEW Documentation Guide is now available to replace the former "Minimum Documentation Guide" content (Updated July 2019). A link to the new "Documentation Guide" has been established in the Side Bar to the left. It can also be accessed by clicking on the thumbnail below.
  
Content will be revised frequently and a way to monitor what changes have occured recently is by using the [[Special:RecentChanges|Recent changes]] page.  This page will show all major and minor edits along with new users that were created.  Pretty much everything that goes on in the Construction Manual.  For a more specific listing of content changes you will want to see the [[Main_Page#Recent_Major_Changes|Recent Major Changes]] page or [[Main_Page#Recent_Minor_Changes|Recent Minor Changes]] page which contain manually updated lists of content changes for specific sections of the Construction Manual.
+
[[File:Documentation Guide Final Draft 07-29-19.pdf|thumb|center|200px|link=//{{SERVERNAME}}/images_construction/6/6a/Documentation_Guide_Final_Draft_07-29-19.pdf]]
  
 
{{top}}
 
{{top}}
  
====[[#Recent Major Changes|'''Recent Major Changes''']]====
+
==[[#Recent Major Changes|Recent Major Changes]]==
 
 
 
The table below is a list of Major changes.   
 
The table below is a list of Major changes.   
 
<div style="overflow:auto; height:200px; width:700px">
 
<div style="overflow:auto; height:200px; width:700px">
Line 65: Line 37:
 
!Updated!! Division !! Section !! Summary !! What Changed
 
!Updated!! Division !! Section !! Summary !! What Changed
 
|-
 
|-
|<center>11/3/2017</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Testing Charges]]</center>||Updated LDPR coding||[http://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use View here]
+
|<center>9/26/2019</center>||<center>1</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual| 105]]</center>||2019 Summary of revisions to the Materials Quality Assurance Procedures Manual ||[http://mdotwiki.state.mi.us/construction/index.php?title=Materials_Quality_Assurance_Procedures_Manual&diff=5642&oldid=5497 Compare It]
 
|-
 
|-
|<center>11/2/2017</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal|102.02]]</center>||Updated Boilerplate Progress Clause Template||[http://mdotwiki.state.mi.us/construction/index.php/File:Boilerplate_Progress_Clause_Template_10-25-17_.docx View Here]
+
|<center>9/26/2019</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Field_Inspection_and_Processing_of_Progress_Payments|811]]</center>||Permanent Pavement Markings Field Inspection and Processing of Progress Payments: Updated new content ||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=5640&oldid=5632 Compare It]
 
|-
 
|-
|<center>11/2/2017</center>||<center>1 Supplemental</center>||<center>[[E-Construction|E-Construction]]</center>||Updated table for file naming||[http://mdotwiki.state.mi.us/construction/index.php/E-Construction#e-Construction.2FPaper_File_System View table here]
+
|<center>9/18/2019</center>||<center>6</center>||<center>[[602_-_Concrete_Pavement_Construction#Load_Transfer_Assemblies|602]]</center>||Load Transfer Assemblies: Updated new content and included Presentation for Load Transfer Assemblies Inspections||[http://mdotwiki.state.mi.us/construction/index.php?title=602_-_Concrete_Pavement_Construction&diff=5629&oldid=5556 Compare It]
 
|-
 
|-
|<center>11/1/2017</center>||<center>1 Supplemental</center>||<center>[[Local_Agency|Local Agency]]</center>||Updated coding information for SIGMA||[http://mdotwiki.state.mi.us/construction/index.php/Local_Agency#CHARGING_TIME_TO_LOCAL_AGENCY_PROJECTS View Here]
+
|<center>9/18/2018</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings|811]]</center>||Updated Paint pricing for 2019||[http://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#UNIFORM_PRICE_ADJUSTMENT.2C_REGULAR_DRY_PAINT_AND_LOW_TEMPERATURE_WATERBORNE_PAINT View Updated Table Here]
 
|-
 
|-
|<center>10/26/2017</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings|811]]</center>||Added new section for Special Markings for Cold Weather||[http://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#Temporary_Special_Markings_for_Cold_Weather View Here]
+
|<center>8/30/2019</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||Update to Trunkline Boilerplate Preconstruction Meeting Minutes - 2019||[//{{SERVERNAME}}/images_construction/5/5e/TRUNKLINE_Boilerplate_Preconstruction_Meeting_Minutes_2019_Final.docx View Here]
 
