- 15:43, 6 June 2023 diff hist +306 Prevailing Wage →Wage Rate Interviews
- 15:41, 6 June 2023 diff hist 0 N File:Fraud and abuse card.jpg current
- 15:40, 6 June 2023 diff hist 0 N File:Sample Business Card.jpg current
- 15:28, 6 June 2023 diff hist -2 103.02 Contract Revisions →Contract Modification Item Type
- 15:27, 6 June 2023 diff hist +554 103.02 Contract Revisions →Contract Modification Item Type
- 15:22, 6 June 2023 diff hist 0 103.02 Contract Revisions →Contract Modification Item Type
- 15:22, 6 June 2023 diff hist +4 103.02 Contract Revisions →Contract Modification Item Type
- 15:21, 6 June 2023 diff hist -54 103.02 Contract Revisions →Contract Modification Item Type
- 15:20, 6 June 2023 diff hist +117 103.02 Contract Revisions →Contract Modification Item Type
- 15:19, 6 June 2023 diff hist 0 N File:WAUP.png current
- 15:17, 6 June 2023 diff hist +15 103.02 Contract Revisions →Contract Modification Item Type
- 15:16, 6 June 2023 diff hist +17 103.02 Contract Revisions →Contract Modification Item Type
- 15:16, 6 June 2023 diff hist +1 103.02 Contract Revisions →Contract Modification Item Type
- 15:15, 6 June 2023 diff hist -21 103.02 Contract Revisions /* Contract Modification Item Type *
- 15:14, 6 June 2023 diff hist +1,039 103.02 Contract Revisions →Contract Modification Item Type
- 14:03, 6 June 2023 diff hist +23 Materials Quality Assurance Procedures Manual
- 13:35, 6 June 2023 diff hist 0 103.02 Contract Revisions →Contract Modification Item Type
- 13:35, 6 June 2023 diff hist -153 103.02 Contract Revisions →Contract Modification Item Type
- 13:33, 6 June 2023 diff hist +1 103.02 Contract Revisions →Contract Modification Item Type
- 13:33, 6 June 2023 diff hist +113 103.02 Contract Revisions →Contract Modification Item Type
- 13:28, 6 June 2023 diff hist -69 103.02 Contract Revisions →Revisions to the Contract
- 13:26, 6 June 2023 diff hist -4 103.02 Contract Revisions →Revisions to the Contract
- 13:25, 6 June 2023 diff hist +8 103.02 Contract Revisions →Revisions to the Contract
- 13:19, 6 June 2023 diff hist +212 109.05 Payment for Contract Revisions →Negotiated Prices (109.05.C) current
- 10:02, 6 June 2023 diff hist 0 E-Signature →Transition to OneSpan
- 09:58, 6 June 2023 diff hist -3 E-Signature →Transition to OneSpan
- 09:58, 6 June 2023 diff hist +49 E-Signature →Transition to OneSpan
- 09:57, 6 June 2023 diff hist +34 E-Signature →Transition to OneSpan
- 09:57, 6 June 2023 diff hist 0 N File:1165 Signature Process.pdf current
- 09:55, 6 June 2023 diff hist +4 E-Signature →Transition to OneSpan
- 09:55, 6 June 2023 diff hist -3 E-Signature →Transition to OneSpan
- 09:54, 6 June 2023 diff hist +4 E-Signature →Transition to OneSpan
- 09:50, 6 June 2023 diff hist -1 E-Signature →#Transition to OneSpan
- 09:49, 6 June 2023 diff hist -1,746 E-Signature →Please note guidance listed in Construction Manual Inspector’s Daily Report. Note that the text stating (Signature) is legacy text associated with FieldManager and will not/can not be removed. A pdf review stamp is the mandatory review marking for this document. Transition to AASHTOWare Project will negate the need for this instruction as the Department moves away from FieldManager.
