Difference between revisions of "Revision Navigation"

From MDOT Wiki
Jump to: navigation, search
Line 18: Line 18:
 
!Division  !! Section !! Summary !! Link to Previous Version
 
!Division  !! Section !! Summary !! Link to Previous Version
 
|-  http://mdotwiki.state.mi.us/construction/index.php/
 
|-  http://mdotwiki.state.mi.us/construction/index.php/
|Division 7  ||[[718_-_Drilled_Shafts#Concrete.2C_Grade_S2.2C_and_Grade_T|<center>718</center>]] ||Text added to provide guidance and emphasis on modified slump requirements for drilled shaft foundations.
+
|Division 7  ||[[718_-_Drilled_Shafts#Concrete.2C_Grade_S2.2C_and_Grade_T|<center>718</center>]] ||Text added to provide guidance and emphasis on modified slump requirements for drilled shaft foundations.||[https://mdotwiki.state.mi.us/construction/index.php?title=718_-_Drilled_Shafts&oldid=3900 Previous Version]
 
|-
 
|-
 
|}
 
|}

Revision as of 16:23, 31 August 2016


Revision Navigation


Contents

Using View History Tab

MDOT's e-Construction Process on I-96


Comparing Versions

MDOT's e-Construction Process on I-96

Recent Major Changes

The table below is a list of Major changes.

Division Section Summary Link to Previous Version
Division 7
718
Text added to provide guidance and emphasis on modified slump requirements for drilled shaft foundations. Previous Version


A definition to the types of changes that you might see in the Construction Manual can be found under Content Revision Procedures, Types of Changes.

[top of page]


Recent Minor Changes

The table below is a list of Minor changes.

Division Section Summary Link to Previous Version
Division 1
107
Relocated existing Construction Manual Article to appropriate section Previous Version.

[top of page]


Personal tools
Namespaces

Variants
Actions
Navigation
Division 2 - Earthwork
Division 3 - Base Courses
Division 4 - Drainage Features
Division 5 - HMA Pavements and Surface Treatments
Division 6 - PCC Pavement Mixtures
Division 7 - Structures
Division 8 - Incidental Construction
Toolbox