|-
 
|-
|<center>10/19/2017</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings|811]]</center>||Updated Paint pricing for 2017||[http://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#UNIFORM_PRICE_ADJUSTMENT.2C_REGULAR_DRY_PAINT_AND_LOW_TEMPERATURE_WATERBORNE_PAINT View Updated Table Here]
+
|<center>8/20/2019</center>||<center>1 Supplemental</center>||<center>[[FieldManager#Standard_Rounding_Convention_Guidance|FieldManager]]</center>||New guidance related to the Standard Rounding Convention ||[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=5615&oldid=5386 Compare It]
 
|-
 
|-
|<center>9/21/2017</center>||<center>1</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual|Materials Quality Assurance Procedures Manual]]</center>||2017 Summary of Revision to the manual||
+
|<center>7/31/2019</center>||<center>Main Page</center>||<center>Main Page</center>||July update to the Documentation Guide which includes corrections related to density requirements. It also includes updated language related to the [//{{SERVERNAME}}/images_construction/6/6a/Documentation_Guide_Final_Draft_07-29-19.pdf#page=3 "e-Final Project Review Procedures"]||[//{{SERVERNAME}}/images_construction/6/6a/Documentation_Guide_Final_Draft_07-29-19.pdf View Here]
 
|-
 
|-
|<center>9/14/2017</center>||<center>1 Supplemental</center>||<center>[[Local_Agency#Project_Administration:_MDOT_Oversight_Folder|Local Agency]]</center>||Guidance on new folder in ProjectWise||
+
|<center>6/26/2019</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment|109]]</center>||Updated: Final Project Review Procedures to the new [[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#e-Final_Project_Review_Procedures|"e-Final Project Review Procedures"]]||[http://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&diff=5578&oldid=5538 Compare It]
 
|-
 
|-
|<center>9/6/2017</center>||<center>1</center>||<center>[[LCPtracker_Supplemental_Information|LCPtracker Tracker]]</center>||New Page specifically for LCPtracker||
+
|<center>5/28/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause|102.02]]</center>||Updated to Boilerplate Progress Clause Template||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5567&oldid=5553 Compare It]
 
|-
 
|-
|<center>8/24/2017</center>||<center>1</center>||<center>[[102.14_Construction_Progress_Schedule|102.14]]</center>||Moved progress form 1130 to new section 102.14||
+
|<center>4/9/2019</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Detailed_Contract_Modification_Information|103.02]]</center>||Updates and clarifications related to [[103.02_Contract_Revisions#Detailed_Contract_Modification_Information|Detailed Contract Modification Information]] area as well as the [[103.02_Contract_Revisions#Design_Issues.2FPremium_Costs|Design Issue/Premium Costs]] area related to Contract Revisions||[http://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&diff=5534&oldid=5521 Compare It]
 
|-
 
|-
|<center>7/11/2017</center>||<center>1</center>||<center>[[108.01_Subcontracting_of_Contract_Work#Construction_Subcontract_Process|108.1]]</center>||Changed email for 1302A Forms||[mailto:MDOT-ConstructionSubcontracts@michigan.gov New email address here]
+
|<center>3/19/2019</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Local_Agency_Projects|103.02]]</center>||[https://www.michigan.gov/documents/mdot_federal_Guidelines_99105_7.pdf Provided link to current Local Agency Programs Section Federal Guidelines]||[http://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&diff=5521&oldid=5256 Compare It]
 
|-
 
|-
|<center>6/20/2017</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Construction Field Services Indirect Testing Charges]]</center>||New coding content||[http://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use View Coding Guidelines here]
+
|<center>3/19/2019</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||[http://mdotwiki.state.mi.us/construction/index.php/File:LOCAL_AGENCY_Boilerplate_Preconstruction_Meeting_Minutes_-_March_2019.docx Preconstruction Meeting Minutes Boilerplate - Local Agency]||[http://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting&diff=5519&oldid=5406 Compare It]
 
