Difference between revisions of "Main Page"

From MediaWiki
Jump to navigation Jump to search
m (→‎Recent Minor Changes: Clarification to recent update for Delineator and 3# U-Channel Posts)
(→‎Recent Major Changes: Updated with Div. 7, section 700 - Closure of Unsafe Structures)
(113 intermediate revisions by 3 users not shown)
Line 2: Line 2:
  
  
<center><span STYLE="font: 40pt arial;">'''CONSTRUCTION MANUAL'''</span></center>
+
<center><span STYLE="font: 25pt arial;">'''CONSTRUCTION MANUAL'''</span></center>
  
  
<center>[[File:logo.jpg|400px]]</center>
+
<center>[[File:logo.jpg|250px]]</center>
  
  
  
<center><span STYLE="font: 30pt arial;">'''Bureau of Field Services'''</span></center>
+
<center><span STYLE="font: 20pt arial;">'''Bureau of Field Services'''</span></center>
  
<center><span STYLE="font: 15pt arial;">'''Construction Field Services Division '''</span></center>
+
<center><span STYLE="font: 15pt arial;">''Construction Field Services Division''</span></center>
  
 
<span style="float: right;">
 
<span style="float: right;">
<center><span style="float: right;">[[File:DI-06711-091.jpg|550px|thumb|right|M-20 bridge project in Midland. Opening of westbound structure to traffic.]]</span></center>
+
<center><span style="float: right;">[[File:DI-06801-092.jpg|450px|thumb|right|Box culvert construction on M-10 in Clare County.]]</span></center>
 
</span>
 
</span>
  
Line 23: Line 23:
 
=[[Current News|<font color="red">Current News</font>]]=
 
=[[Current News|<font color="red">Current News</font>]]=
  
==[[#Documentation Guide|Documentation Guide]]==
+
==[[#New FieldManager Helpdesk Number|New FieldManager Helpdesk Number]]==
The NEW Documentation Guide is now available to replace the former "Minimum Documentation Guide" content. A link to the new "Documentation Guide" has been established in the Side Bar to the left. It can also be accessed by clicking on the thumbnail below.
+
The FieldManager Helpdesk activated its new phone number, '''1-844-4MI-MDOT''' (1-844-464-6368). On the new phone menu, you can reach the FieldManager Helpdesk by selecting option 2 for AASHTOWare and then option 3 for FieldManager. The old number was deactivated on May 1st. The new number is part of the new unified help desk solution, MI MDOT Software Support, used to track and resolve software related issues from customers.
 
+
[[File:MI MDOT Software Support.png|center|200px]]
[[File:Documentation Guide Final Draft 02-25-19.pdf|thumb|center|200px|link=//{{SERVERNAME}}/images_construction/0/0d/Documentation_Guide_Final_Draft_02-25-19.pdf]]
 
  
 
{{top}}
 
{{top}}
Line 34: Line 33:
 
<div style="overflow:auto; height:200px; width:700px">
 
<div style="overflow:auto; height:200px; width:700px">
 
{| class="wikitable" style="background:orange; color:black"
 
{| class="wikitable" style="background:orange; color:black"
|-
 
 
!Updated!! Division !! Section !! Summary !! What Changed
 
!Updated!! Division !! Section !! Summary !! What Changed
 
|-
 
|-
|<center>3/19/2019</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Local_Agency_Projects|103.02]]</center>||[https://www.michigan.gov/documents/mdot_federal_Guidelines_99105_7.pdf Provided link to current Local Agency Programs Section Federal Guidelines]||[http://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&diff=5521&oldid=5256 Compare It]
+
|<center>9/28/2020</center>||<center>7</center>||<center>[[700_-_Closure_of_Unsafe_Structures|700]]</center>||Created new section 700-Closure of Unsafe Structures under Division 7.||[http://mdotwiki.state.mi.us/construction/index.php/700_-_Closure_of_Unsafe_Structures View Here]
|-
 
|<center>3/19/2019</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||[http://mdotwiki.state.mi.us/construction/index.php/File:LOCAL_AGENCY_Boilerplate_Preconstruction_Meeting_Minutes_-_March_2019.docx Preconstruction Meeting Minutes Boilerplate - Local Agency]||[http://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting&diff=5519&oldid=5406 Compare It]
 
 
|-
 
|-
|<center>3/6/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal#Construction_Time_Estimates_-_Production_Rates|102.02]]</center>||Removed old production rate information and replaced with [http://mdotwiki.state.mi.us/construction/index.php/File:MDOT_Production_Rates_.xlsx new .xlsx file containing updated production rate information]||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5510&oldid=5439 Compare It]
+
|<center>9/24/2020</center>||<center>1 Supplemental</center>||<center>[[FieldManager#top|FieldManager]]</center>||Added new item Bi-Annual FieldManager User Account Verification Process||[http://mdotwiki.state.mi.us/construction/index.php/FieldManager#Bi-Annual_FieldManager_User_Account_Verification_Process View Here]
 
|-
 
|-
|<center>2/28/2019</center>||<center>Main Page</center>||<center>Main Page</center>||New Documentation Guide is now available to replace former "Minimum Documentation Guide" content. Link to the "Documentation Guide" also established in Side Bar to the left. ||[//{{SERVERNAME}}/images_construction/0/0d/Documentation_Guide_Final_Draft_02-25-19.pdf View Here]
+
|<center>9/21/2020</center>||<center>1 Supplemental</center>||<center>[[E-Construction#General_Procedures_for_Construction_Records_Retention|E-Construction General Procedures for Construction Records Retention]]</center>||Updated Records Retention content and Training Manual||[http://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&diff=6038&oldid=5982 Compare Here]
 
|-
 
|-
|<center>1/10/2019</center>||<center>1</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension|104.10]]</center>||Updated Contractor Claims Procedure for 2019||[http://mdotwiki.state.mi.us/construction/index.php?title=File:MDOT_Construction_Contractor_Claims_Procedure_January_2019.pdf&page=1 View Here]
+
|<center>8/12/2020</center>||<center>4</center>||<center>[[Mandrel_Testing_of_Plastic_Pipe|Mandrel Testing of Plastic Pipe]]</center>||A new Mandrel Testing of Plastic Pipe page was created to provide all-inclusive, in-depth descriptions with images. In sections 401 and 402, under Mandrel Testing, there is a link to the new page.||[http://mdotwiki.state.mi.us/construction/index.php/Mandrel_Testing_of_Plastic_Pipe View Here]
 
|-
 
|-
|<center>12/12/2018</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal|102.02]]</center>||Updated Boilerplate Progress Clause Template||[http://mdotwiki.state.mi.us/construction/index.php/File:Boilerplate_Progress_Clause_Template_12-12-18.docx View Here]
+
|<center>8/4/2020</center>||<center>1 Supplemental</center>||<center>[[Local_Agency_Program_(LAP)|Local Agency Program (LAP)]]</center>||Updated Local Agency Program (LAP) guidance including an index for program specific project administration instructions labeled as 'LAP Project Considerations' within various sections of the manual||[http://mdotwiki.state.mi.us/construction/index.php?title=Local_Agency_Program_%28LAP%29&diff=5987&oldid=5715 Compare Here]
 