- 09:47, 6 June 2023 diff hist +1,985 E-Signature →#Transition to OneSpan
- 09:46, 6 June 2023 diff hist +10 E-Signature →#Transition to OneSpan
- 09:45, 6 June 2023 diff hist +29 E-Signature →#Transition to OneSpan
- 09:44, 6 June 2023 diff hist +145 E-Signature →#Transition to OneSpan
- 09:44, 6 June 2023 diff hist -11 E-Signature →#Transition to OneSpan
- 09:43, 6 June 2023 diff hist +3,100 E-Signature →Guidance for Non-MDOT Users
- 16:05, 1 June 2023 diff hist 0 Certified Engineer Process →Current Certified Engineers
- 16:04, 1 June 2023 diff hist 0 N File:Engineer certification list - JUNE 2023.jpg current
- 16:01, 1 June 2023 diff hist 0 Certified Engineer Process
- 15:57, 1 June 2023 diff hist 0 Certified Engineer Process →Current Certified Engineers
- 15:56, 1 June 2023 diff hist -2 Certified Engineer Process →Current Certified Engineers
- 15:55, 1 June 2023 diff hist -1 Certified Engineer Process →Current Certified Engineers
- 15:54, 1 June 2023 diff hist 0 N File:Engineer certification list - JUNE 2023.pdf current
- 15:46, 1 June 2023 diff hist +1 FieldManager →FieldManager
- 15:45, 1 June 2023 diff hist 0 FieldManager →Documenting Procedures for Live and Shadow Contracts
- 15:44, 1 June 2023 diff hist +1 FieldManager →MDOT Read-Only Files for Consultant Contracts
- 15:43, 1 June 2023 diff hist +1 FieldManager →Inspector's Daily Report (IDR)
- 08:45, 24 May 2023 diff hist +1 Main Page →Recent Major Changes
- 08:44, 24 May 2023 diff hist +212 Main Page →Recent Major Changes
- 08:36, 24 May 2023 diff hist +5 Prevailing Wage →Jobsite Postings
- 08:36, 24 May 2023 diff hist +8 Prevailing Wage →Jobsite Postings
- 08:35, 24 May 2023 diff hist +5 Prevailing Wage →Jobsite Postings
- 08:35, 24 May 2023 diff hist +8 Prevailing Wage →Jobsite Postings
- 08:35, 24 May 2023 diff hist +15 Prevailing Wage →Jobsite Postings
- 08:34, 24 May 2023 diff hist -1 Prevailing Wage →Jobsite Postings
- 08:34, 24 May 2023 diff hist 0 N File:107.01 - Jobsite Post Fig 1.png current
- 08:33, 24 May 2023 diff hist 0 Prevailing Wage →Jobsite Postings
- 08:33, 24 May 2023 diff hist 0 N File:107.01 - Jobsite Post Fig 2B.png current
- 08:31, 24 May 2023 diff hist 0 File:107.01 - Jobsite Post Fig 2.png Clarkj25 uploaded a new version of File:107.01 - Jobsite Post Fig 2.png current
- 08:28, 24 May 2023 diff hist 0 N File:107.01 - Jobsite Post Fig 2.png
- 08:27, 24 May 2023 diff hist +4 Prevailing Wage →Jobsite Postings
- 08:27, 24 May 2023 diff hist +3 Prevailing Wage →Jobsite Postings
- 08:27, 24 May 2023 diff hist +2 Prevailing Wage →Jobsite Postings
- 08:26, 24 May 2023 diff hist -1 Prevailing Wage →Jobsite Postings
- 08:26, 24 May 2023 diff hist 0 N File:107.01 - Jobsite Post Fig 3.png current
- 08:21, 24 May 2023 diff hist 0 N File:107.01 - Jobsite Post Fig. 3.png current
- 11:59, 22 May 2023 diff hist +278 107.06 Furnishing Right-of-Way current
- 16:50, 18 May 2023 diff hist -2 Main Page →Recent Major Changes
- 16:50, 18 May 2023 diff hist -7 Main Page →Recent Major Changes
- 16:49, 18 May 2023 diff hist -67 Main Page →Recent Major Changes
- 16:46, 18 May 2023 diff hist +427 Main Page →Recent Major Changes
- 16:44, 18 May 2023 diff hist +116 107.06 Furnishing Right-of-Way
- 16:43, 18 May 2023 diff hist +140 107.06 Furnishing Right-of-Way →DOCUMENTING PRICE NEGOTIATIONS
- 16:42, 18 May 2023 diff hist +3,212 107.06 Furnishing Right-of-Way