|-
 
|-
|<center>6/16/2016</center>||<center>1 Supplemental</center>||<center>[[FieldManager|FieldManager]]</center>||Addition of CMU 2017-003, Electronic Read only Files||[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=4895&oldid=4836 View Here]
+
|<center>3/6/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal#Construction_Time_Estimates_-_Production_Rates|102.02]]</center>||Removed old production rate information and replaced with [http://mdotwiki.state.mi.us/construction/index.php/File:MDOT_Production_Rates_.xlsx new .xlsx file containing updated production rate information]||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5510&oldid=5439 Compare It]
 
|-
 
|-
|<center>6/16/2016</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs#Engineer_Certification_Program| Engineer Certification]]</center>||Updated Engineer Certification List||[//{{SERVERNAME}}/images_construction/8/8a/Eng_Record_Cert_list_06-01-17.pdf Linked Here]
+
|<center>2/28/2019</center>||<center>Main Page</center>||<center>Main Page</center>||New Documentation Guide is now available to replace former "Minimum Documentation Guide" content. Link to the "Documentation Guide" also established in Side Bar to the left. ||[//{{SERVERNAME}}/images_construction/0/0d/Documentation_Guide_Final_Draft_02-25-19.pdf View Here]
 
|-
 
|-
|<center>4/25/2017</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal#Progress_Clause| 102.02]]</center>||Update according to CA 2015-11 with Boiler progress update.||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal&diff=4631&oldid=4454 Compare It]
+
|<center>1/10/2019</center>||<center>1</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension|104.10]]</center>||Updated Contractor Claims Procedure for 2019||[http://mdotwiki.state.mi.us/construction/index.php?title=File:MDOT_Construction_Contractor_Claims_Procedure_January_2019.pdf&page=1 View Here]
 
|-
 
|-
|<center>4/21/2017</center>||<center>1</center>||<center>[[Contract_Administration_and_Oversight_Guidelines_for_Projects_Containing_Warranty_Work|Contract Admin]]</center>||Added content according to CA 2015-13||[http://mdotwiki.state.mi.us/construction/index.php?title=Contract_Administration_and_Oversight_Guidelines_for_Projects_Containing_Warranty_Work&diff=4616&oldid=4544 Compare It]
+
|<center>12/12/2018</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal|102.02]]</center>||Updated Boilerplate Progress Clause Template||[http://mdotwiki.state.mi.us/construction/index.php/File:Boilerplate_Progress_Clause_Template_12-12-18.docx View Here]
 
|-
 
|-
|<center>4/19/2017</center>||<center>2</center>||<center>[[205_-_Roadway_Earthwork#Cost_Over_Runs_From_Off_Site_Disposal_of_Soil|205]]</center>||Added content in accordance with CA 2008-01||[http://mdotwiki.state.mi.us/construction/index.php?title=205_-_Roadway_Earthwork&diff=4609&oldid=4268 Compare It]
+
|<center>11/7/2018</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||Preconstruction Meeting Minutes Boilerplate - Trunkline||[http://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting&diff=5406&oldid=5265 Compare It]
 
|-
 
|-
|<center>4/19/2017</center>||<center>1</center>||<center>[[104.07_Contractor_Obligations#Project_.26_Worksite_Safety|104.07]]</center>||Added Content according to CA 2013-12, Workers Safety||[http://mdotwiki.state.mi.us/construction/index.php?title=104.07_Contractor_Obligations&diff=4605&oldid=4570 Compare It]
+
|<center>10/26/2018</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings|811]]</center>||Updated Paint pricing for 2018||[http://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#UNIFORM_PRICE_ADJUSTMENT.2C_REGULAR_DRY_PAINT_AND_LOW_TEMPERATURE_WATERBORNE_PAINT View Updated Table Here]
|-
 
|<center>4/19/2017</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions#Force Account Work|109.05]]</center>||Made adjustments to implement form 1101-SP109||[http://mdotwiki.state.mi.us/construction/index.php?title=109.05_Payment_for_Contract_Revisions&diff=4603&oldid=4588 Compare It]
 
|-
 
|<center>4/5/2017</center>||<center>1</center>||<center>[[Prevailing_Wage_Oversight_Procedures#Prevailing_Wage_Classifications|Prevailing Wage]]</center>||Added Section for Prevailing Wage Classification from CA 2007-15||[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures#Prevailing_Wage_Classifications View Here]
 
|-
 
|<center>3/27/2017</center>||<center>1 Supplemental</center>||<center>[[Other#Oversight of Maintenance Funded Projects Using the Michigan Department of Transportation Letting System|Other]]</center>||Added Section 11 from CA 2011-12 to CM||[http://mdotwiki.state.mi.us/construction/index.php?title=Other&diff=4405&oldid=4290 Compare It]
 
 
|}
 
|}
 
</div>
 
</div>
Line 112: Line 78:
 
{{top}}
 
{{top}}
  
====[[#Recent Minor Changes|'''Recent Minor Changes''']]====
+
==[[#Recent Minor Changes|Recent Minor Changes]]==
 
The table below is a list of Minor changes.   
 
