Oldest pages
Jump to navigation
Jump to search
Showing below up to 250 results in range #1 to #250.
View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)
- (14:09, 28 January 2013)
- (10:57, 25 March 2013)
- Module:Documentation (09:28, 3 July 2014)
- Module:Namespace detect/data (09:28, 3 July 2014)
- Module:HtmlBuilder (09:28, 3 July 2014)
- Module:Message box/configuration (09:28, 3 July 2014)
- Module:Namespace detect/config (09:28, 3 July 2014)
- Module:Namespace detect (09:28, 3 July 2014)
- Module:Category handler (09:28, 3 July 2014)
- Module:Message box (09:28, 3 July 2014)
- Module:Yesno (09:28, 3 July 2014)
- Module:Arguments (09:28, 3 July 2014)
- Module:Documentation/config (09:28, 3 July 2014)
- 102.03 Interpretation of Bid Items in the Proposal (09:32, 11 April 2017)
- 102.04 Examination of Plans, Specifications, and Work Site (09:36, 11 April 2017)
- 102.06 Irregular Bids (10:03, 11 April 2017)
- 102.07 Delivery of Bid (10:04, 11 April 2017)
- 102.08 Withdrawal or Revision of Bid (10:06, 11 April 2017)
- 102.09 Downloading of Bids (10:08, 11 April 2017)
- 102.10 Bid Review (10:09, 11 April 2017)
- 102.11 Bid Rejection (10:10, 11 April 2017)
- 102.12 Bid Rejection Appeal (10:11, 11 April 2017)
- 102.13 Consideration of Bids (10:12, 11 April 2017)
- 103.01 Intent of the Contract (15:38, 11 April 2017)
- 103.03 Contractor Engineer Communication (15:52, 11 April 2017)
- 104.02 Plans and Working Drawings (07:48, 12 April 2017)
- 104.03 Deviations from the Plans (07:52, 12 April 2017)
- 104.04 Conformity with the Contrat (07:55, 12 April 2017)
- 104.05 Removal of Unauthorized Work (07:57, 12 April 2017)
- 104.06 Coordination of Drawing Dimensions and Contract Documentation (08:03, 12 April 2017)
- 104.08 Cooperation by the Contractor (08:10, 12 April 2017)
- 104.11 Work Zone Safety and Mobility (11:18, 12 April 2017)
- 104.12 Approval for Use of the Right of Way (11:21, 12 April 2017)
- 105.02 Natural Material Sources Found Within the Excavation Limits (09:44, 14 April 2017)
- 105.03 Borrow Materials (09:48, 14 April 2017)
- 105.04 Miscellameous Quantities (09:50, 14 April 2017)
- 105.05 Approval of Materials Incorporated into the Work (09:52, 14 April 2017)
- 105.06 Storage of Materials (09:54, 14 April 2017)
- 105.08 Nonconforming Materials (10:00, 14 April 2017)
- 105.09 Materials not Incorporated into the Work (10:05, 14 April 2017)
- 107.02 Permits and Licenses (08:05, 17 April 2017)
- 107.03 Patented Process and Materials (08:10, 17 April 2017)
- 107.04 Federal Aid Participation (08:12, 17 April 2017)
- 107.05 Sanitary Provisions (08:15, 17 April 2017)
- 107.07 Protection and Restoration of Property (08:20, 17 April 2017)
- 107.08 Land Monuments and Property Corners (08:25, 17 April 2017)
- 107.10 Indemnification, Damage Liability, and Insurance (08:38, 17 April 2017)
- 107.11 Contractor's Responsibility for the Work (08:41, 17 April 2017)
- 107.13 Personal Liability of Public Officials (08:49, 17 April 2017)
- 107.14 No Waiver of Legal Rights (08:54, 17 April 2017)
- 107.16 Forest Protection (09:00, 17 April 2017)
- 107.17 Use of Explosives (09:01, 17 April 2017)
- 107.18 Work over Navigable Waters (09:05, 17 April 2017)
- 107.20 Private Railroad Crossing for Haul Purposes (09:09, 17 April 2017)
- 108.02 Limitations of Operations (11:55, 17 April 2017)
- 108.03 Competence of Workers (11:57, 17 April 2017)
- 108.04 Adequacy of Methods and Equipment (11:59, 17 April 2017)
- 108.06 Determination of Contract Time for Work Day Contracts (12:03, 17 April 2017)
- 108.11 Default of Contract (13:26, 17 April 2017)
- 108.12 Termination of Contract (13:27, 17 April 2017)
- 102.05 Preparation of Bid Items in the Proposal (14:57, 18 April 2017)
- 109.06 Source of Supply and Carrier Rates on Materials (18:01, 18 April 2017)
- Table of Contents Division 1 (11:18, 17 May 2017)