- 13:06, 17 May 2023 diff hist +109 205 - Roadway Earthwork →Controlled Density Method
- 13:03, 17 May 2023 diff hist +148 N Density Training Videos Created page with " [https://f.io/5DDMalFG In-Place Density Test] [https://f.io/jHIqBv4H Michigan One-Point Cone Test] [https://f.io/l_VzUeaV One-Point T99 Test]" current
- 11:00, 17 May 2023 diff hist -1 Force Account Work →FORCE ACCOUNT WORK
- 10:59, 17 May 2023 diff hist +75 Force Account Work →FORCE ACCOUNT WORK
- 10:57, 17 May 2023 diff hist +273 Force Account Work →FORCE ACCOUNT WORK
- 10:49, 17 May 2023 diff hist 0 103.02 Contract Revisions →Revisions to the Contract
- 10:48, 17 May 2023 diff hist +10 103.02 Contract Revisions →Revisions to the Contract
- 10:47, 17 May 2023 diff hist +196 103.02 Contract Revisions →Revisions to the Contract
- 09:34, 16 May 2023 diff hist +427 Force Account Work →Equipment listed in the Blue Book (EquipmentWatch)
- 23:38, 10 May 2023 diff hist +175 204 - Removing Miscellaneous Structures and Materials →Vertical Exploratory Investigation for Relocation
- 23:37, 10 May 2023 diff hist -6 204 - Removing Miscellaneous Structures and Materials →Vertical Exploratory Investigation for Relocation
- 23:35, 10 May 2023 diff hist +1,397 204 - Removing Miscellaneous Structures and Materials →CONSTRUCTION
- 13:11, 10 May 2023 diff hist -338 109.07 Final Inspection, Acceptance, and Final Payment →Compliance
- 10:05, 2 May 2023 diff hist +41 Quality Initiatives and Adjustments →Traf Control Quality and Compliance Adjustment current
- 10:02, 2 May 2023 diff hist +48 Quality Initiatives and Adjustments →Open Graded Drainage Course Adjustment
- 09:59, 2 May 2023 diff hist +66 Quality Initiatives and Adjustments →Soil Erosion and Sedimentation Control Adjustment
- 09:56, 2 May 2023 diff hist +18 Quality Initiatives and Adjustments →Jobsite Poster Compliance Adjustment
- 11:46, 25 April 2023 diff hist 0 715 - Cleaning and Coating Existing Structural Steel →Warranty on Bridge Coating current
- 11:44, 25 April 2023 diff hist +33 715 - Cleaning and Coating Existing Structural Steel →Lead Awareness Training
- 11:40, 25 April 2023 diff hist -211 718 - Drilled Shafts →Concrete, Grade S2, and Grade T current
- 11:34, 25 April 2023 diff hist +71 208 - Soil Erosion and Sedimentation Control (NPDES) →Non-Compliance of SESC
- 11:17, 25 April 2023 diff hist +376 105.01 Quality and Scope of Supply
- 11:10, 25 April 2023 diff hist +1 105.01 Quality and Scope of Supply
- 11:09, 25 April 2023 diff hist -4 105.01 Quality and Scope of Supply
- 11:08, 25 April 2023 diff hist -301 107.12 Contractor's Responsibility for Utility Property and Services →MDOT Freeway Lighting and ITS Staking Request current
- 11:03, 25 April 2023 diff hist 0 109.08 Prompt Payment →Prompt Payment current
- 11:01, 25 April 2023 diff hist -141 819 - Electrical and Lighting →Electrical and Lighting Conduit
- 10:52, 25 April 2023 diff hist +75 102.02 Contents of Proposal - Progress Clause →Progress Clause
- 10:49, 25 April 2023 diff hist +51 102.02 Contents of Proposal - Progress Clause →Progress Clause
- 10:15, 24 April 2023 diff hist +205 105.10 Buy America Source of Steel and Iron
- 10:12, 24 April 2023 diff hist -3 105.10 Buy America Source of Steel and Iron
- 10:11, 24 April 2023 diff hist -84 105.10 Buy America Source of Steel and Iron