The table below is a list of Minor changes.   
 
<div style="overflow:auto; height:200px; width:700px">
 
<div style="overflow:auto; height:200px; width:700px">
Line 119: Line 85:
 
!Updated!! Division !! Section !! Summary !! What Changed
 
!Updated!! Division !! Section !! Summary !! What Changed
 
|-
 
|-
|<center>11/2/2016</center>||<center>1</center>||<center>NA</center>||Removed 'Disincentive' from manual language||
+
|<center>10/3/2019</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Pavement_Marking_Turn_Arrows|811]]</center>||Removal of references to outdated paint marking turn arrows||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=5647&oldid=5640 Compare It]
 
|-
 
|-
|<center>10/26/2017</center>||<center>1</center>||<center>[[103.02_Contract_Revisions|103.02]]</center>||Moved ''Contract Modification Process Overview'' page to ''103.02 Contract Revisions||[http://mdotwiki.state.mi.us/construction/index.php/103.02_Contract_Revisions View Here]
+
|<center>8/22/2019</center>||<center>1</center>||<center>[[107.09_Archeological_and_Historical_Findings|107.09]]</center>||Update related to the process for archeological findings||[http://mdotwiki.state.mi.us/construction/index.php?title=107.09_Archeological_and_Historical_Findings&diff=5618&oldid=4933 Compare It]
 
|-
 
|-
|<center>10/25/2017</center>||<center>7 Supplemental</center>||<center>[[Division 7 Supplemental Information#Division_7_Supplemental_Information|Division 7 Supplemental Information]]</center>||Updated notification contact information for bridge deck pours and concrete deck overlays||[https://mdotwiki.state.mi.us/construction/index.php?title=Division_7_Supplemental_Information&diff=5064&oldid=4970 View Update]
+
|<center>7/11/2019</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208]]</center>||Added 2 flowcharts for Notice of Coverage (NOC) and Notice of Termination (NOT) in section 208 between “Notification” and “Training”. Also updated language to reflect recent name change of the "Michigan Department of Environmental Quality (MDEQ)" to the "Michigan Department of Environment, Great Lakes, and Energy (EGLE)"||[http://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&diff=5586&oldid=5241 Compare It]
 
|-
 
|-
|<center>10/23/2017</center>||<center>1</center>||<center>NA</center>||Changed language from "Approved for Traffic" to "Open to traffic"||
+
|<center>6/25/2019</center>||<center>1</center>||<center>[[107.19_Hauling_on_Local_Roads_and_Streets#Hauling_on_Local_Roads_and_Streets|107.19]]</center>||Removed Hauling Route Permit Guidance||[http://mdotwiki.state.mi.us/construction/index.php?title=107.19_Hauling_on_Local_Roads_and_Streets&diff=5577&oldid=4936 Compare It]
 
|-
 
|-
|<center>10/16/2017</center>||<center>1 Supplemental</center>||<center>[[Other#Post-Construction_Reviews|Other]]</center>||Updated Wording on Post Construction Meeting document||[//{{SERVERNAME}}/images_construction/9/93/Post-Construction_Review_Meetings.pdf View Here]
+
|<center>6/20/2019</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|E-Construction]]</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|Standard Naming Convention for Documents]]</center>||Updated Naming Convention Table to reflect recent changes.||[http://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&diff=5574&oldid=5563 Compare It]
 
|-
 
|-
|<center>10/11/2017</center>||<center>8</center>||<center>[[803_-_Concrete_Sidewalk,_Ramps,_and_Steps#MEASUREMENT_AND_PAYMENT|803]]</center>||Added illustration of sidewalk measurement and payment||[//{{SERVERNAME}}/images_construction/7/72/Road_Design_Manual_Chapter_6_-_ADA_Ramp_payment_items.pdf See Here]
+
|<center>6/17/2019</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs|Certification Programs]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/a/af/Eng_Record_Cert_list_06-17-19.pdf View Here]
 
