Difference between revisions of "Main Page"

From MediaWiki
Jump to navigation Jump to search
m (→‎Recent Minor Changes: Fixed 4/22/20 update. Link placed on 102.18 instead of 109.08.)
(→‎Recent Major Changes: Updated content for the Project & Worksite Safety subsection of 104.07)
(27 intermediate revisions by 2 users not shown)
Line 23: Line 23:
 
=[[Current News|<font color="red">Current News</font>]]=
 
=[[Current News|<font color="red">Current News</font>]]=
  
==[[#Documentation Guide|Documentation Guide]]==
+
==[[#New FieldManager Helpdesk Number|New FieldManager Helpdesk Number]]==
The NEW Documentation Guide is now available to replace the former "Minimum Documentation Guide" content (Updated July 2019). A link to the new "Documentation Guide" has been established in the Side Bar to the left. It can also be accessed by clicking on the thumbnail below.
+
The FieldManager Helpdesk activated its new phone number, '''1-844-4MI-MDOT''' (1-844-464-6368). On the new phone menu, you can reach the FieldManager Helpdesk by selecting option 2 for AASHTOWare and then option 3 for FieldManager. The old number was deactivated on May 1st. The new number is part of the new unified help desk solution, MI MDOT Software Support, used to track and resolve software related issues from customers.
 
+
[[File:MI MDOT Software Support.png|center|200px]]
[[File:Documentation Guide Final Draft 07-29-19.pdf|thumb|center|200px|link=//{{SERVERNAME}}/images_construction/6/6a/Documentation_Guide_Final_Draft_07-29-19.pdf]]
 
  
 
{{top}}
 
{{top}}
Line 35: Line 34:
 
{| class="wikitable" style="background:orange; color:black"
 
{| class="wikitable" style="background:orange; color:black"
 
!Updated!! Division !! Section !! Summary !! What Changed
 
!Updated!! Division !! Section !! Summary !! What Changed
 +
|-
 +
|<center>6/30/2020</center>||<center>1 Supplemental</center>||<center>[[104.07_Contractor_Obligations#Project_.26_Worksite_Safety|104.07]]</center>||Updated content for the Project & Worksite Safety subsection||[http://mdotwiki.state.mi.us/construction/index.php?title=104.07_Contractor_Obligations&action=historysubmit&diff=5871&oldid=5826 Compare Here]
 +
|-
 +
|<center>6/30/2020</center>||<center>1 Supplemental</center>||<center>[[FPR_Frequently_Asked_Questions|FPR Frequently Asked Questions]]</center>||Created a new FPR Frequently Asked Questions page||[http://mdotwiki.state.mi.us/construction/index.php/FPR_Frequently_Asked_Questions View Here]
 +
|-
 +
|<center>6/25/2020</center>||<center>1 Supplemental</center>||<center>[[FHWA_CAP_Action_Plans|FHWA CAP Action Plans]]</center>||Created a new FHWA CAP Action Plans page to address IDR issues||[http://mdotwiki.state.mi.us/construction/index.php/FHWA_CAP_Action_Plans View Here]
 +
|-
 +
|<center>6/24/2020</center>||<center>1 Supplemental</center>||<center>[[Final_Project_Review_Report|Final Project Review Report]]</center>||Created a new Final Project Review Report page||[http://mdotwiki.state.mi.us/construction/index.php/Final_Project_Review_Report View Here]
 +
|-
 +
|<center>6/9/2020</center>||<center>1 Supplemental</center>||<center>[[Interim_File_Review|Interim File Review]]</center>||Created a new Interim File Review page||[http://mdotwiki.state.mi.us/construction/index.php/Interim_File_Review View Here]
 +
|-
 +
|<center>5/13/2020</center>||<center>1 Supplemental</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment|109.07]]</center>||Removed the e-File Project Review Procedures from Section 109.07||[http://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&diff=5812&oldid=5776 Compare Here]
 +
|-
 +
|<center>5/13/2020</center>||<center>1 Supplemental</center>||<center>[[Letter_to_File|Letter to File]]</center>||Created a new Letter to File page||[http://mdotwiki.state.mi.us/construction/index.php/Letter_to_File View Here]
 +
|-
 +
|<center>5/13/2020</center>||<center>1 Supplemental</center>||<center>[[Project_Closeout_Escalation_of_Accountability|Project Closeout Escalation of Accountability]]</center>||Created a new Project Closeout Escalation of Accountability page||[http://mdotwiki.state.mi.us/construction/index.php/Project_Closeout_Escalation_of_Accountability View Here]
 +
|-
 +
|<center>5/12/2020</center>||<center>1 Supplemental</center>||<center>[[Final_Project_Review|Final Project Review]]</center>||Created a new Final Project Review page||[http://mdotwiki.state.mi.us/construction/index.php/Final_Project_Review View Here]
 +
|-
 +
|<center>4/28/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Created new Certified Engineer Process page||[http://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process View Here]
 