- 16:17, 18 April 2023 diff hist +333 Main Page →Recent Major Changes
- 15:45, 18 April 2023 diff hist -1 208 - Soil Erosion and Sedimentation Control (NPDES) →CONSTRUCTION
- 15:42, 18 April 2023 diff hist 0 208 - Soil Erosion and Sedimentation Control (NPDES) →CONSTRUCTION
- 15:41, 18 April 2023 diff hist +328 208 - Soil Erosion and Sedimentation Control (NPDES) →CONSTRUCTION
- 15:36, 18 April 2023 diff hist 0 N File:SESC Pocket Guide.png current
- 15:33, 18 April 2023 diff hist +296 208 - Soil Erosion and Sedimentation Control (NPDES) →CONSTRUCTION
- 15:32, 18 April 2023 diff hist +90 208 - Soil Erosion and Sedimentation Control (NPDES) →CONSTRUCTION
- 15:27, 18 April 2023 diff hist -1 Main Page →Recent Major Changes
- 15:27, 18 April 2023 diff hist 0 Main Page →Recent Major Changes
- 15:26, 18 April 2023 diff hist +293 Main Page →Recent Major Changes
- 15:20, 18 April 2023 diff hist +2 FieldManager →Inspector's Daily Report (IDR)
- 15:19, 18 April 2023 diff hist +210 FieldManager →Inspector's Daily Report (IDR)
- 13:51, 18 April 2023 diff hist -19 FieldManager →Inspector's Daily Report (IDR)
- 13:45, 18 April 2023 diff hist -17 FieldManager →Inspector's Daily Report (IDR)
- 13:42, 18 April 2023 diff hist -20 FieldManager →Bi-Annual FieldManager User Account Verification Process
- 13:37, 18 April 2023 diff hist +15 FieldManager →Inspector's Daily Report (IDR)
- 13:32, 18 April 2023 diff hist +13 FieldManager →Inspector's Daily Report (IDR)
- 13:29, 18 April 2023 diff hist 0 N File:IDR3.png current
- 13:29, 18 April 2023 diff hist 0 N File:IDR2.png current
- 13:29, 18 April 2023 diff hist 0 N File:IDR1.png current
- 09:35, 18 April 2023 diff hist +155 FieldManager →Inspector's Daily Report (IDR)
- 09:27, 18 April 2023 diff hist +1 FieldManager →Inspector's Daily Report (IDR)
- 09:27, 18 April 2023 diff hist 0 N File:Figure 101.04-1 stamp example2.png current
- 09:25, 18 April 2023 diff hist 0 FieldManager →Inspector's Daily Report (IDR)
- 09:25, 18 April 2023 diff hist 0 File:Figure 101.04-1 stamp example.png Clarkj25 uploaded a new version of File:Figure 101.04-1 stamp example.png current
- 09:23, 18 April 2023 diff hist +87 FieldManager →Inspector's Daily Report (IDR)
- 09:21, 18 April 2023 diff hist 0 N File:Figure 101.04-1 stamp example.png
- 09:01, 18 April 2023 diff hist -4 FieldManager →Inspector's Daily Report (IDR)
- 08:59, 18 April 2023 diff hist 0 N File:Figure 101.04-1cont stamp.png current
- 08:55, 18 April 2023 diff hist 0 File:Figure 101.04-1cont E-Signed.png Clarkj25 uploaded a new version of File:Figure 101.04-1cont E-Signed.png current
- 08:52, 18 April 2023 diff hist 0 File:Figure 101.04-1cont E-Signed.png Clarkj25 uploaded a new version of File:Figure 101.04-1cont E-Signed.png
- 08:47, 18 April 2023 diff hist 0 File:Figure 101.04-1cont E-Signed.png Clarkj25 uploaded a new version of File:Figure 101.04-1cont E-Signed.png
- 16:27, 13 April 2023 diff hist -197 Certified Engineer Process →Certified Engineer Application Requirements
- 09:03, 13 April 2023 diff hist +59 Certified Engineer Process →Certified Engineer Application Requirements
- 17:29, 10 April 2023 diff hist -74 713 - Bridge Rehabilitation, Steel →Column Type current
- 17:28, 10 April 2023 diff hist +31 713 - Bridge Rehabilitation, Steel →Column Type
- 15:50, 6 April 2023 diff hist -362 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts →Routing of Form 1100A current