|-
 
|-
|<center>9/26/2017</center>||<center>1</center>||<center>[[Prevailing_Wage_Oversight_Procedures|Prevailing Wage Oversight Procedures]]</center>||Updated Posters to add USERRA Poster||[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures#JOBSITE_POSTING View Here]
+
|<center>5/20/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Added Barrier Gates and Work Zone Speed Trailers to "Typical Long-Lead Items" table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5553&oldid=5539 Compare It]
 
|-
 
|-
|<center>4/24/2017</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Pay_Item_Selection|109.07]]</center>||Updated according CA 2015-06||[http://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&diff=4622&oldid=4591 Compare It]
+
|<center>4/17/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Minor update to heading of Column 2 for Typical Long-Lead Items||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5539&oldid=5526 Compare It]
 
|-
 
|-
|<center>4/24/2017</center>||<center>1</center>||<center>[[Disadvantaged_Business_Enterprises_(DBE)#Disadvantages_Business_Enterprises_.28DBE.29|Disadvantaged Business]]</center>||Updated content according CA 2014-13||[http://mdotwiki.state.mi.us/construction/index.php?title=Disadvantaged_Business_Enterprises_%28DBE%29&diff=4620&oldid=4571 Compare It]
+
|<center>4/1/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Added Delineator and 3# U-Channel Posts to Typical Long-Lead Items table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5526&oldid=5523 Compare It]
 
|-
 
|-
|<center>4/21/2017</center>||<center>1 Supplemental</center>||<center>[[Local_Agency#PROJECT_ADMINISTRATION_MDOT-LET_LOCAL_AGENCY_PROJECTS|Local Agency]]</center>||Updated content according to CA 2009-16||[http://mdotwiki.state.mi.us/construction/index.php?title=Local_Agency&diff=4618&oldid=4574 Compare It]
+
|<center>3/14/2019</center>||<center>7</center>||<center>[[715_-_Cleaning_and_Coating_Existing_Structural_Steel#Health_and_Safety|715]]</center>||Updated content related to: Health and Safety, Respiratory Protection and Protective Equipment, Medical Surveillance, Exposure Monitoring, Hygiene Facilities, and Lead Awareness Training||[http://mdotwiki.state.mi.us/construction/index.php?title=715_-_Cleaning_and_Coating_Existing_Structural_Steel&diff=5516&oldid=5480 Compare It]
 
|-
 
|-
|<center>4/20/2017</center>||<center>5</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt|501]]</center>||Updated content from CA 2006-07||[http://mdotwiki.state.mi.us/construction/index.php?title=501_-_Plant_Produced_Hot_Mix_Asphalt&diff=4614&oldid=4250 Compare It]
+
|<center>3/13/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Added Strain Poles to Typical Long-Lead Items table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5514&oldid=5510 Compare It]
 
|-
 
|-
|<center>4/20/2017</center>||<center>5</center>||<center>[[502_-_HMA_Crack_Treatment#GENERAL|502]]</center>||Added update from CA 2009-03 to CM||[http://mdotwiki.state.mi.us/construction/index.php?title=502_-_HMA_Crack_Treatment&diff=4611&oldid=3361 Compare It]
+
|<center>1/22/2019</center>||<center>7</center>||<center>[[718_-_Drilled_Shafts|718]]</center>||Provided clarification relating to [[718_-_Drilled_Shafts#Tremie_Tube_Concrete_Placement|Tremie Tube Concrete Placement]] along with inspection of shaft after [[718_-_Drilled_Shafts#Placing_Steel_Reinforcement|Placing Steel Reinforcement]] cage||[http://mdotwiki.state.mi.us/construction/index.php?title=718_-_Drilled_Shafts&diff=5487&oldid=4248 Compare It]
 
|-
 
|-
|<center>4/19/2017</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs#Review_Procedure|Cert Programs]]</center>||Added text from CA 2014-03||[http://mdotwiki.state.mi.us/construction/index.php?title=Certification_Programs&diff=4607&oldid=4311 Compare It]
+
|<center>1/16/2019</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions#Small_Tools|109.05]]</center>||Clarification related to small tools for Force Account Work||[http://mdotwiki.state.mi.us/construction/index.php?title=109.05_Payment_for_Contract_Revisions&diff=5453&oldid=4945 Compare It]
|-
 