|-
 
|-
 
|<center>4/21/2020</center>||<center>1</center>||<center>[[109.08_Prompt_Payment|109.08]]</center>||Created new Prompt Payment section with flow chart ||[http://mdotwiki.state.mi.us/construction/index.php/109.08_Prompt_Payment View Here]
 
|<center>4/21/2020</center>||<center>1</center>||<center>[[109.08_Prompt_Payment|109.08]]</center>||Created new Prompt Payment section with flow chart ||[http://mdotwiki.state.mi.us/construction/index.php/109.08_Prompt_Payment View Here]
Line 61: Line 80:
 
|-
 
|-
 
|<center>7/31/2019</center>||<center>Main Page</center>||<center>Main Page</center>||July update to the Documentation Guide which includes corrections related to density requirements. It also includes updated language related to the [//{{SERVERNAME}}/images_construction/6/6a/Documentation_Guide_Final_Draft_07-29-19.pdf#page=3 "e-Final Project Review Procedures"]||[//{{SERVERNAME}}/images_construction/6/6a/Documentation_Guide_Final_Draft_07-29-19.pdf View Here]
 
|<center>7/31/2019</center>||<center>Main Page</center>||<center>Main Page</center>||July update to the Documentation Guide which includes corrections related to density requirements. It also includes updated language related to the [//{{SERVERNAME}}/images_construction/6/6a/Documentation_Guide_Final_Draft_07-29-19.pdf#page=3 "e-Final Project Review Procedures"]||[//{{SERVERNAME}}/images_construction/6/6a/Documentation_Guide_Final_Draft_07-29-19.pdf View Here]
|-
 
|<center>6/26/2019</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment|109]]</center>||Updated: Final Project Review Procedures to the new [[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#e-Final_Project_Review_Procedures|"e-Final Project Review Procedures"]]||[http://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&diff=5578&oldid=5538 Compare It]
 
|-
 
|<center>5/28/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause|102.02]]</center>||Updated to Boilerplate Progress Clause Template||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5567&oldid=5553 Compare It]
 
|-
 
|<center>4/9/2019</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Detailed_Contract_Modification_Information|103.02]]</center>||Updates and clarifications related to [[103.02_Contract_Revisions#Detailed_Contract_Modification_Information|Detailed Contract Modification Information]] area as well as the [[103.02_Contract_Revisions#Design_Issues.2FPremium_Costs|Design Issue/Premium Costs]] area related to Contract Revisions||[http://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&diff=5534&oldid=5521 Compare It]
 
|-
 
|<center>3/19/2019</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Local_Agency_Projects|103.02]]</center>||[https://www.michigan.gov/documents/mdot_federal_Guidelines_99105_7.pdf Provided link to current Local Agency Programs Section Federal Guidelines]||[http://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&diff=5521&oldid=5256 Compare It]
 
|-
 
|<center>3/19/2019</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||[http://mdotwiki.state.mi.us/construction/index.php/File:LOCAL_AGENCY_Boilerplate_Preconstruction_Meeting_Minutes_-_March_2019.docx Preconstruction Meeting Minutes Boilerplate - Local Agency]||[http://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting&diff=5519&oldid=5406 Compare It]
 
|-
 
|<center>3/6/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal#Construction_Time_Estimates_-_Production_Rates|102.02]]</center>||Removed old production rate information and replaced with [http://mdotwiki.state.mi.us/construction/index.php/File:MDOT_Production_Rates_.xlsx new .xlsx file containing updated production rate information]||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5510&oldid=5439 Compare It]
 
|-
 
|<center>2/28/2019</center>||<center>Main Page</center>||<center>Main Page</center>||New Documentation Guide is now available to replace former "Minimum Documentation Guide" content. Link to the "Documentation Guide" also established in Side Bar to the left. ||[//{{SERVERNAME}}/images_construction/0/0d/Documentation_Guide_Final_Draft_02-25-19.pdf View Here]
 
|-
 
|<center>1/10/2019</center>||<center>1</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension|104.10]]</center>||Updated Contractor Claims Procedure for 2019||[http://mdotwiki.state.mi.us/construction/index.php?title=File:MDOT_Construction_Contractor_Claims_Procedure_January_2019.pdf&page=1 View Here]
 
 
|-
 
|-
 
|}
 
|}
Line 91: Line 94:
 