- 09:24, 6 April 2023 diff hist -31 205 - Roadway Earthwork →Controlled Density Method
- 09:23, 6 April 2023 diff hist +166 205 - Roadway Earthwork →Controlled Density Method
- 11:42, 5 April 2023 diff hist +87 Force Account Work →Guidelines to submit Force Account Work – Contractor’s Field Documentation
- 11:38, 5 April 2023 diff hist +35 Force Account Work →FORCE ACCOUNT WORK
- 11:37, 5 April 2023 diff hist -848 109.05 Payment for Contract Revisions
- 11:31, 5 April 2023 diff hist -40,984 109.05 Payment for Contract Revisions →FORCE ACCOUNT WORK
- 11:27, 5 April 2023 diff hist +35 109.05 Payment for Contract Revisions →FORCE ACCOUNT WORK
- 11:05, 5 April 2023 diff hist +125 Prevailing Wage →Jobsite Postings
- 09:18, 4 April 2023 diff hist +2 Prevailing Wage →Additional Information
- 14:09, 3 April 2023 diff hist +5 FieldManager →FieldManager
- 14:07, 3 April 2023 diff hist 0 Prevailing Wage →Multiple Wage Decisions
- 08:52, 3 April 2023 diff hist +48 Final Project Review →Final Project Review Package
- 08:49, 3 April 2023 diff hist +30 Final Project Review →Review Findings
- 08:46, 3 April 2023 diff hist -9 Final Project Review →Materials Review
- 08:45, 3 April 2023 diff hist +4 Final Project Review →Review Teams
- 11:44, 29 March 2023 diff hist -722 812 - Temporary Traffic Control for Construction Zone Operations →CONSTRUCTION current
- 11:36, 29 March 2023 diff hist +1 208 - Soil Erosion and Sedimentation Control (NPDES) →Contractor Obligation
- 10:25, 29 March 2023 diff hist 0 File:TRUNKLINE Boilerplate Preconstruction Meeting Minutes - March 2023.docx Clarkj25 uploaded a new version of File:TRUNKLINE Boilerplate Preconstruction Meeting Minutes - March 2023.docx current
- 10:24, 29 March 2023 diff hist 0 File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - March 2023.docx Clarkj25 uploaded a new version of File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - March 2023.docx current
- 12:21, 28 March 2023 diff hist +87 204 - Removing Miscellaneous Structures and Materials →CONSTRUCTION
- 12:07, 28 March 2023 diff hist +96 203 - Removing Drainage Structures, Culverts, and Sewers →CONSTRUCTION
- 12:05, 28 March 2023 diff hist +204 202 - Removing Trees, Stumps, and Corduroy →MEASUREMENT AND PAYMENT
- 12:01, 28 March 2023 diff hist +204 201 - Clearing →CONSTRUCTION current
- 11:59, 28 March 2023 diff hist +247 201 - Clearing →GENERAL
- 11:52, 28 March 2023 diff hist +182 201 - Clearing →GENERAL
- 10:04, 28 March 2023 diff hist 0 File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - March 2023.docx Clarkj25 uploaded a new version of File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - March 2023.docx
- 10:03, 28 March 2023 diff hist 0 File:TRUNKLINE Boilerplate Preconstruction Meeting Minutes - March 2023.docx Clarkj25 uploaded a new version of File:TRUNKLINE Boilerplate Preconstruction Meeting Minutes - March 2023.docx
- 17:08, 27 March 2023 diff hist +117 815 - Landscaping →GENERAL current
- 17:05, 27 March 2023 diff hist 0 815 - Landscaping →Unacceptable Plants
- 17:03, 27 March 2023 diff hist +33 815 - Landscaping →CONSTRUCTION
- 16:48, 27 March 2023 diff hist +66 815 - Landscaping →Unacceptable Plants
- 14:07, 23 March 2023 diff hist +79 109.05 Payment for Contract Revisions →Statements
- 17:17, 22 March 2023 diff hist -9 Certified Engineer Process →Current Certified Engineers