|-
 
|-
|<center>11/7/2018</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||Preconstruction Meeting Minutes Boilerplate - Trunkline||[http://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting&diff=5406&oldid=5265 Compare It]
+
|<center>8/3/2020</center>||<center>1</center>||<center>[[109.08_Prompt_Payment#Prompt_Payment|109.08]]</center>||Updated MERS User Guide||[http://mdotwiki.state.mi.us/construction/index.php?title=109.08_Prompt_Payment&diff=5997&oldid=5782 Compare Here]
 
|-
 
|-
|<center>10/26/2018</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings|811]]</center>||Updated Paint pricing for 2018||[http://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#UNIFORM_PRICE_ADJUSTMENT.2C_REGULAR_DRY_PAINT_AND_LOW_TEMPERATURE_WATERBORNE_PAINT View Updated Table Here]
+
|<center>7/30/2020</center>||<center>1</center>||<center>[[Structural_Fabrication_Quality_Manual|105]]</center>||Created new Structural Fabrication Quality Manual page under Section 105||[http://mdotwiki.state.mi.us/construction/index.php/Structural_Fabrication_Quality_Manual View Here]
 
|-
 
|-
|<center>9/13/2018</center>||<center>1</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual|Materials Quality Assurance Procedures Manual]]</center>||2018 Summary of Revisions to the manual||[http://mdotwiki.state.mi.us/construction/index.php?title=Materials_Quality_Assurance_Procedures_Manual&diff=5394&oldid=5025 Compare It]
+
|<center>7/28/2020</center>||<center>8</center>||<center>[[812_-_Temporary_Traffic_Control_for_Construction_Zone_Operations#top|812]]</center>||Added new subsection "Overhead Sign Covers" with examples||[http://mdotwiki.state.mi.us/construction/index.php/812_-_Temporary_Traffic_Control_for_Construction_Zone_Operations#OVERHEAD_SIGN_COVERS View Here]
 
|-
 
|-
|<center>6/4/2018</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102]]</center>||Provided New Table for "Typical Long Lead Time Items" along with updating to the latest "Boilerplate Progress Clause Template 5-30-15"||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5353&oldid=5201 Compare It]
+
|<center>7/22/2020</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions#Materials|109.05]]</center>||Removed Proof of Payment Requirement for Materials in Force Account||[http://mdotwiki.state.mi.us/construction/index.php?title=109.05_Payment_for_Contract_Revisions&diff=5915&oldid=5620 Compare Here]
 
|-
 
|-
|<center>4/26/2018</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment|109]]</center>||Update to Purpose of Review.||[http://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection,_Acceptance,_and_Final_Payment&diff=5280&oldid=4987 Compare It]
+
|<center>7/22/2020</center>||<center>1</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual|105]]</center>||Added 2020 MQAP content||[http://mdotwiki.state.mi.us/construction/index.php/Materials_Quality_Assurance_Procedures_Manual#2020_Summary_of_Revision_to_the_MQAP View Here]
 
|-
 
|-
|<center>1/19/2018</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208]]</center>||Addition of Notice of termination section.||[http://mdotwiki.state.mi.us/construction/index.php/208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Submittal_of_Notice_of_Termination view here]
+
|<center>6/30/2020</center>||<center>1 Supplemental</center>||<center>[[104.07_Contractor_Obligations#Project_.26_Worksite_Safety|104.07]]</center>||Updated content for the Project & Worksite Safety subsection||[http://mdotwiki.state.mi.us/construction/index.php?title=104.07_Contractor_Obligations&action=historysubmit&diff=5871&oldid=5826 Compare Here]
 
|-
 
|-
|<center>1/17/2018</center>||<center>7</center>||<center>[[708_-_Prestressed_Concrete|708]]</center>||Overhaul of information for section 708||[http://mdotwiki.state.mi.us/construction/index.php?title=708_-_Prestressed_Concrete&diff=5238&oldid=5233 compare]
+
|<center>6/30/2020</center>||<center>1 Supplemental</center>||<center>[[FPR_Frequently_Asked_Questions|FPR Frequently Asked Questions]]</center>||Created a new FPR Frequently Asked Questions page||[http://mdotwiki.state.mi.us/construction/index.php/FPR_Frequently_Asked_Questions View Here]
 
|-
 
|-
|<center>1/16/2018</center>||<center>7</center>||<center>[[707_-_Structural_Steel|707]]||Overhaul of information for section 707||[http://mdotwiki.state.mi.us/construction/index.php?title=707_-_Structural_Steel&diff=5230&oldid=5186 compare]
+
|<center>6/25/2020</center>||<center>1 Supplemental</center>||<center>[[FHWA_CAP_Action_Plans|FHWA CAP Action Plans]]</center>||Created a new FHWA CAP Action Plans page to address IDR issues||[http://mdotwiki.state.mi.us/construction/index.php/FHWA_CAP_Action_Plans View Here]
 
|-
 
|-
|12/19/2017</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs#Engineer_Certification_Program| Engineer Certification]]</center>||Updated Engineer Certification List||[//{{SERVERNAME}}/images_construction/a/ac/Eng_Record_Cert_list_12-19-17.pdf Linked Here]
+
|<center>6/24/2020</center>||<center>1 Supplemental</center>||<center>[[Final_Project_Review_Report|Final Project Review Report]]</center>||Created a new Final Project Review Report page||[http://mdotwiki.state.mi.us/construction/index.php/Final_Project_Review_Report View Here]
 
|-
 
|-
|<center>12/12/2017</center>||<center>1 Supplemental</center>||<center>[[Plans,_Proposal,_Input,_Review_and_Evaluation|Plans, Proposal, Imput, Review and Evaluation]]</center>||Update about Post Construction Information||[http://mdotwiki.state.mi.us/construction/index.php/Other#Post-Construction_Reviews View Here]
+
|<center>6/9/2020</center>||<center>1 Supplemental</center>||<center>[[Interim_File_Review|Interim File Review]]</center>||Created a new Interim File Review page||[http://mdotwiki.state.mi.us/construction/index.php/Interim_File_Review View Here]
 
|-
 
|-
|<center>12/7/2017</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal|102.02]]</center>||Updated Boilerplate Progress Clause Template||[http://mdotwiki.state.mi.us/construction/index.php/File:Boilerplate_Progress_Clause_Template_12-6-17.docx View Here]
+
|<center>5/13/2020</center>||<center>1 Supplemental</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment|109.07]]</center>||Removed the e-File Project Review Procedures from Section 109.07||[http://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&diff=5812&oldid=5776 Compare Here]
 
|-
 
|-
|<center>11/27/2017</center>||<center>Main Page</center>||<center>Main Page</center>||New Preamble for Construction Manual||
+
|<center>5/13/2020</center>||<center>1 Supplemental</center>||<center>[[Letter_to_File|Letter to File]]</center>||Created a new Letter to File page||[http://mdotwiki.state.mi.us/construction/index.php/Letter_to_File View Here]
 
|-
 
|-
|<center>11/27/2017</center>||<center>1 Supplemental</center>||<center>[[e-Construction#Standard_Naming_Convention_for_Documents|Standard Naming Convention]]</center>||New format for Standard Naming Convention||
+
|<center>5/13/2020</center>||<center>1 Supplemental</center>||<center>[[Project_Closeout_Escalation_of_Accountability|Project Closeout Escalation of Accountability]]</center>||Created a new Project Closeout Escalation of Accountability page||[http://mdotwiki.state.mi.us/construction/index.php/Project_Closeout_Escalation_of_Accountability View Here]
 