!Updated!! Division !! Section !! Summary !! What Changed
 
!Updated!! Division !! Section !! Summary !! What Changed
 
|-
 
|-
|<center>4/22/2020</center>||<center>1</center>||<center>[[102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_(DBEs)#Prompt_Payment| 102.18]]</center>||Added the newly created Prompt Payment link to Section 102.18
+
|<center>6/30/2020</center>||<center>1 Supplemental</center>||<center>[[FPR_Frequently_Asked_Questions#How_is_the_Final_Project_Review_Report_updated.3F|FPR Frequently Asked Questions]]</center>||Added FPR Report User Guide link to FPR FAQ page||[http://mdotwiki.state.mi.us/construction/index.php?title=FPR_Frequently_Asked_Questions&diff=5868&oldid=5867 Compare Here]
||[http://mdotwiki.state.mi.us/construction/index.php?title=102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_%28DBEs%29&diff=5757&oldid=5164 Compare Here]
+
|-
 +
|<center>6/30/2020</center>||<center>1 Supplemental</center>||<center>[[Final_Project_Review|Final Project Review]]</center>||Added FAQs link for Final Project Review to page||[http://mdotwiki.state.mi.us/construction/index.php?title=Final_Project_Review&diff=5859&oldid=5849 Compare Here]
 +
|-
 +
|<center>6/24/2020</center>||<center>1 Supplemental</center>||<center>[[Project_Closeout_Escalation_of_Accountability|Project Closeout Escalation of Accountability]]</center>||Added links to the new Final Project Review Report page||[http://mdotwiki.state.mi.us/construction/index.php?title=Project_Closeout_Escalation_of_Accountability&diff=5845&oldid=5815 Compare Here]
 +
|-
 +
|<center>6/17/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Reformatted the Certified Engineer Renewal Process for clarity||[http://mdotwiki.state.mi.us/construction/index.php?title=Certified_Engineer_Process&diff=5841&oldid=5840 Compare Here]
 +
|-
 +
|<center>6/9/2020</center>||<center>1 Supplemental</center>||<center>[[Final_Project_Review|Final Project Review]]</center>||Updated Final Project Review page with Interim File Review link||[http://mdotwiki.state.mi.us/construction/index.php?title=Final_Project_Review&diff=5831&oldid=5813 Compare Here]
 +
|-
 +
|<center>06/01/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certification Programs]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/e/e7/Eng_Record_Cert_list_06-01-2020.pdf View Here]
 +
|-
 +
|<center>5/1/2020</center>||<center>1 Supplemental</center>||<center>[[Dispute_Review_Board_(DRB)| Dispute Review Board (DRB)]]</center>||Added updated DRB Procedures to include those let on and after 6-5-2020/Removed older links||[http://mdotwiki.state.mi.us/construction/index.php?title=Dispute_Review_Board_%28DRB%29&diff=5792&oldid=5137 Compare Here]
 +
|-
 +
|<center>4/30/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Office_Technician_Process| Certified Office Technician Process]]</center>||Edited page to reflect only Certified Technician Process information||[http://mdotwiki.state.mi.us/construction/index.php?title=Certified_Office_Technician_Process&diff=5787&oldid=5720 Compare Here]
 +
|-
 +
|<center>4/29/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Non-Payment_Claims| 109.07]]</center>||Removed "Review of Prompt Payment Complaints" section as it's now its own page||[http://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&diff=5776&oldid=5730 Compare Here]
 +
|-
 +
|<center>4/27/2020</center>||<center>1</center>||<center>[[101.04_-_Inspector%27s_Daily_Reports|101.04 Inspector Daily Reports]]<hr>[[FieldManager|FieldManager]]</center>||Updated Helpdesk number from 517-322-1556 to '''1-844-4MI-MDOT''' (1-844-464-6368) in these sections along with the Main page [http://mdotwiki.state.mi.us/construction/index.php/Main_Page#New_FieldManager_Helpdesk_Number Current News] area above
 +
||[http://mdotwiki.state.mi.us/construction/index.php?title=101.04_-_Inspector%27s_Daily_Reports&diff=5765&oldid=1534 Compare Here]<hr>[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=5764&oldid=5713 Compare Here]
 +
|-
 +
|<center>4/22/2020</center>||<center>1</center>||<center>[[102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_(DBEs)#Prompt_Payment| 102.18]]</center>||Added the newly created Prompt Payment link to Section 102.18||[http://mdotwiki.state.mi.us/construction/index.php?title=102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_%28DBEs%29&diff=5757&oldid=5164 Compare Here]
 