- 17:16, 22 March 2023 diff hist 0 N File:Engineer certification list - MARCH 2023.jpg current
- 17:11, 22 March 2023 diff hist 0 N File:Engineer certification list - MARCH 2023.pdf current
- 16:02, 20 March 2023 diff hist -9 Prevailing Wage →Additional Information
- 16:01, 20 March 2023 diff hist 0 N File:107.01 Laws to be Observed - MDOT Deficient-Notice-1.docx current
- 14:44, 20 March 2023 diff hist +364 Main Page →Recent Major Changes
- 14:39, 20 March 2023 diff hist -14 E-Signature →Guidance for Non-MDOT Users
- 14:38, 20 March 2023 diff hist +59 E-Signature →Guidance for Non-MDOT Users
- 14:38, 20 March 2023 diff hist -327 E-Signature →Guidance for Non-MDOT Users
- 14:35, 20 March 2023 diff hist -1,855 E-Signature →Adoption at MDOT and Acceptable Uses
- 14:17, 20 March 2023 diff hist +1 Main Page →Recent Major Changes
- 14:16, 20 March 2023 diff hist +286 Main Page →Recent Major Changes
- 14:13, 20 March 2023 diff hist +20 Preconstruction Meeting →Trunkline Boilerplate Preconstruction Meeting Minutes
- 14:13, 20 March 2023 diff hist 0 N File:TRUNKLINE Boilerplate Preconstruction Meeting Minutes - March 2023.docx
- 14:12, 20 March 2023 diff hist +11 Preconstruction Meeting →LAP Project Considerations
- 14:11, 20 March 2023 diff hist 0 N File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - March 2023.docx
- 13:10, 20 March 2023 diff hist -99 Prevailing Wage →Additional Information
- 13:04, 20 March 2023 diff hist -8 Prevailing Wage →Additional Information
- 12:58, 20 March 2023 diff hist +152 Prevailing Wage →Additional Information
- 15:59, 15 March 2023 diff hist -79 MDOT Construction Manual Content Revision Procedures →Construction Manual Change Process
- 15:32, 15 March 2023 diff hist +1 103.02 Contract Revisions →General Contract Modification Information
- 15:31, 15 March 2023 diff hist 0 N File:2023 ACEC Presentation - Contract Mods2.pdf current
- 13:04, 15 March 2023 diff hist +52 Final Project Review →Further Information on Final Project Review
- 11:41, 15 March 2023 diff hist 0 N File:2023 ACEC Presentation - File Reviews.pdf current
- 11:09, 15 March 2023 diff hist +209 Final Project Review →FAQs for Final Project Review
- 09:34, 15 March 2023 diff hist +1 103.02 Contract Revisions →General Contract Modification Information
- 09:31, 15 March 2023 diff hist +1 103.02 Contract Revisions →General Contract Modification Information
- 09:28, 15 March 2023 diff hist +7 103.02 Contract Revisions →General Contract Modification Information
- 09:27, 15 March 2023 diff hist +1 103.02 Contract Revisions →General Contract Modification Information
- 09:27, 15 March 2023 diff hist +48 103.02 Contract Revisions →General Contract Modification Information
- 09:24, 15 March 2023 diff hist -2 103.02 Contract Revisions →General Contract Modification Information
- 09:23, 15 March 2023 diff hist +48 103.02 Contract Revisions →General Contract Modification Information
- 09:21, 15 March 2023 diff hist +199 103.02 Contract Revisions →Generating Contract Modifications
- 09:17, 15 March 2023 diff hist 0 N File:2023 ACEC Presentation - Contract Mods.pdf current
- 16:02, 8 March 2023 diff hist -15 Dev Page →Recent Minor Changes current
- 10:02, 8 March 2023 diff hist +462 Main Page →Recent Major Changes