|<center>4/5/2017</center>||<center>6</center>||<center>[[603_-_Concrete_Pavement_Restoration#Removing Old Concrete|603]]</center>||Added text update from CA 2013-09||[http://mdotwiki.state.mi.us/construction/index.php?title=603_-_Concrete_Pavement_Restoration&diff=4429&oldid=4017 Compare It]
 
 
|-
 
|-
|<center>3/28/2017</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Marked_Plans|109.07]]</center>||Added links from CA 2009-20||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Marked_Plans View Here]
+
|<center>12/3/2018</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs|Certification Programs]]</center>||Updated Engineer Record Certification List||[http://mdotwiki.state.mi.us/construction/index.php/File:Eng_Record_Cert_list_12-03-18.pdf View Here]
|-
 
|<center>3/27/2017</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions#DOCUMENTING_PRICE_NEGOTIATIONS|109.05]]</center>||Updated reference to CFR and included link||[http://mdotwiki.state.mi.us/construction/index.php/109.05_Payment_for_Contract_Revisions#DOCUMENTING_PRICE_NEGOTIATIONS View Here]
 
 
|}
 
|}
 
</div>
 
</div>
 +
 +
{{top}}
 +
 +
=[[#Preamble|Preamble]]=
 +
 +
This manual provides guidance to administrative, engineering, and technical staff.  Engineering practice requires that professionals use a combination of technical skills and judgment in decision making.  Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare.  This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary.  Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials.  As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public.  It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed.  It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise.  MDOT Leadership is committed to a culture of innovation to optimize engineering solutions.
 +
The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons.  Those canons are provided below.
 +
Engineers, in the fulfillment of their professional duties, shall:
 +
::#Hold paramount the safety, health, and welfare of the public.
 +
::#Perform Services only in areas of their competence.
 +
::#Issue public statement only in an objective and truthful manner.
 +
::#Act for each employer or client as faithful agents or trustees.
 +
::#Avoid deceptive acts.
 +
::#Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession.
 +
 +
 +
This manual has been revised throughout to incorporate changes brought about by the release of the 2012 Standard Specifications for Construction and by progress in equipment, construction practices, and materials. The format has been established to follow the standard specification outline with divisions and sections set up to facilitate revision and addition of new information as needed.
 +
 +
 +
Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the [[Help:Contents]] page.
 +
 +
 
{{top}}
 
{{top}}
 
[[Category:Construction Manual]]
 
[[Category:Construction Manual]]

Revision as of 10:49, 4 October 2019

www.michigan.gov/mdot


CONSTRUCTION MANUAL


Logo.jpg


Bureau of Field Services
Construction Field Services Division

Box culvert construction on M-10 in Clare County.

MDOT Mission Statement

Providing the highest quality integrated transportation services for economic benefit and improved quality of life.


Current News

Documentation Guide

The NEW Documentation Guide is now available to replace the former "Minimum Documentation Guide" content (Updated July 2019). A link to the new "Documentation Guide" has been established in the Side Bar to the left. It can also be accessed by clicking on the thumbnail below.

Documentation Guide Final Draft 07-29-19.pdf

[top of page]


Recent Major Changes

The table below is a list of Major changes.