|-
 
|-
 
|<center>4/15/2020</center>||<center>1</center>||<center>[[105.01_Quality_and_Scope_of_Supply| 105.01]]</center>||Changed Density Control Manual to Density Testing and Inspection Manual||[http://mdotwiki.state.mi.us/construction/index.php?title=105.01_Quality_and_Scope_of_Supply&diff=5747&oldid=5745 Compare Here]
 
|<center>4/15/2020</center>||<center>1</center>||<center>[[105.01_Quality_and_Scope_of_Supply| 105.01]]</center>||Changed Density Control Manual to Density Testing and Inspection Manual||[http://mdotwiki.state.mi.us/construction/index.php?title=105.01_Quality_and_Scope_of_Supply&diff=5747&oldid=5745 Compare Here]
Line 108: Line 131:
 
|<center>2/13/2020</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|E-Construction]]</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|Standard Naming Convention for Documents]]</center>||Updated Naming Convention Table to reflect recent changes. Also included updated [//{{SERVERNAME}}/images_construction/d/d5/Standard_Naming_Convention_Revised_2-13-20.pdf PDF] and [//{{SERVERNAME}}/images_construction/a/a1/Standard_Naming_Convention_Revised_2-13-20.xlsx XLSX] files (Rev 2-13-20)||[http://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&diff=5726&oldid=5576 Compare It]
 
|<center>2/13/2020</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|E-Construction]]</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|Standard Naming Convention for Documents]]</center>||Updated Naming Convention Table to reflect recent changes. Also included updated [//{{SERVERNAME}}/images_construction/d/d5/Standard_Naming_Convention_Revised_2-13-20.pdf PDF] and [//{{SERVERNAME}}/images_construction/a/a1/Standard_Naming_Convention_Revised_2-13-20.xlsx XLSX] files (Rev 2-13-20)||[http://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&diff=5726&oldid=5576 Compare It]
 
|-
 
|-
|<center>02/13/2020</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs|Certification Programs]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/7/7a/Eng_Record_Cert_list_02-13-2020.pdf View Here]
+
|<center>02/13/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/7/7a/Eng_Record_Cert_list_02-13-2020.pdf View Here]
 
|-
 
|-
 
|<center>01/22/2020</center>||<center>Prevailing Wage Oversight Procedures</center>||<center>[[Prevailing_Wage_Oversight_Procedures#JOBSITE_POSTING| Jobsite Posting]]</center>||Updated contact information on the Title VI Poster and Coordinator site information||[http://mdotwiki.state.mi.us/construction/index.php?title=Prevailing_Wage_Oversight_Procedures&diff=5703&oldid=5036 Compare It]
 
|<center>01/22/2020</center>||<center>Prevailing Wage Oversight Procedures</center>||<center>[[Prevailing_Wage_Oversight_Procedures#JOBSITE_POSTING| Jobsite Posting]]</center>||Updated contact information on the Title VI Poster and Coordinator site information||[http://mdotwiki.state.mi.us/construction/index.php?title=Prevailing_Wage_Oversight_Procedures&diff=5703&oldid=5036 Compare It]
Line 116: Line 139:
 
|<center>10/29/2019</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges#Eligibility_and_Use|Indirect Testing Charges - Eligibility and Use]]</center>||Updated first bullet information for clarity and to include examples||[http://mdotwiki.state.mi.us/construction/index.php?title=Construction_Field_Services_Indirect_Testing_Charges&diff=5659&oldid=5654 Compare It]
 