- 09:54, 8 March 2023 diff hist -7,588 108.07 Extension of Time on Work Day Contracts Replaced content with "<span style=color:red>There is no further content, see Spec Book and 108.09_Request_for_Time_Extensions_on_Work_Day,_Calendar_Day,_and_Calendar_Date_Contracts.</span>..." current Tag: Replaced
- 09:52, 8 March 2023 diff hist +98 108.08 Extension of Time on Calendar Day Contracts current
- 09:49, 8 March 2023 diff hist +77 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts →LAP Project Considerations
- 09:48, 8 March 2023 diff hist +7,729 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts
- 09:39, 8 March 2023 diff hist +8 Main Page →Recent Minor Changes
- 09:39, 8 March 2023 diff hist +360 Main Page →Recent Minor Changes
- 09:32, 8 March 2023 diff hist 0 104.10 Claim for Extra Compensation or Extension of Time →General
- 13:59, 7 March 2023 diff hist -11 Main Page →Recent Minor Changes
- 13:59, 7 March 2023 diff hist +397 Main Page →Recent Minor Changes
- 13:51, 7 March 2023 diff hist +3 m 103.02 Contract Revisions →Contract Revisions - See Also
- 13:50, 7 March 2023 diff hist 0 N File:Appendix A - Approval Path Flow Chart UPDATED 3-7-23 Final.pdf current
- 17:10, 2 March 2023 diff hist -726 108.07 Extension of Time on Work Day Contracts →Routing of Form 1100A
- 09:42, 1 March 2023 diff hist +5 103.02 Contract Revisions →Contract Revisions - See Also
- 09:41, 1 March 2023 diff hist 0 N File:Appendix A - Approval Path Flow Chart UPDATED 2022 ver2.pdf current
- 09:36, 1 March 2023 diff hist 0 N File:Appendix A-2023.jpg current
- 11:44, 16 February 2023 diff hist +25 103.02 Contract Revisions →Contract Revisions - See Also
- 11:42, 16 February 2023 diff hist 0 N File:Appendix A - Approval Path Flow Chart UPDATED 2022.pdf current
- 18:32, 23 January 2023 diff hist 0 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 18:30, 23 January 2023 diff hist 0 N File:MI S&O RPI S O Plan Mound INFRA Zachary 2023.pdf current
- 18:24, 23 January 2023 diff hist -4 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 18:23, 23 January 2023 diff hist 0 N File:FHWA RBPI 2023.jpg current
- 18:19, 23 January 2023 diff hist +149 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 13:15, 12 January 2023 diff hist +476 Main Page
- 09:29, 12 December 2022 diff hist +377 107.09 Archeological and Historical Findings
- 14:15, 5 December 2022 diff hist -33 Certified Engineer Process →Certified Engineer Renewal Process
- 14:14, 5 December 2022 diff hist -1 Certified Engineer Process →Certified Engineer Review Audits
- 14:14, 5 December 2022 diff hist -32 Certified Engineer Process →Certified Engineer Application Requirements
- 14:13, 5 December 2022 diff hist +2 Certified Engineer Process →Certified Engineer Renewal Process
- 14:12, 5 December 2022 diff hist +83 Certified Engineer Process →Certified Engineer Application Requirements
- 14:11, 5 December 2022 diff hist +15 Certified Engineer Process →Certified Engineer Application Requirements
- 14:09, 5 December 2022 diff hist +17 Certified Engineer Process →Certified Engineer Application Requirements
- 16:51, 23 November 2022 diff hist -58 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 10:47, 22 November 2022 diff hist -226 FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
- 13:32, 10 November 2022 diff hist +363 Main Page →Recent Minor Changes
- 13:25, 10 November 2022 diff hist +704 109.05 Payment for Contract Revisions →Labor