Difference between revisions of "Preconstruction Meeting"

From MDOT Wiki
Jump to: navigation, search
(Revised to to included Trunkline Boilerplate Preconstruction Meeting Minutes)
m (Added link for Local Agency Boilerplate Preconstruction Meeting Minutes)
Line 4: Line 4:
 
The following link contains the Trunkline Boilerplate Preconstruction Meeting Minutes:
 
The following link contains the Trunkline Boilerplate Preconstruction Meeting Minutes:
  
[[File:TRUNKLINE Boilerplate Preconstruction Meeting Minutes.docx]]
+
[http://mdotwiki.state.mi.us/construction/images/f/f8/TRUNKLINE_Boilerplate_Preconstruction_Meeting_Minutes.docx TRUNKLINE Boilerplate Preconstruction Meeting Minutes.docx]
  
 +
 +
The following link contains the Local Agency Boilerplate Preconstruction Meeting Minutes:
 +
 +
[http://mdotwiki.state.mi.us/construction/images/9/97/LOCAL_AGENCY_Boilerplate_Preconstruction_Meeting_Minutes_-_March_2019.docx LOCAL AGENCY Boilerplate Preconstruction Meeting Minutes.docx]
  
  

Revision as of 17:40, 19 March 2019

Spec Book Section 102
Email this Page

The following link contains the Trunkline Boilerplate Preconstruction Meeting Minutes:

TRUNKLINE Boilerplate Preconstruction Meeting Minutes.docx


The following link contains the Local Agency Boilerplate Preconstruction Meeting Minutes:

LOCAL AGENCY Boilerplate Preconstruction Meeting Minutes.docx


Preconstruction meeting minutes are to be recorded by the Construction\Project Engineer or their representative, sent to all attendees, and placed in projects ProjectWise construction folder in file 107 Preconstruction and Progress Meetings.


[top of page]


Personal tools
Namespaces

Variants
Actions
Navigation
Division 2 - Earthwork
Division 3 - Base Courses
Division 4 - Drainage Features
Division 5 - HMA Pavements and Surface Treatments
Division 6 - PCC Pavement Mixtures
Division 7 - Structures
Division 8 - Incidental Construction
Toolbox