- Table of Contents Division 1 Supplemental (14:34, 17 May 2017)
- 104.09 Lines, Grades, and Elevations (14:43, 19 June 2017)
- Contract Administration and Oversight Guidelines for Intelligent Transportation Systems (ITS) Projects (15:12, 19 June 2017)
- Hot Mix Asphalt Production Manual (15:14, 19 June 2017)
- 107.21 Open to Traffic (09:34, 23 October 2017)
- Projects with Incentive Provisions (09:34, 3 January 2018)
- Pavement Historical Database (09:37, 3 January 2018)
- Information Sharing About Construction Contractors and Consultants (09:41, 3 January 2018)
- Oversight of Maintenance Funded Projects Using the Michigan Department of Transportation Letting System (09:42, 3 January 2018)
- Construction Manual Wiki Tips (12:22, 7 May 2018)
- 107.19 Hauling on Local Roads and Streets (14:50, 25 June 2019)
- Plans, Proposal, Input, Review and Evaluation (11:29, 14 July 2020)
- 109.01 Measurement of Quantities (15:05, 6 May 2021)
- 109.02 Scope of Payment (15:06, 6 May 2021)
- 109.03 Payments for Increased or Decreased Quantities (15:06, 6 May 2021)
- FHWA CAP Action Plans (15:43, 6 May 2021)
- FPR Frequently Asked Questions (15:46, 6 May 2021)
- Interim File Review (15:47, 6 May 2021)
- Letter to File (15:48, 6 May 2021)
- Mandrel Testing of Plastic Pipe (16:06, 6 May 2021)
- 700 - Closure of Unsafe Structures (17:11, 6 May 2021)
- Division 7 Supplemental Information (16:38, 12 May 2021)
- 107.01 Laws to be Observed (17:20, 13 July 2021)
- Division 2 Supplemental Information (14:21, 23 September 2021)
- Division 4 Supplemental Information (14:29, 23 September 2021)
- 505 - Chip Seals (18:14, 15 December 2021)
- 502 - HMA Crack Treatment (18:15, 15 December 2021)
- 503 - Paver Placed Surface Seal (18:16, 15 December 2021)
- 504 - Micro-Surfacing (18:17, 15 December 2021)
- 506 - Slurry Seal (18:17, 15 December 2021)
- Final Project Review Report (08:57, 5 January 2022)
- 303 - Open Graded Drainage Course (16:43, 12 January 2022)
- 305 - HMA Base Crushing and Shaping (16:44, 12 January 2022)
- 306 - Aggregate Surface Course (16:58, 12 January 2022)
- 308 - Geotextiles for Base (16:59, 12 January 2022)
- 101 - Terms, Format, and Conditions (17:23, 12 January 2022)
- 104.01 Authority of the Department (17:28, 12 January 2022)
- 105.07 Handling and Transporting Materials (17:32, 12 January 2022)
- 106 - Quality Assurance Acceptance Program (17:34, 12 January 2022)
- 107.15 Compliance with Laws; Environmental Protection (17:36, 12 January 2022)
- 108.01 Subcontracting of Contract Work (17:38, 12 January 2022)
- 150 - Mobilization (17:42, 12 January 2022)
- 402 - Storm Sewers (17:47, 12 January 2022)
- 403 - Drainage Structures (17:47, 12 January 2022)
- 404 - Underdrain (17:47, 12 January 2022)
- 405 - Pump Station Construction (17:47, 12 January 2022)
- 406 - Precast Three-Sided, Arch, and Box Culverts (17:48, 12 January 2022)
- 701 - Portland Cement Concrete for Structures (11:43, 19 January 2022)
- 702 - Mortar and Grout (11:43, 19 January 2022)
- 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes (11:43, 19 January 2022)
- 708 - Prestressed Concrete (11:45, 19 January 2022)
- 711 - Bridge Railings (11:46, 19 January 2022)
- 712 - Bridge Rehabilitation, Concrete (11:46, 19 January 2022)
- 714 - Temporary Structures and Approaches (11:47, 19 January 2022)
- 716 - Shop Cleaning and Coating Structural Steel (11:47, 19 January 2022)
- 717 - Downspouts and Drains (11:48, 19 January 2022)
- 719 - Earth Retaining Structures (11:48, 19 January 2022)
- 801 - Concrete Driveways (11:49, 19 January 2022)
- 802 - Concrete Curb, Gutter, and Dividers (11:49, 19 January 2022)
- 803 - Concrete Sidewalk, Ramps, and Steps (11:50, 19 January 2022)
- 804 - Concrete Barriers and Glare Screens (11:50, 19 January 2022)
- 805 - Hot Mix Asphalt Curb (11:50, 19 January 2022)
- 806 - Bicycle Paths (12:41, 19 January 2022)