|-
 
|-
|<center>11/3/2017</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Testing Charges]]</center>||Updated LDPR coding||[http://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use View here]
+
|<center>5/12/2020</center>||<center>1 Supplemental</center>||<center>[[Final_Project_Review|Final Project Review]]</center>||Created a new Final Project Review page||[http://mdotwiki.state.mi.us/construction/index.php/Final_Project_Review View Here]
 
|-
 
|-
|<center>11/2/2017</center>||<center>1 Supplemental</center>||<center>[[E-Construction|E-Construction]]</center>||Updated table for file naming||[http://mdotwiki.state.mi.us/construction/index.php/E-Construction#e-Construction.2FPaper_File_System View table here]
+
|<center>4/28/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Created new Certified Engineer Process page||[http://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process View Here]
 
|-
 
|-
|<center>11/1/2017</center>||<center>1 Supplemental</center>||<center>[[Local_Agency|Local Agency]]</center>||Updated coding information for SIGMA||[http://mdotwiki.state.mi.us/construction/index.php/Local_Agency#CHARGING_TIME_TO_LOCAL_AGENCY_PROJECTS View Here]
+
|<center>4/21/2020</center>||<center>1</center>||<center>[[109.08_Prompt_Payment|109.08]]</center>||Created new Prompt Payment section with flow chart ||[http://mdotwiki.state.mi.us/construction/index.php/109.08_Prompt_Payment View Here]
 
|-
 
|-
|<center>10/26/2017</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings|811]]</center>||Added new section for Special Markings for Cold Weather||[http://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#Temporary_Special_Markings_for_Cold_Weather View Here]
+
|<center>2/12/2020</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause|102.02]]</center>||Updated to Boilerplate Progress Clause Template [//{{SERVERNAME}}/images_construction/4/40/Boilerplate_Progress_Clause_Template_2-10-20.docx (Revision 2/10/2020)]||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5717&oldid=5567 Compare It]
 
|-
 
|-
|<center>10/19/2017</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings|811]]</center>||Updated Paint pricing for 2017||[http://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#UNIFORM_PRICE_ADJUSTMENT.2C_REGULAR_DRY_PAINT_AND_LOW_TEMPERATURE_WATERBORNE_PAINT View Updated Table Here]
+
|<center>01/23/2020</center>||<center>1</center>||<center>[[104.07_Contractor_Obligations#Worker_Visibility|104.07]]</center>||Update to Worker Visibility information and photos||[http://mdotwiki.state.mi.us/construction/index.php?title=104.07_Contractor_Obligations&diff=5710&oldid=4920 Compare It]
 
|-
 
|-
|<center>9/21/2017</center>||<center>1</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual|Materials Quality Assurance Procedures Manual]]</center>||2017 Summary of Revision to the manual||
+
|<center>01/21/2020</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||Update to Local Agency Boilerplate Preconstruction Meeting Minutes - January 2020||[//{{SERVERNAME}}/images_construction/5/5d/LOCAL_AGENCY_Boilerplate_Preconstruction_Meeting_Minutes_-_January_2020.docx View Here]
 
|-
 
|-
|<center>9/14/2017</center>||<center>1 Supplemental</center>||<center>[[Local_Agency#Project_Administration:_MDOT_Oversight_Folder|Local Agency]]</center>||Guidance on new folder in ProjectWise||
+
|<center>01/21/2020</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208]]</center>||Update for entire Soil Erosion and Sedimentation Control (NPDES) section||[http://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&diff=5694&oldid=5664 Compare It]
 
|-
 
|-
|<center>9/6/2017</center>||<center>1</center>||<center>[[LCPtracker_Supplemental_Information|LCPtracker Tracker]]</center>||New Page specifically for LCPtracker||
+
|<center>10/22/2019</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use|Construction Field Services Indirect Testing Charges]]</center>||Update for FY 2020 Indirect Testing Coding||[http://mdotwiki.state.mi.us/construction/index.php?title=Construction_Field_Services_Indirect_Testing_Charges&action=historysubmit&diff=5654&oldid=5400 Compare It]
 
|-
 
|-
|<center>8/24/2017</center>||<center>1</center>||<center>[[102.14_Construction_Progress_Schedule|102.14]]</center>||Moved progress form 1130 to new section 102.14||
+
|<center>9/26/2019</center>||<center>1</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual| 105]]</center>||2019 Summary of revisions to the Materials Quality Assurance Procedures Manual ||[http://mdotwiki.state.mi.us/construction/index.php?title=Materials_Quality_Assurance_Procedures_Manual&diff=5642&oldid=5497 Compare It]
 
|-
 
|-
|<center>7/11/2017</center>||<center>1</center>||<center>[[108.01_Subcontracting_of_Contract_Work#Construction_Subcontract_Process|108.1]]</center>||Changed email for 1302A Forms||[mailto:MDOT-ConstructionSubcontracts@michigan.gov New email address here]
+
|<center>9/26/2019</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Field_Inspection_and_Processing_of_Progress_Payments|811]]</center>||Permanent Pavement Markings Field Inspection and Processing of Progress Payments: Updated new content ||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=5640&oldid=5632 Compare It]
 
|-
 
|-
|<center>6/20/2017</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Construction Field Services Indirect Testing Charges]]</center>||New coding content||[http://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use View Coding Guidelines here]
+
|<center>9/18/2019</center>||<center>6</center>||<center>[[602_-_Concrete_Pavement_Construction#Load_Transfer_Assemblies|602]]</center>||Load Transfer Assemblies: Updated new content and included Presentation for Load Transfer Assemblies Inspections||[http://mdotwiki.state.mi.us/construction/index.php?title=602_-_Concrete_Pavement_Construction&diff=5629&oldid=5556 Compare It]
 
|-
 
|-
|<center>6/16/2016</center>||<center>1 Supplemental</center>||<center>[[FieldManager|FieldManager]]</center>||Addition of CMU 2017-003, Electronic Read only Files||[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=4895&oldid=4836 View Here]
+
|<center>9/18/2018</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings|811]]</center>||Updated Paint pricing for 2019||[http://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#UNIFORM_PRICE_ADJUSTMENT.2C_REGULAR_DRY_PAINT_AND_LOW_TEMPERATURE_WATERBORNE_PAINT View Updated Table Here]
 
|-
 
|-
|<center>4/25/2017</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal#Progress_Clause| 102.02]]</center>||Update according to CA 2015-11 with Boiler progress update.||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal&diff=4631&oldid=4454 Compare It]
+
|<center>8/30/2019</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||Update to Trunkline Boilerplate Preconstruction Meeting Minutes - 2019||[//{{SERVERNAME}}/images_construction/5/5e/TRUNKLINE_Boilerplate_Preconstruction_Meeting_Minutes_2019_Final.docx View Here]
 