Updated Division Section Summary What Changed
9/26/2019
1
105
2019 Summary of revisions to the Materials Quality Assurance Procedures Manual Compare It
9/26/2019
8
811
Permanent Pavement Markings Field Inspection and Processing of Progress Payments: Updated new content Compare It
9/18/2019
6
602
Load Transfer Assemblies: Updated new content and included Presentation for Load Transfer Assemblies Inspections Compare It
9/18/2018
8
811
Updated Paint pricing for 2019 View Updated Table Here
8/30/2019
1
102
Update to Trunkline Boilerplate Preconstruction Meeting Minutes - 2019 View Here
8/20/2019
1 Supplemental
FieldManager
New guidance related to the Standard Rounding Convention Compare It
7/31/2019
Main Page
Main Page
July update to the Documentation Guide which includes corrections related to density requirements. It also includes updated language related to the "e-Final Project Review Procedures" View Here
6/26/2019
1
109
Updated: Final Project Review Procedures to the new "e-Final Project Review Procedures" Compare It
5/28/2019
1
102.02
Updated to Boilerplate Progress Clause Template Compare It
4/9/2019
1
103.02
Updates and clarifications related to Detailed Contract Modification Information area as well as the Design Issue/Premium Costs area related to Contract Revisions Compare It
3/19/2019
1
103.02
Provided link to current Local Agency Programs Section Federal Guidelines Compare It
3/19/2019
1
102
Preconstruction Meeting Minutes Boilerplate - Local Agency Compare It
3/6/2019
1
102.02
Removed old production rate information and replaced with new .xlsx file containing updated production rate information Compare It
2/28/2019
Main Page
Main Page
New Documentation Guide is now available to replace former "Minimum Documentation Guide" content. Link to the "Documentation Guide" also established in Side Bar to the left. View Here
1/10/2019
1
104.10
Updated Contractor Claims Procedure for 2019 View Here
12/12/2018
1
102.02
Updated Boilerplate Progress Clause Template View Here
11/7/2018
1
102
Preconstruction Meeting Minutes Boilerplate - Trunkline Compare It
10/26/2018
8
811
Updated Paint pricing for 2018 View Updated Table Here

A definition to the types of changes that you might see in the Construction Manual can be found under Content Revision Procedures, Types of Changes.

[top of page]


Recent Minor Changes

The table below is a list of Minor changes.

Updated Division Section Summary What Changed
10/3/2019
8
811
Removal of references to outdated paint marking turn arrows Compare It
8/22/2019
1
107.09
Update related to the process for archeological findings Compare It
7/11/2019
2
208
Added 2 flowcharts for Notice of Coverage (NOC) and Notice of Termination (NOT) in section 208 between “Notification” and “Training”. Also updated language to reflect recent name change of the "Michigan Department of Environmental Quality (MDEQ)" to the "Michigan Department of Environment, Great Lakes, and Energy (EGLE)" Compare It
6/25/2019
1
107.19
Removed Hauling Route Permit Guidance Compare It
6/20/2019
E-Construction
Standard Naming Convention for Documents
Updated Naming Convention Table to reflect recent changes. Compare It
6/17/2019
1 Supplemental
Certification Programs
Updated Engineer Record Certification List View Here
5/20/2019
1
102.02
Added Barrier Gates and Work Zone Speed Trailers to "Typical Long-Lead Items" table Compare It
4/17/2019
1
102.02
Minor update to heading of Column 2 for Typical Long-Lead Items Compare It
4/1/2019
1
102.02
Added Delineator and 3# U-Channel Posts to Typical Long-Lead Items table Compare It
3/14/2019
7
715
Updated content related to: Health and Safety, Respiratory Protection and Protective Equipment, Medical Surveillance, Exposure Monitoring, Hygiene Facilities, and Lead Awareness Training Compare It
3/13/2019
1
102.02
Added Strain Poles to Typical Long-Lead Items table Compare It
1/22/2019
7
718
Provided clarification relating to Tremie Tube Concrete Placement along with inspection of shaft after Placing Steel Reinforcement cage Compare It
1/16/2019
1
109.05
Clarification related to small tools for Force Account Work Compare It
12/3/2018
1 Supplemental
Certification Programs
Updated Engineer Record Certification List View Here

[top of page]


Preamble

This manual provides guidance to administrative, engineering, and technical staff. Engineering practice requires that professionals use a combination of technical skills and judgment in decision making. Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare. This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary. Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials. As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public. It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed. It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise. MDOT Leadership is committed to a culture of innovation to optimize engineering solutions. The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons. Those canons are provided below. Engineers, in the fulfillment of their professional duties, shall:

  1. Hold paramount the safety, health, and welfare of the public.
  2. Perform Services only in areas of their competence.
  3. Issue public statement only in an objective and truthful manner.
  4. Act for each employer or client as faithful agents or trustees.
  5. Avoid deceptive acts.
  6. Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession.


This manual has been revised throughout to incorporate changes brought about by the release of the 2012 Standard Specifications for Construction and by progress in equipment, construction practices, and materials. The format has been established to follow the standard specification outline with divisions and sections set up to facilitate revision and addition of new information as needed.


Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the Help:Contents page.


[top of page]