|<center>10/29/2019</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges#Eligibility_and_Use|Indirect Testing Charges - Eligibility and Use]]</center>||Updated first bullet information for clarity and to include examples||[http://mdotwiki.state.mi.us/construction/index.php?title=Construction_Field_Services_Indirect_Testing_Charges&diff=5659&oldid=5654 Compare It]
 
|-
 
|-
|<center>10/28/2019</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs|Certification Programs]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/4/45/Eng_Record_Cert_list_10-23-19.pdf View Here]
+
|<center>10/28/2019</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/4/45/Eng_Record_Cert_list_10-23-19.pdf View Here]
 
|-
 
|-
 
|<center>10/3/2019</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Pavement_Marking_Turn_Arrows|811]]</center>||Removal of references to outdated paint marking turn arrows||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=5647&oldid=5640 Compare It]
 
|<center>10/3/2019</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Pavement_Marking_Turn_Arrows|811]]</center>||Removal of references to outdated paint marking turn arrows||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=5647&oldid=5640 Compare It]
Line 123: Line 146:
 
|-
 
|-
 
|<center>7/11/2019</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208]]</center>||Added 2 flowcharts for Notice of Coverage (NOC) and Notice of Termination (NOT) in section 208 between “Notification” and “Training”. Also updated language to reflect recent name change of the "Michigan Department of Environmental Quality (MDEQ)" to the "Michigan Department of Environment, Great Lakes, and Energy (EGLE)"||[http://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&diff=5586&oldid=5241 Compare It]
 
|<center>7/11/2019</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208]]</center>||Added 2 flowcharts for Notice of Coverage (NOC) and Notice of Termination (NOT) in section 208 between “Notification” and “Training”. Also updated language to reflect recent name change of the "Michigan Department of Environmental Quality (MDEQ)" to the "Michigan Department of Environment, Great Lakes, and Energy (EGLE)"||[http://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&diff=5586&oldid=5241 Compare It]
|-
 
|<center>6/25/2019</center>||<center>1</center>||<center>[[107.19_Hauling_on_Local_Roads_and_Streets#Hauling_on_Local_Roads_and_Streets|107.19]]</center>||Removed Hauling Route Permit Guidance||[http://mdotwiki.state.mi.us/construction/index.php?title=107.19_Hauling_on_Local_Roads_and_Streets&diff=5577&oldid=4936 Compare It]
 
|-
 
|<center>6/20/2019</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|E-Construction]]</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|Standard Naming Convention for Documents]]</center>||Updated Naming Convention Table to reflect recent changes.||[http://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&diff=5574&oldid=5563 Compare It]
 
|-
 
|<center>6/17/2019</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs|Certification Programs]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/a/af/Eng_Record_Cert_list_06-17-19.pdf View Here]
 
|-
 
|<center>5/20/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Added Barrier Gates and Work Zone Speed Trailers to "Typical Long-Lead Items" table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5553&oldid=5539 Compare It]
 
|-
 
|<center>4/17/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Minor update to heading of Column 2 for Typical Long-Lead Items||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5539&oldid=5526 Compare It]
 
|-
 
|<center>4/1/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Added Delineator and 3# U-Channel Posts to Typical Long-Lead Items table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5526&oldid=5523 Compare It]
 
|-
 
|<center>3/14/2019</center>||<center>7</center>||<center>[[715_-_Cleaning_and_Coating_Existing_Structural_Steel#Health_and_Safety|715]]</center>||Updated content related to: Health and Safety, Respiratory Protection and Protective Equipment, Medical Surveillance, Exposure Monitoring, Hygiene Facilities, and Lead Awareness Training||[http://mdotwiki.state.mi.us/construction/index.php?title=715_-_Cleaning_and_Coating_Existing_Structural_Steel&diff=5516&oldid=5480 Compare It]
 
|-
 
|<center>3/13/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Added Strain Poles to Typical Long-Lead Items table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5514&oldid=5510 Compare It]
 
|-
 
|<center>1/22/2019</center>||<center>7</center>||<center>[[718_-_Drilled_Shafts|718]]</center>||Provided clarification relating to [[718_-_Drilled_Shafts#Tremie_Tube_Concrete_Placement|Tremie Tube Concrete Placement]] along with inspection of shaft after [[718_-_Drilled_Shafts#Placing_Steel_Reinforcement|Placing Steel Reinforcement]] cage||[http://mdotwiki.state.mi.us/construction/index.php?title=718_-_Drilled_Shafts&diff=5487&oldid=4248 Compare It]
 