|-
 
|-
|<center>4/21/2017</center>||<center>1</center>||<center>[[Contract_Administration_and_Oversight_Guidelines_for_Projects_Containing_Warranty_Work|Contract Admin]]</center>||Added content according to CA 2015-13||[http://mdotwiki.state.mi.us/construction/index.php?title=Contract_Administration_and_Oversight_Guidelines_for_Projects_Containing_Warranty_Work&diff=4616&oldid=4544 Compare It]
+
|<center>8/20/2019</center>||<center>1 Supplemental</center>||<center>[[FieldManager#Standard_Rounding_Convention_Guidance|FieldManager]]</center>||New guidance related to the Standard Rounding Convention ||[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=5615&oldid=5386 Compare It]
 
|-
 
|-
|<center>4/19/2017</center>||<center>2</center>||<center>[[205_-_Roadway_Earthwork#Cost_Over_Runs_From_Off_Site_Disposal_of_Soil|205]]</center>||Added content in accordance with CA 2008-01||[http://mdotwiki.state.mi.us/construction/index.php?title=205_-_Roadway_Earthwork&diff=4609&oldid=4268 Compare It]
+
|<center>7/31/2019</center>||<center>Main Page</center>||<center>Main Page</center>||July update to the Documentation Guide which includes corrections related to density requirements. It also includes updated language related to the [//{{SERVERNAME}}/images_construction/6/6a/Documentation_Guide_Final_Draft_07-29-19.pdf#page=3 "e-Final Project Review Procedures"]||[//{{SERVERNAME}}/images_construction/6/6a/Documentation_Guide_Final_Draft_07-29-19.pdf View Here]
 
|-
 
|-
|<center>4/19/2017</center>||<center>1</center>||<center>[[104.07_Contractor_Obligations#Project_.26_Worksite_Safety|104.07]]</center>||Added Content according to CA 2013-12, Workers Safety||[http://mdotwiki.state.mi.us/construction/index.php?title=104.07_Contractor_Obligations&diff=4605&oldid=4570 Compare It]
 
|-
 
|<center>4/19/2017</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions#Force Account Work|109.05]]</center>||Made adjustments to implement form 1101-SP109||[http://mdotwiki.state.mi.us/construction/index.php?title=109.05_Payment_for_Contract_Revisions&diff=4603&oldid=4588 Compare It]
 
|-
 
|<center>4/5/2017</center>||<center>1</center>||<center>[[Prevailing_Wage_Oversight_Procedures#Prevailing_Wage_Classifications|Prevailing Wage]]</center>||Added Section for Prevailing Wage Classification from CA 2007-15||[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures#Prevailing_Wage_Classifications View Here]
 
 
|}
 
|}
 
</div>
 
</div>
Line 123: Line 114:
 
!Updated!! Division !! Section !! Summary !! What Changed
 
!Updated!! Division !! Section !! Summary !! What Changed
 
|-
 
|-
|<center>4/1/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Added Delineator and 3# U-Channel Posts to Typical Long-Lead Items table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5523&oldid=5514 Compare It]
+
|<center>9/24/2020</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Uniform_Price_Adjustment.2C_Regular_Dry_Paint_and_Low_Temperature_Waterborne_Paint|811]]</center>||Updated Permanent Pavement Markings payment table to include 2020 prices||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=6047&oldid=5647 Compare Here]
 +
|-
 +
|<center>9/24/2020</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause|102.02]]</center>||Added Guardrail-Steel to the Long-Lead item table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=6045&oldid=5947 Compare Here]
 +
|-
 +
|<center>9/15/2020</center>||<center>Disadvantaged Business Enterprises (DBE)</center>||<center>[[Disadvantaged_Business_Enterprises_(DBE)#Title_VI_Coordinator|Disadvantaged Business Enterprises (DBE)]]</center>||Updated contact information for MDOT's Title VI Coordinator to [mailto:CurryO@michigan.gov Orlando Curry]  517-241-7462||[http://mdotwiki.state.mi.us/construction/index.php?title=Disadvantaged_Business_Enterprises_%28DBE%29&diff=6034&oldid=5825 View Here]
 +
|-
 +
|<center>8/11/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Record Certification List with added Consultants||[http://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1 Supplemental</center>||<center>[[FieldManager#LAP_Project_Considerations|FieldManager]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/FieldManager#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1 Supplemental</center>||<center>[[Plans,_Proposal,_Input,_Review_and_Evaluation#LAP_Project_Considerations|Plans, Proposal, Input, Review and Evaluation]]</center>||Added 'LAP Project Considerations' to the section under Design/Construction Package Evaluation||[http://mdotwiki.state.mi.us/construction/index.php/Plans,_Proposal,_Input,_Review_and_Evaluation#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1 Supplemental</center>||<center>[[Plans,_Proposal,_Input,_Review_and_Evaluation#LAP_Project_Considerations_2|Plans, Proposal, Input, Review and Evaluation]]</center>||Added 'LAP Project Considerations' to the section under Post-Construction Reviews||[http://mdotwiki.state.mi.us/construction/index.php/Plans,_Proposal,_Input,_Review_and_Evaluation#LAP_Project_Considerations_2 View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[Preconstruction_Meeting#LAP_Project_Considerations|102]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/Preconstruction_Meeting#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[102.01_Prequalification_of_Bidders#LAP_Project_Considerations|102.01]]</center>||Added 'LAP Project Considerations' to the section under Processing of Contractor Performance Evaluations||[http://mdotwiki.state.mi.us/construction/index.php/102.01_Prequalification_of_Bidders#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#LAP_Project_Considerations|102.02]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/102.02_Contents_of_Proposal_-_Progress_Clause#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[Extending_Project_Limits#LAP_Project_Considerations|103]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/Extending_Project_Limits#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#LAP_Project_Considerations|103.02]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/103.02_Contract_Revisions#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#LAP_Project_Considerations|103.02]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/103.02_Contract_Revisions#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#LAP_Project_Considerations|104.10]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[108.07_Extension_of_Time_on_Work_Day_Contracts|108.07]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/108.07_Extension_of_Time_on_Work_Day_Contracts View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[Project_Delays_Due_to_a_Utility_Company#LAP_Project_Considerations|108]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/Project_Delays_Due_to_a_Utility_Company#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations|109.07]]</center>||Added 'LAP Project Considerations' to the section under Final Inspection, Acceptance, and Final Payment-Acceptance of work||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_2|109.07]]</center>||Added 'LAP Project Considerations' to the section under Final Inspection, Acceptance, and Final Payment-Pay Estimate and Inactive Project Notification||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_2 View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_3|109.07]]</center>||Added 'LAP Project Considerations' to the section under Final Estimates||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_3 View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_4|109.07]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_4 View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_5|109.07]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_5 View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_6|109.07]]</center>||Added 'LAP Project Considerations' to the section under Required Signature on Construction Pay Estimates||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_6 View Here]
 
|-
 
|-
|<center>3/14/2019</center>||<center>7</center>||<center>[[715_-_Cleaning_and_Coating_Existing_Structural_Steel#Health_and_Safety|715]]</center>||Updated content related to: Health and Safety, Respiratory Protection and Protective Equipment, Medical Surveillance, Exposure Monitoring, Hygiene Facilities, and Lead Awareness Training||[http://mdotwiki.state.mi.us/construction/index.php?title=715_-_Cleaning_and_Coating_Existing_Structural_Steel&diff=5516&oldid=5480 Compare It]
+
|<center>8/4/2020</center>||<center>1 Supplemental</center>||<center>[[E-Construction#LAP_Project_Considerations|e-Construction]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/E-Construction#LAP_Project_Considerations View Here]
 