- 808 - Fencing (12:42, 19 January 2022)
- 809 - Field Office (12:42, 19 January 2022)
- 814 - Paved Ditches (12:44, 19 January 2022)
- 817 - Landscape Mowing (12:45, 19 January 2022)
- 821 - Preservation of Land Monuments and Property Corners (12:46, 19 January 2022)
- 822 - Ground or Cut Centerline and Shoulder Corrugations (12:47, 19 January 2022)
- 824 - Contractor Staking (12:47, 19 January 2022)
- Contract Administration and Oversight Guidelines for Projects Containing Warranty Work (14:44, 19 January 2022)
- Contractor's Equipment and Traffic Control (14:44, 19 January 2022)
- Extending Project Limits (14:54, 19 January 2022)
- Processing Sewage/Storm Water Damage Claims (15:47, 19 January 2022)
- Weight Limit Waivers (15:52, 19 January 2022)
- Work Order (15:52, 19 January 2022)
- 301 - Subbase (14:12, 16 February 2022)
- 304 - Rubbilizing Existing PCC Pavement (14:18, 16 February 2022)
- 302 - Aggregate Base Courses (14:24, 16 February 2022)
- Holiday Traffic Safety Provisions (12:33, 14 March 2022)
- Project Delays Due to a Utility Company (10:58, 4 May 2022)
- Process for Documenting Certified Materials in FieldManager (16:09, 25 May 2022)
- Dispute Review Board (DRB) (15:56, 11 July 2022)
- 307 - Aggregate Shoulders and Approaches (11:16, 21 July 2022)
- Section 701 - Portland Cement Concrete for Structures (13:11, 26 July 2022)
- 816 - Turf Establishment (13:12, 26 July 2022)
- Section 601 - Portland Cement Concrete for Pavements (13:21, 26 July 2022)
- 707 - Structural Steel (13:22, 26 July 2022)
- Table of Contents by Project Phase (15:18, 26 July 2022)
- 108.10 Liquidated Damages (10:01, 27 July 2022)
- Construction Value Engineering Change Proposal (VECP) (14:57, 11 October 2022)
- Project with Consultant Oversight (17:05, 7 February 2023)
- 108.08 Extension of Time on Calendar Day Contracts (09:52, 8 March 2023)
- 108.07 Extension of Time on Work Day Contracts (09:54, 8 March 2023)
- Dev Page (16:02, 8 March 2023)
- 815 - Landscaping (17:08, 27 March 2023)
- 201 - Clearing (12:01, 28 March 2023)
- 812 - Temporary Traffic Control for Construction Zone Operations (11:44, 29 March 2023)
- 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts (15:50, 6 April 2023)
- 713 - Bridge Rehabilitation, Steel (17:29, 10 April 2023)
- 109.08 Prompt Payment (11:03, 25 April 2023)
- 107.12 Contractor's Responsibility for Utility Property and Services (11:08, 25 April 2023)
- 718 - Drilled Shafts (11:40, 25 April 2023)
- 715 - Cleaning and Coating Existing Structural Steel (11:46, 25 April 2023)
- Quality Initiatives and Adjustments (10:05, 2 May 2023)
- Density Training Videos (13:03, 17 May 2023)
- 107.06 Furnishing Right-of-Way (11:59, 22 May 2023)
- 109.05 Payment for Contract Revisions (13:19, 6 June 2023)
- Force Account Work (17:31, 6 June 2023)
- 109.04 Progress and Partial Payments (09:22, 11 July 2023)
- Project Closeout Escalation of Accountability (11:05, 13 July 2023)
- 104.07 Contractor Obligations (11:18, 13 July 2023)
- Construction Technology Support Resources (10:57, 22 August 2023)
- FieldManager (11:03, 22 August 2023)
- 900 - Materials (09:41, 13 September 2023)
- 1001 - Concrete Production Equipment and Facilities (09:56, 13 September 2023)
- 1005 - Mortar and Grout Mixtures (09:57, 13 September 2023)
- 1006 - Patching, Repair, & Overlay Mixtures (09:57, 13 September 2023)
- 203 - Removing Drainage Structures, Culverts, and Sewers (10:05, 13 September 2023)
- 207 - Obliterating Roadway (10:06, 13 September 2023)
- 202 - Removing Trees, Stumps, and Corduroy (10:07, 13 September 2023)
- 204 - Removing Miscellaneous Structures and Materials (10:07, 13 September 2023)
- 206 - Excavation and Backfill for Structures (10:08, 13 September 2023)
- 209 - Project Cleanup (10:08, 13 September 2023)
- Division 3 Supplemental Information (10:14, 13 September 2023)