|-
 
|<center>1/16/2019</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions#Small_Tools|109.05]]</center>||Clarification related to small tools for Force Account Work||[http://mdotwiki.state.mi.us/construction/index.php?title=109.05_Payment_for_Contract_Revisions&diff=5453&oldid=4945 Compare It]
 
 
|-
 
|-
 
|}
 
|}

Revision as of 16:22, 30 June 2020

www.michigan.gov/mdot


CONSTRUCTION MANUAL


Logo.jpg


Bureau of Field Services
Construction Field Services Division

Box culvert construction on M-10 in Clare County.

MDOT Mission Statement

Providing the highest quality integrated transportation services for economic benefit and improved quality of life.


Current News

New FieldManager Helpdesk Number

The FieldManager Helpdesk activated its new phone number, 1-844-4MI-MDOT (1-844-464-6368). On the new phone menu, you can reach the FieldManager Helpdesk by selecting option 2 for AASHTOWare and then option 3 for FieldManager. The old number was deactivated on May 1st. The new number is part of the new unified help desk solution, MI MDOT Software Support, used to track and resolve software related issues from customers.

MI MDOT Software Support.png

[top of page]


Recent Major Changes

The table below is a list of Major changes.

Updated Division Section Summary What Changed
6/30/2020
1 Supplemental
104.07
Updated content for the Project & Worksite Safety subsection Compare Here
6/30/2020
1 Supplemental
FPR Frequently Asked Questions
Created a new FPR Frequently Asked Questions page View Here
6/25/2020
1 Supplemental
FHWA CAP Action Plans
Created a new FHWA CAP Action Plans page to address IDR issues View Here
6/24/2020
1 Supplemental
Final Project Review Report
Created a new Final Project Review Report page View Here
6/9/2020
1 Supplemental
Interim File Review
Created a new Interim File Review page View Here
5/13/2020
1 Supplemental
109.07
Removed the e-File Project Review Procedures from Section 109.07 Compare Here
5/13/2020
1 Supplemental
Letter to File
Created a new Letter to File page View Here
5/13/2020
1 Supplemental
Project Closeout Escalation of Accountability
Created a new Project Closeout Escalation of Accountability page View Here
5/12/2020
1 Supplemental
Final Project Review
Created a new Final Project Review page View Here
4/28/2020
1 Supplemental
Certified Engineer Process
Created new Certified Engineer Process page View Here
4/21/2020
1
109.08
Created new Prompt Payment section with flow chart View Here
2/12/2020
1
102.02
Updated to Boilerplate Progress Clause Template (Revision 2/10/2020) Compare It
01/23/2020
1
104.07
Update to Worker Visibility information and photos Compare It
01/21/2020
1
102
Update to Local Agency Boilerplate Preconstruction Meeting Minutes - January 2020 View Here
01/21/2020
2
208
Update for entire Soil Erosion and Sedimentation Control (NPDES) section Compare It
10/22/2019
1 Supplemental
Construction Field Services Indirect Testing Charges
Update for FY 2020 Indirect Testing Coding Compare It
9/26/2019
1
105
2019 Summary of revisions to the Materials Quality Assurance Procedures Manual Compare It
9/26/2019
8
811
Permanent Pavement Markings Field Inspection and Processing of Progress Payments: Updated new content Compare It
9/18/2019
6
602
Load Transfer Assemblies: Updated new content and included Presentation for Load Transfer Assemblies Inspections Compare It
9/18/2018
8
811
Updated Paint pricing for 2019 View Updated Table Here
8/30/2019
1
102
Update to Trunkline Boilerplate Preconstruction Meeting Minutes - 2019 View Here
8/20/2019
1 Supplemental
FieldManager
New guidance related to the Standard Rounding Convention Compare It
7/31/2019
Main Page
Main Page
July update to the Documentation Guide which includes corrections related to density requirements. It also includes updated language related to the "e-Final Project Review Procedures" View Here

A definition to the types of changes that you might see in the Construction Manual can be found under Content Revision Procedures, Types of Changes.

[top of page]


Recent Minor Changes

The table below is a list of Minor changes.