|-
 
|-
|<center>3/13/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Added Strain Poles to Typical Long-Lead Items table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5514&oldid=5510 Compare It]
+
|<center>7/27/2020</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Construction_Time_Estimates_-_Production_Rates|102.02]]</center>||Updated MDOT Production Rates link. Old link did not work properly.||[http://mdotwiki.state.mi.us/construction/index.php/102.02_Contents_of_Proposal_-_Progress_Clause#Construction_Time_Estimates_-_Production_Rates View Here]
 
|-
 
|-
|<center>1/22/2019</center>||<center>7</center>||<center>[[718_-_Drilled_Shafts|718]]</center>||Provided clarification relating to [[718_-_Drilled_Shafts#Tremie_Tube_Concrete_Placement|Tremie Tube Concrete Placement]] along with inspection of shaft after [[718_-_Drilled_Shafts#Placing_Steel_Reinforcement|Placing Steel Reinforcement]] cage||[http://mdotwiki.state.mi.us/construction/index.php?title=718_-_Drilled_Shafts&diff=5487&oldid=4248 Compare It]
+
|<center>7/22/2020</center>||<center>1 Supplemental</center>||<center>[[FieldManager|FieldManager]]</center>||Updated Content for Showing Detail Calculations on Inspector’s Daily Report and Added Rounding Convention Example||[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=5938&oldid=5875 Compare Here]
 
|-
 
|-
|<center>1/16/2019</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions#Small_Tools|109.05]]</center>||Clarification related to small tools for Force Account Work||[http://mdotwiki.state.mi.us/construction/index.php?title=109.05_Payment_for_Contract_Revisions&diff=5453&oldid=4945 Compare It]
+
|<center>6/30/2020</center>||<center>1 Supplemental</center>||<center>[[FPR_Frequently_Asked_Questions#How_is_the_Final_Project_Review_Report_updated.3F|FPR Frequently Asked Questions]]</center>||Added FPR Report User Guide link to FPR FAQ page||[http://mdotwiki.state.mi.us/construction/index.php?title=FPR_Frequently_Asked_Questions&diff=5868&oldid=5867 Compare Here]
 
|-
 
|-
|<center>12/3/2018</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs|Certification Programs]]</center>||Updated Engineer Record Certification List||[http://mdotwiki.state.mi.us/construction/index.php/File:Eng_Record_Cert_list_12-03-18.pdf View Here]
+
|<center>6/30/2020</center>||<center>1 Supplemental</center>||<center>[[Final_Project_Review|Final Project Review]]</center>||Added FAQs link for Final Project Review to page||[http://mdotwiki.state.mi.us/construction/index.php?title=Final_Project_Review&diff=5859&oldid=5849 Compare Here]
 
|-
 
|-
|<center>8/30/2018</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs|Certification Programs]]</center>||Updated Engineer Record Certification List||[http://mdotwiki.state.mi.us/construction/index.php/File:Eng_Record_Cert_list_08-30-18.pdf View Here]
+
|<center>6/24/2020</center>||<center>1 Supplemental</center>||<center>[[Project_Closeout_Escalation_of_Accountability|Project Closeout Escalation of Accountability]]</center>||Added links to the new Final Project Review Report page||[http://mdotwiki.state.mi.us/construction/index.php?title=Project_Closeout_Escalation_of_Accountability&diff=5845&oldid=5815 Compare Here]
 
|-
 
|-
|<center>8/29/2018</center>||<center>1 Supplemental</center>||<center>[[FieldManager#Inspector.27s_Daily_Report_.28IDR.29|FieldManager]]</center>||Updated content related to Inspector Daily Reports and noting visual acceptance of material||[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=5386&oldid=4953 Compare It]
+
|<center>6/17/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Reformatted the Certified Engineer Renewal Process for clarity||[http://mdotwiki.state.mi.us/construction/index.php?title=Certified_Engineer_Process&diff=5841&oldid=5840 Compare Here]
 
|-
 
|-
|<center>2/20/2018</center>||<center>1</center>||<center>[[Prevailing_Wage_Oversight_Procedures|Prevailing Wage Oversight]]</center>||Updated Title VI Poster||[http://mdotwiki.state.mi.us/construction/index.php/File:MDOT_TitleVI_englishposter.pdf View Here]
+
|<center>6/9/2020</center>||<center>1 Supplemental</center>||<center>[[Final_Project_Review|Final Project Review]]</center>||Updated Final Project Review page with Interim File Review link||[http://mdotwiki.state.mi.us/construction/index.php?title=Final_Project_Review&diff=5831&oldid=5813 Compare Here]
 
|-
 
|-
|<center>2/12/2018</center>||<center>1</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension|104.10]]</center>||Changed contact info to Mike Deboer and added direction to Claims Database in ProjectWise||[http://mdotwiki.state.mi.us/construction/index.php?title=104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension&diff=5251&oldid=4922 Compare It]
+
|<center>06/01/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certification Programs]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/e/e7/Eng_Record_Cert_list_06-01-2020.pdf View Here]
 
|-
 
|-
|<center>2/6/2018</center>||<center>5</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt|501]]</center>||Changed roller speed calculation from 23.36 mph to 2.36 mph||[https://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt#Roller_Speed section here]
+
|<center>5/1/2020</center>||<center>1 Supplemental</center>||<center>[[Dispute_Review_Board_(DRB)| Dispute Review Board (DRB)]]</center>||Added updated DRB Procedures to include those let on and after 6-5-2020/Removed older links||[http://mdotwiki.state.mi.us/construction/index.php?title=Dispute_Review_Board_%28DRB%29&diff=5792&oldid=5137 Compare Here]
 
|-
 
|-
|<center>1/16/2018</center>||<center>1</center>||<center>[[108.05_Progress_of_the_Work|108.05]]</center>||Moved content from 102.14 to 108.05||
+
|<center>4/30/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Office_Technician_Process| Certified Office Technician Process]]</center>||Edited page to reflect only Certified Technician Process information||[http://mdotwiki.state.mi.us/construction/index.php?title=Certified_Office_Technician_Process&diff=5787&oldid=5720 Compare Here]
 
|-
 
|-
|<center>1/10/2018</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause|12.02]]</center>||Renamed page and moved structures progress clause to this section||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5189&oldid=5182 Compare It]
+
|<center>4/29/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Non-Payment_Claims| 109.07]]</center>||Removed "Review of Prompt Payment Complaints" section as it's now its own page||[http://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&diff=5776&oldid=5730 Compare Here]
 
|-
 
|-
|<center>1/4/2018</center>||<center>1 supplemental</center>||||Separated "other" page into separate pages||  
+
|<center>4/27/2020</center>||<center>1</center>||<center>[[101.04_-_Inspector%27s_Daily_Reports|101.04 Inspector Daily Reports]]<hr>[[FieldManager|FieldManager]]</center>||Updated Helpdesk number from 517-322-1556 to '''1-844-4MI-MDOT''' (1-844-464-6368) in these sections along with the Main page [http://mdotwiki.state.mi.us/construction/index.php/Main_Page#New_FieldManager_Helpdesk_Number Current News] area above
 +
||[http://mdotwiki.state.mi.us/construction/index.php?title=101.04_-_Inspector%27s_Daily_Reports&diff=5765&oldid=1534 Compare Here]<hr>[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=5764&oldid=5713 Compare Here]
 