- 603 - Concrete Pavement Restoration (10:16, 13 September 2023)
- Preconstruction Meeting (11:18, 14 September 2023)
- 105.10 Buy America Source of Steel and Iron (07:32, 19 September 2023)
- 813 - Slope Protection (17:17, 19 September 2023)
- E-Signature (15:30, 20 September 2023)
- 105.01 Quality and Scope of Supply (14:44, 21 September 2023)
- 205 - Roadway Earthwork (14:45, 21 September 2023)
- MDOT DENSITY TESTING AND INSPECTION MANUAL (14:49, 21 September 2023)
- Notice of Non-Compliance with Contract Requirements (15:09, 26 September 2023)
- 102.01 Prequalification of Bidders (15:22, 26 September 2023)
- 823 - Water Mains (14:01, 27 September 2023)
- 401 - Culverts (12:56, 4 October 2023)
- 825 - Sanitary Sewer Systems (13:07, 4 October 2023)
- 102.19 Evaluation of Contractor Performance and Contract Non-Compliance (13:29, 4 October 2023)
- 102.14 Execution and Award of Contract (13:35, 4 October 2023)
- 102.15 Requirements of Contract Bonds (13:36, 4 October 2023)
- 102.16 Bid Guaranty Payment (13:37, 4 October 2023)
- 102.18 - OJT Program (13:40, 4 October 2023)
- 811 - Permanent Pavement Markings (17:48, 9 October 2023)
- Construction Field Services Indirect Testing Charges (08:12, 16 October 2023)
- Final Project Review (17:01, 6 November 2023)
- 1004 - Portland Cement Concrete Mixtures (16:41, 22 November 2023)
- 102.02 Contents of Proposal - Progress Clause (13:54, 29 November 2023)
- Certified Engineer Process (13:56, 29 November 2023)
- Local Agency Program (LAP) (18:40, 13 December 2023)
- Railroad Highway Projects (17:35, 14 December 2023)
- MDOT Construction Manual Content Revision Procedures (14:52, 19 December 2023)
- FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan) (15:37, 3 January 2024)
- 1002 - Contractor Quality Control for Concrete (17:23, 3 January 2024)
- 1003 - Quality Assurance (Acceptance) for Concrete (11:41, 10 January 2024)
- 709 - Timber Sturctures (16:33, 10 January 2024)
- Structural Fabrication Quality Manual (15:24, 11 January 2024)
- 109.07 Final Inspection, Acceptance, and Final Payment (15:37, 11 January 2024)
- Materials Quality Assurance Procedures Manual (17:52, 22 January 2024)
- Digital Calculations for Payment (12:47, 29 January 2024)
- 501 - Plant Produced Hot Mix Asphalt (15:08, 30 January 2024)
- 208 - Soil Erosion and Sedimentation Control (NPDES) (17:02, 15 February 2024)
- 710 - Waterproofing and Protective Covers (18:23, 15 February 2024)
- 706 - Structural Concrete (12:41, 27 February 2024)
- 705 - Foundation Piling (14:16, 29 February 2024)
- 108.05 Progress Schedule (14:27, 29 February 2024)
- 704 - Steel Sheet Piling and Cofferdams (15:44, 29 February 2024)
- Frequently Searched Items (14:39, 5 March 2024)
- 104.10 Claim for Extra Compensation or Extension of Time (12:08, 12 March 2024)
- Disadvantaged Business Enterprises (DBE) (14:51, 21 March 2024)
- 107.09 Archeological and Historical Findings (13:42, 1 April 2024)
- Prevailing Wage (14:09, 1 April 2024)
- 103.02 Contract Revisions (16:11, 1 April 2024)
- MDOT Construction Manual Style Guide (15:30, 2 April 2024)
- 810 - Permanent Traffic Signs and Supports (15:38, 2 April 2024)
- 819 - Electrical and Lighting (15:46, 2 April 2024)
- New CM Format Code (15:53, 2 April 2024)
- 820 - Traffic Signals (15:59, 2 April 2024)
- 826 – Intelligent Transportation Systems (16:07, 2 April 2024)
- Certified Office Technician Process (09:59, 3 April 2024)
- 807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts (10:53, 8 April 2024)
- CONSTRUCTION MANUAL CONTENT TEMPLATE (09:11, 11 April 2024)
- Main Page (17:18, 11 April 2024)
- 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) (14:31, 17 April 2024)
- E-Construction (16:49, 18 April 2024)
- 602 - Concrete Pavement Construction (17:27, 24 April 2024)
- Standard Naming Convention (13:43, 25 April 2024)