Updated Division Section Summary What Changed
6/30/2020
1 Supplemental
FPR Frequently Asked Questions
Added FPR Report User Guide link to FPR FAQ page Compare Here
6/30/2020
1 Supplemental
Final Project Review
Added FAQs link for Final Project Review to page Compare Here
6/24/2020
1 Supplemental
Project Closeout Escalation of Accountability
Added links to the new Final Project Review Report page Compare Here
6/17/2020
1 Supplemental
Certified Engineer Process
Reformatted the Certified Engineer Renewal Process for clarity Compare Here
6/9/2020
1 Supplemental
Final Project Review
Updated Final Project Review page with Interim File Review link Compare Here
06/01/2020
1 Supplemental
Certification Programs
Updated Engineer Record Certification List View Here
5/1/2020
1 Supplemental
Dispute Review Board (DRB)
Added updated DRB Procedures to include those let on and after 6-5-2020/Removed older links Compare Here
4/30/2020
1 Supplemental
Certified Office Technician Process
Edited page to reflect only Certified Technician Process information Compare Here
4/29/2020
1
109.07
Removed "Review of Prompt Payment Complaints" section as it's now its own page Compare Here
4/27/2020
1
101.04 Inspector Daily Reports
FieldManager
Updated Helpdesk number from 517-322-1556 to 1-844-4MI-MDOT (1-844-464-6368) in these sections along with the Main page Current News area above Compare Here
Compare Here
4/22/2020
1
102.18
Added the newly created Prompt Payment link to Section 102.18 Compare Here
4/15/2020
1
105.01
Changed Density Control Manual to Density Testing and Inspection Manual Compare Here
4/14/2020
1
105.01
Changed Density Control Handbook to Density Control Manual Compare Here
3/30/2020
1
107
Updated Jobsite Poster View Here
3/20/2020
1
105
Deleted information no longer applicable, or is covered in other documents/Renamed section due to changes Compare It
3/18/2020
1
108.01
Updated links to the new 1302-Fed form. Compare Here
2/21/2020
1
103.02
General Contract Modification Information Format Revision Compare It
2/13/2020
E-Construction
Standard Naming Convention for Documents
Updated Naming Convention Table to reflect recent changes. Also included updated PDF and XLSX files (Rev 2-13-20) Compare It
02/13/2020
1 Supplemental
Certified Engineer Process
Updated Engineer Record Certification List View Here
01/22/2020
Prevailing Wage Oversight Procedures
Jobsite Posting
Updated contact information on the Title VI Poster and Coordinator site information Compare It
11/12/2019
2
208
Soil Erosion and Sedimentation Control Notifications: Updated Notice of Coverage (NOC) and Notice of Termination (NOT) charts Compare It
10/29/2019
1 Supplemental
Indirect Testing Charges - Eligibility and Use
Updated first bullet information for clarity and to include examples Compare It
10/28/2019
1 Supplemental
Certified Engineer Process
Updated Engineer Record Certification List View Here
10/3/2019
8
811
Removal of references to outdated paint marking turn arrows Compare It
8/22/2019
1
107.09
Update related to the process for archeological findings Compare It
7/11/2019
2
208
Added 2 flowcharts for Notice of Coverage (NOC) and Notice of Termination (NOT) in section 208 between “Notification” and “Training”. Also updated language to reflect recent name change of the "Michigan Department of Environmental Quality (MDEQ)" to the "Michigan Department of Environment, Great Lakes, and Energy (EGLE)" Compare It

[top of page]


Preamble

This manual provides guidance to administrative, engineering, and technical staff. Engineering practice requires that professionals use a combination of technical skills and judgment in decision making. Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare. This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary. Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials. As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public. It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed. It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise. MDOT Leadership is committed to a culture of innovation to optimize engineering solutions. The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons. Those canons are provided below. Engineers, in the fulfillment of their professional duties, shall:

  1. Hold paramount the safety, health, and welfare of the public.
  2. Perform Services only in areas of their competence.
  3. Issue public statement only in an objective and truthful manner.
  4. Act for each employer or client as faithful agents or trustees.
  5. Avoid deceptive acts.
  6. Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession.


This manual has been revised throughout to incorporate changes brought about by the release of the 2012 Standard Specifications for Construction and by progress in equipment, construction practices, and materials. The format has been established to follow the standard specification outline with divisions and sections set up to facilitate revision and addition of new information as needed.


Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the Help:Contents page.


[top of page]