|-
 
|-
|<center>12/20/2017</center>||<center>1</center>||<center>[[102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_(DBEs)#DBE_Performance_Indicators|102.18]]</center>||Updated content related to Commercially Useful Function (CUF). Part of CMU 2017-005||[http://mdotwiki.state.mi.us/construction/index.php?title=102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_(DBEs)&diff=5162&oldid=4910 Compare It]
+
|<center>4/22/2020</center>||<center>1</center>||<center>[[102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_(DBEs)#Prompt_Payment| 102.18]]</center>||Added the newly created Prompt Payment link to Section 102.18||[http://mdotwiki.state.mi.us/construction/index.php?title=102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_%28DBEs%29&diff=5757&oldid=5164 Compare Here]
 
|-
 
|-
|<center>12/4/2017</center>||<center>1 Supplemental</center>||<center>[[Dispute_Review_Board_(DRB)|Dispute Review Board]]</center>||Update to page and ProjectWise directions||
+
|<center>4/15/2020</center>||<center>1</center>||<center>[[105.01_Quality_and_Scope_of_Supply| 105.01]]</center>||Changed Density Control Manual to Density Testing and Inspection Manual||[http://mdotwiki.state.mi.us/construction/index.php?title=105.01_Quality_and_Scope_of_Supply&diff=5747&oldid=5745 Compare Here]
 
|-
 
|-
|<center>11/28/2017</center>||<center>1 Supplemental</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Updated examples for Calc forms||
+
|<center>4/14/2020</center>||<center>1</center>||<center>[[105.01_Quality_and_Scope_of_Supply| 105.01]]</center>||Changed Density Control Handbook to Density Control Manual||[http://mdotwiki.state.mi.us/construction/index.php?title=105.01_Quality_and_Scope_of_Supply&diff=5745&oldid=4928 Compare Here]
 
|-
 
|-
|<center>11/2/2016</center>||<center>1</center>||<center>NA</center>||Removed 'Disincentive' from manual language||
+
|<center>3/30/2020</center>||<center>1</center>||<center>[[Prevailing_Wage_Oversight_Procedures#JOBSITE_POSTING| 107]]</center>||Updated Jobsite Poster||[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures#JOBSITE_POSTING View Here]
 
|-
 
|-
|<center>10/26/2017</center>||<center>1</center>||<center>[[103.02_Contract_Revisions|103.02]]</center>||Moved ''Contract Modification Process Overview'' page to ''103.02 Contract Revisions||[http://mdotwiki.state.mi.us/construction/index.php/103.02_Contract_Revisions View Here]
+
|<center>3/20/2020</center>||<center>1</center>||<center>[[Process_for_Documenting_Certified_Materials_in_FieldManager| 105]]</center>||Deleted information no longer applicable, or is covered in other documents/Renamed section due to changes||[http://mdotwiki.state.mi.us/construction/index.php?title=Process_for_Documenting_Certified_Materials_in_FieldManager&diff=5737&oldid=4931 Compare It]
 
|-
 
|-
|<center>10/25/2017</center>||<center>7 Supplemental</center>||<center>[[Division 7 Supplemental Information#Division_7_Supplemental_Information|Division 7 Supplemental Information]]</center>||Updated notification contact information for bridge deck pours and concrete deck overlays||[https://mdotwiki.state.mi.us/construction/index.php?title=Division_7_Supplemental_Information&diff=5064&oldid=4970 View Update]
+
|<center>3/18/2020</center>||<center>1</center>||<center>[[108.01_Subcontracting_of_Contract_Work| 108.01]]</center>||Updated links to the new 1302-Fed form.||[http://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&diff=5734&oldid=4975 Compare Here]
 
|-
 
|-
|<center>10/23/2017</center>||<center>1</center>||<center>NA</center>||Changed language from "Approved for Traffic" to "Open to traffic"||
+
|<center>2/21/2020</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#General_Contract_Modification_Information| 103.02]]</center>||General Contract Modification Information Format Revision||[http://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&diff=5728&oldid=5714 Compare It]
 
|-
 
|-
|<center>10/11/2017</center>||<center>8</center>||<center>[[803_-_Concrete_Sidewalk,_Ramps,_and_Steps#MEASUREMENT_AND_PAYMENT|803]]</center>||Added illustration of sidewalk measurement and payment||[//{{SERVERNAME}}/images_construction/7/72/Road_Design_Manual_Chapter_6_-_ADA_Ramp_payment_items.pdf See Here]
+
|<center>2/13/2020</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|E-Construction]]</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|Standard Naming Convention for Documents]]</center>||Updated Naming Convention Table to reflect recent changes. Also included updated [//{{SERVERNAME}}/images_construction/d/d5/Standard_Naming_Convention_Revised_2-13-20.pdf PDF] and [//{{SERVERNAME}}/images_construction/a/a1/Standard_Naming_Convention_Revised_2-13-20.xlsx XLSX] files (Rev 2-13-20)||[http://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&diff=5726&oldid=5576 Compare It]
 
|-
 
|-
|<center>9/26/2017</center>||<center>1</center>||<center>[[Prevailing_Wage_Oversight_Procedures|Prevailing Wage Oversight Procedures]]</center>||Updated Posters to add USERRA Poster||[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures#JOBSITE_POSTING View Here]
+
|<center>02/13/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/7/7a/Eng_Record_Cert_list_02-13-2020.pdf View Here]
 
|-
 
|-
|<center>4/24/2017</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Pay_Item_Selection|109.07]]</center>||Updated according CA 2015-06||[http://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&diff=4622&oldid=4591 Compare It]
+
|<center>01/22/2020</center>||<center>Prevailing Wage Oversight Procedures</center>||<center>[[Prevailing_Wage_Oversight_Procedures#JOBSITE_POSTING| Jobsite Posting]]</center>||Updated contact information on the Title VI Poster and Coordinator site information||[http://mdotwiki.state.mi.us/construction/index.php?title=Prevailing_Wage_Oversight_Procedures&diff=5703&oldid=5036 Compare It]
 
|-
 
|-
|<center>4/24/2017</center>||<center>1</center>||<center>[[Disadvantaged_Business_Enterprises_(DBE)#Disadvantages_Business_Enterprises_.28DBE.29|Disadvantaged Business]]</center>||Updated content according CA 2014-13||[http://mdotwiki.state.mi.us/construction/index.php?title=Disadvantaged_Business_Enterprises_%28DBE%29&diff=4620&oldid=4571 Compare It]
+
|<center>11/12/2019</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Notification_2| 208]]</center>||Soil Erosion and Sedimentation Control Notifications: Updated Notice of Coverage (NOC) and Notice of Termination (NOT) charts||[http://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&diff=5663&oldid=5586 Compare It]
 
|-
 
|-
|<center>4/21/2017</center>||<center>1 Supplemental</center>||<center>[[Local_Agency#PROJECT_ADMINISTRATION_MDOT-LET_LOCAL_AGENCY_PROJECTS|Local Agency]]</center>||Updated content according to CA 2009-16||[http://mdotwiki.state.mi.us/construction/index.php?title=Local_Agency&diff=4618&oldid=4574 Compare It]
+
|<center>10/29/2019</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges#Eligibility_and_Use|Indirect Testing Charges - Eligibility and Use]]</center>||Updated first bullet information for clarity and to include examples||[http://mdotwiki.state.mi.us/construction/index.php?title=Construction_Field_Services_Indirect_Testing_Charges&diff=5659&oldid=5654 Compare It]
 
|-
 
|-
|<center>4/20/2017</center>||<center>5</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt|501]]</center>||Updated content from CA 2006-07||[http://mdotwiki.state.mi.us/construction/index.php?title=501_-_Plant_Produced_Hot_Mix_Asphalt&diff=4614&oldid=4250 Compare It]
+
|<center>10/28/2019</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/4/45/Eng_Record_Cert_list_10-23-19.pdf View Here]
 
|-
 
|-
|<center>4/20/2017</center>||<center>5</center>||<center>[[502_-_HMA_Crack_Treatment#GENERAL|502]]</center>||Added update from CA 2009-03 to CM||[http://mdotwiki.state.mi.us/construction/index.php?title=502_-_HMA_Crack_Treatment&diff=4611&oldid=3361 Compare It]
+
|<center>10/3/2019</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Pavement_Marking_Turn_Arrows|811]]</center>||Removal of references to outdated paint marking turn arrows||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=5647&oldid=5640 Compare It]
 
|-
 
|-
|<center>4/19/2017</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs#Review_Procedure|Cert Programs]]</center>||Added text from CA 2014-03||[http://mdotwiki.state.mi.us/construction/index.php?title=Certification_Programs&diff=4607&oldid=4311 Compare It]
+
|<center>8/22/2019</center>||<center>1</center>||<center>[[107.09_Archeological_and_Historical_Findings|107.09]]</center>||Update related to the process for archeological findings||[http://mdotwiki.state.mi.us/construction/index.php?title=107.09_Archeological_and_Historical_Findings&diff=5618&oldid=4933 Compare It]
|-
 
|<center>4/5/2017</center>||<center>6</center>||<center>[[603_-_Concrete_Pavement_Restoration#Removing Old Concrete|603]]</center>||Added text update from CA 2013-09||[http://mdotwiki.state.mi.us/construction/index.php?title=603_-_Concrete_Pavement_Restoration&diff=4429&oldid=4017 Compare It]
 
 
|-
 
|-
|<center>3/28/2017</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Marked_Plans|109.07]]</center>||Added links from CA 2009-20||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Marked_Plans View Here]
+
|<center>7/11/2019</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208]]</center>||Added 2 flowcharts for Notice of Coverage (NOC) and Notice of Termination (NOT) in section 208 between “Notification” and “Training”. Also updated language to reflect recent name change of the "Michigan Department of Environmental Quality (MDEQ)" to the "Michigan Department of Environment, Great Lakes, and Energy (EGLE)"||[http://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&diff=5586&oldid=5241 Compare It]
 
|-
 
|-
|<center>3/27/2017</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions#DOCUMENTING_PRICE_NEGOTIATIONS|109.05]]</center>||Updated reference to CFR and included link||[http://mdotwiki.state.mi.us/construction/index.php/109.05_Payment_for_Contract_Revisions#DOCUMENTING_PRICE_NEGOTIATIONS View Here]
 
 
|}
 
|}
 
</div>
 
</div>

Revision as of 16:24, 28 September 2020

www.michigan.gov/mdot


CONSTRUCTION MANUAL


Logo.jpg


Bureau of Field Services
Construction Field Services Division

Box culvert construction on M-10 in Clare County.

MDOT Mission Statement

Providing the highest quality integrated transportation services for economic benefit and improved quality of life.


Current News

New FieldManager Helpdesk Number

The FieldManager Helpdesk activated its new phone number, 1-844-4MI-MDOT (1-844-464-6368). On the new phone menu, you can reach the FieldManager Helpdesk by selecting option 2 for AASHTOWare and then option 3 for FieldManager. The old number was deactivated on May 1st. The new number is part of the new unified help desk solution, MI MDOT Software Support, used to track and resolve software related issues from customers.

MI MDOT Software Support.png

[top of page]


Recent Major Changes

The table below is a list of Major changes.

Updated Division Section Summary What Changed
9/28/2020
7
700
Created new section 700-Closure of Unsafe Structures under Division 7. View Here
9/24/2020
1 Supplemental
FieldManager
Added new item Bi-Annual FieldManager User Account Verification Process View Here
9/21/2020
1 Supplemental
E-Construction General Procedures for Construction Records Retention
Updated Records Retention content and Training Manual Compare Here
8/12/2020
4
Mandrel Testing of Plastic Pipe
A new Mandrel Testing of Plastic Pipe page was created to provide all-inclusive, in-depth descriptions with images. In sections 401 and 402, under Mandrel Testing, there is a link to the new page. View Here
8/4/2020
1 Supplemental
Local Agency Program (LAP)
Updated Local Agency Program (LAP) guidance including an index for program specific project administration instructions labeled as 'LAP Project Considerations' within various sections of the manual Compare Here
8/3/2020
1
109.08
Updated MERS User Guide Compare Here
7/30/2020
1
105
Created new Structural Fabrication Quality Manual page under Section 105 View Here
7/28/2020
8
812
Added new subsection "Overhead Sign Covers" with examples View Here
7/22/2020
1
109.05
Removed Proof of Payment Requirement for Materials in Force Account Compare Here
7/22/2020
1
105
Added 2020 MQAP content View Here
6/30/2020
1 Supplemental
104.07
Updated content for the Project & Worksite Safety subsection Compare Here
6/30/2020
1 Supplemental
FPR Frequently Asked Questions
Created a new FPR Frequently Asked Questions page View Here
6/25/2020
1 Supplemental
FHWA CAP Action Plans
Created a new FHWA CAP Action Plans page to address IDR issues View Here
6/24/2020
1 Supplemental
Final Project Review Report
Created a new Final Project Review Report page View Here
6/9/2020
1 Supplemental
Interim File Review
Created a new Interim File Review page View Here
5/13/2020
1 Supplemental
109.07
Removed the e-File Project Review Procedures from Section 109.07 Compare Here
5/13/2020
1 Supplemental
Letter to File
Created a new Letter to File page View Here
5/13/2020
1 Supplemental
Project Closeout Escalation of Accountability
Created a new Project Closeout Escalation of Accountability page View Here
5/12/2020
1 Supplemental
Final Project Review
Created a new Final Project Review page View Here
4/28/2020
1 Supplemental
Certified Engineer Process
Created new Certified Engineer Process page View Here
4/21/2020
1
109.08
Created new Prompt Payment section with flow chart View Here
2/12/2020
1
102.02
Updated to Boilerplate Progress Clause Template (Revision 2/10/2020) Compare It
01/23/2020
1
104.07
Update to Worker Visibility information and photos Compare It
01/21/2020
1
102
Update to Local Agency Boilerplate Preconstruction Meeting Minutes - January 2020 View Here
01/21/2020
2
208
Update for entire Soil Erosion and Sedimentation Control (NPDES) section Compare It
10/22/2019
1 Supplemental
Construction Field Services Indirect Testing Charges
Update for FY 2020 Indirect Testing Coding Compare It
9/26/2019
1
105
2019 Summary of revisions to the Materials Quality Assurance Procedures Manual Compare It
9/26/2019
8
811
Permanent Pavement Markings Field Inspection and Processing of Progress Payments: Updated new content Compare It
9/18/2019
6
602
Load Transfer Assemblies: Updated new content and included Presentation for Load Transfer Assemblies Inspections Compare It
9/18/2018
8
811
Updated Paint pricing for 2019 View Updated Table Here
8/30/2019
1
102
Update to Trunkline Boilerplate Preconstruction Meeting Minutes - 2019 View Here
8/20/2019
1 Supplemental
FieldManager
New guidance related to the Standard Rounding Convention Compare It
7/31/2019
Main Page
Main Page
July update to the Documentation Guide which includes corrections related to density requirements. It also includes updated language related to the "e-Final Project Review Procedures" View Here

A definition to the types of changes that you might see in the Construction Manual can be found under Content Revision Procedures, Types of Changes.

[top of page]


Recent Minor Changes

The table below is a list of Minor changes.

Updated Division Section Summary What Changed
9/24/2020
8
811
Updated Permanent Pavement Markings payment table to include 2020 prices Compare Here
9/24/2020
1
102.02
Added Guardrail-Steel to the Long-Lead item table Compare Here
9/15/2020
Disadvantaged Business Enterprises (DBE)
Disadvantaged Business Enterprises (DBE)
Updated contact information for MDOT's Title VI Coordinator to Orlando Curry 517-241-7462 View Here
8/11/2020
1 Supplemental
Certified Engineer Process
Updated Record Certification List with added Consultants View Here
8/4/2020
1 Supplemental
FieldManager
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1 Supplemental
Plans, Proposal, Input, Review and Evaluation
Added 'LAP Project Considerations' to the section under Design/Construction Package Evaluation View Here
8/4/2020
1 Supplemental
Plans, Proposal, Input, Review and Evaluation
Added 'LAP Project Considerations' to the section under Post-Construction Reviews View Here
8/4/2020
1
102
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
102.01
Added 'LAP Project Considerations' to the section under Processing of Contractor Performance Evaluations View Here
8/4/2020
1
102.02
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
103
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
103.02
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
103.02
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
104.10
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
108.07
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
108
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section under Final Inspection, Acceptance, and Final Payment-Acceptance of work View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section under Final Inspection, Acceptance, and Final Payment-Pay Estimate and Inactive Project Notification View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section under Final Estimates View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section under Required Signature on Construction Pay Estimates View Here
8/4/2020
1 Supplemental
e-Construction
Added 'LAP Project Considerations' to the section View Here
7/27/2020
1
102.02
Updated MDOT Production Rates link. Old link did not work properly. View Here
7/22/2020
1 Supplemental
FieldManager
Updated Content for Showing Detail Calculations on Inspector’s Daily Report and Added Rounding Convention Example Compare Here
6/30/2020
1 Supplemental
FPR Frequently Asked Questions
Added FPR Report User Guide link to FPR FAQ page Compare Here
6/30/2020
1 Supplemental
Final Project Review
Added FAQs link for Final Project Review to page Compare Here
6/24/2020
1 Supplemental
Project Closeout Escalation of Accountability
Added links to the new Final Project Review Report page Compare Here
6/17/2020
1 Supplemental
Certified Engineer Process
Reformatted the Certified Engineer Renewal Process for clarity Compare Here
6/9/2020
1 Supplemental
Final Project Review
Updated Final Project Review page with Interim File Review link Compare Here
06/01/2020
1 Supplemental
Certification Programs
Updated Engineer Record Certification List View Here
5/1/2020
1 Supplemental
Dispute Review Board (DRB)
Added updated DRB Procedures to include those let on and after 6-5-2020/Removed older links Compare Here
4/30/2020
1 Supplemental
Certified Office Technician Process
Edited page to reflect only Certified Technician Process information Compare Here
4/29/2020
1
109.07
Removed "Review of Prompt Payment Complaints" section as it's now its own page Compare Here
4/27/2020
1
101.04 Inspector Daily Reports
FieldManager
Updated Helpdesk number from 517-322-1556 to 1-844-4MI-MDOT (1-844-464-6368) in these sections along with the Main page Current News area above Compare Here
Compare Here
4/22/2020
1
102.18
Added the newly created Prompt Payment link to Section 102.18 Compare Here
4/15/2020
1
105.01
Changed Density Control Manual to Density Testing and Inspection Manual Compare Here
4/14/2020
1
105.01
Changed Density Control Handbook to Density Control Manual Compare Here
3/30/2020
1
107
Updated Jobsite Poster View Here
3/20/2020
1
105
Deleted information no longer applicable, or is covered in other documents/Renamed section due to changes Compare It
3/18/2020
1
108.01
Updated links to the new 1302-Fed form. Compare Here
2/21/2020
1
103.02
General Contract Modification Information Format Revision Compare It
2/13/2020
E-Construction
Standard Naming Convention for Documents
Updated Naming Convention Table to reflect recent changes. Also included updated PDF and XLSX files (Rev 2-13-20) Compare It
02/13/2020
1 Supplemental
Certified Engineer Process
Updated Engineer Record Certification List View Here
01/22/2020
Prevailing Wage Oversight Procedures
Jobsite Posting
Updated contact information on the Title VI Poster and Coordinator site information Compare It
11/12/2019
2
208
Soil Erosion and Sedimentation Control Notifications: Updated Notice of Coverage (NOC) and Notice of Termination (NOT) charts Compare It
10/29/2019
1 Supplemental
Indirect Testing Charges - Eligibility and Use
Updated first bullet information for clarity and to include examples Compare It
10/28/2019
1 Supplemental
Certified Engineer Process
Updated Engineer Record Certification List View Here
10/3/2019
8
811
Removal of references to outdated paint marking turn arrows Compare It
8/22/2019
1
107.09
Update related to the process for archeological findings Compare It
7/11/2019
2
208
Added 2 flowcharts for Notice of Coverage (NOC) and Notice of Termination (NOT) in section 208 between “Notification” and “Training”. Also updated language to reflect recent name change of the "Michigan Department of Environmental Quality (MDEQ)" to the "Michigan Department of Environment, Great Lakes, and Energy (EGLE)" Compare It

[top of page]


Preamble

This manual provides guidance to administrative, engineering, and technical staff. Engineering practice requires that professionals use a combination of technical skills and judgment in decision making. Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare. This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary. Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials. As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public. It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed. It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise. MDOT Leadership is committed to a culture of innovation to optimize engineering solutions. The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons. Those canons are provided below. Engineers, in the fulfillment of their professional duties, shall:

  1. Hold paramount the safety, health, and welfare of the public.
  2. Perform Services only in areas of their competence.
  3. Issue public statement only in an objective and truthful manner.
  4. Act for each employer or client as faithful agents or trustees.
  5. Avoid deceptive acts.
  6. Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession.


This manual has been revised throughout to incorporate changes brought about by the release of the 2012 Standard Specifications for Construction and by progress in equipment, construction practices, and materials. The format has been established to follow the standard specification outline with divisions and sections set up to facilitate revision and addition of new information as needed.


Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the Help:Contents page.


[top of page]