User contributions
Jump to navigation
Jump to search
- 15:15, 20 November 2018 diff hist 0 N File:Inspection Tips1.png current
- 14:07, 20 November 2018 diff hist +259 Dev Page
- 14:24, 8 November 2018 diff hist -1,046 Dev Page →Pending Changes: Testing
- 13:47, 8 November 2018 diff hist +24,460 m Dev Page Testing
- 18:25, 7 November 2018 diff hist +266 Main Page →Recent Major Changes: Updated change table to reflect addition of Preconstruction Meeting Boilerplate
- 18:20, 7 November 2018 diff hist -6,459 Preconstruction Meeting Revised to to included Trunkline Boilerplate Preconstruction Meeting Minutes
- 14:26, 29 October 2018 diff hist 0 N File:TRUNKLINE Boilerplate Preconstruction Meeting Minutes.docx
- 10:10, 26 October 2018 diff hist -1 m 811 - Permanent Pavement Markings →Uniform Price Adjustment, Regular Dry Paint and Low Temperature Waterborne Paint
- 09:37, 26 October 2018 diff hist -416 m 811 - Permanent Pavement Markings →Uniform Price Adjustment, Regular Dry Paint and Low Temperature Waterborne Paint: Removed Pricing for 2005 and 2006. Retaining only a decade of pricing information (MB)
- 09:27, 26 October 2018 diff hist +339 m Main Page →Recent Major Changes: Updated Change Table to included recent update for Paint Pricing 2018
- 09:21, 26 October 2018 diff hist +217 811 - Permanent Pavement Markings →Uniform Price Adjustment, Regular Dry Paint and Low Temperature Waterborne Paint: Updated Paint Pricing for 2018
- 14:00, 19 September 2018 diff hist +225 104.10 Claim for Extra Compensation or Extension of Time →MICHIGAN DEPARTMENT OF TRANSPORTATION CLAIMS PROCEDURE (Revised 2016)
- 13:53, 19 September 2018 diff hist +64 N File:MDOT Construction Contractor Claims Procedure September 2018.pdf MDOT Construction Contractor Claims Procedure September 2018.pdf
- 13:39, 19 September 2018 diff hist +136 m E-Construction →General Procedures for Construction Records Retention: Adding Record Retention Procedure provided by Mo Azam as requested
- 13:33, 19 September 2018 diff hist +71 N File:Construction Records Transmittal and Retrieval Procedures For MDOT TSCs.pdf Construction Records Transmittal and Retrieval Procedures For MDOT TSCs current
- 13:41, 13 September 2018 diff hist +344 m Main Page →Recent Major Changes: Updated Recent Major Change Table to reflect changes to MQAP Manual part of CMU 2018-001
- 13:32, 13 September 2018 diff hist +5,314 Materials Quality Assurance Procedures Manual Revision related to CMU 2018-001 (Material Quality Assurance Procedures Manual revisions)
- 11:05, 6 September 2018 diff hist +340 m Main Page →Recent Minor Changes: Upated Recent Minor Change Table to reflect change to Supplemental 1 (FieldManager) - IDRS
- 13:50, 5 September 2018 diff hist +39 m Main Page Updated Cover Picture on Main Page
- 13:48, 5 September 2018 diff hist +88 N File:DI-06570-091.jpg US-131 10 Mile to 14 Mile Rd construction in Kent County. placing cement treated subbase current
- 11:27, 30 August 2018 diff hist +279 m Main Page →Recent Minor Changes: Updated Minor Changes Table to reflect recent change related to updating the Engineer Record Certification List
- 11:18, 30 August 2018 diff hist 0 m Certified Office Technician Process →Engineer Certification Program: Updated Engineer Certification List
- 11:16, 30 August 2018 diff hist 0 N File:Eng Record Cert list 08-30-18.pdf
- 11:10, 30 August 2018 diff hist 0 File:Eng Record Cert list 12-19-17.pdf McGowanR uploaded a new version of "File:Eng Record Cert list 12-19-17.pdf" current
- 16:01, 29 August 2018 diff hist -137 m FieldManager →Inspector's Daily Report (IDR): Edit verbiage for conciseness
- 15:07, 22 August 2018 diff hist -3 Retention Schedule Redirected page to E-Construction#e-Construction.2FPaper File System current
- 15:04, 22 August 2018 diff hist -16 Retention Schedule Redirected page to Records Retention#e-Construction.2FPaper File System
- 15:00, 22 August 2018 diff hist +82 N Retention Schedule Redirected page to E-Construction#General Procedures for Construction Records Retention
- 14:58, 22 August 2018 diff hist +82 N Records Retention Redirected page to E-Construction#General Procedures for Construction Records Retention current
- 14:53, 22 August 2018 diff hist +69 N Standard Naming Convention for Documents Redirected page to E-Construction#Standard Naming Convention for Documents current
- 14:50, 22 August 2018 diff hist +14 Naming Convention Redirected page to E-Construction#Standard Naming Convention for Documents current
- 14:49, 22 August 2018 diff hist +55 N Naming Convention Redirected page to #Standard Naming Convention for Documents
- 14:05, 22 August 2018 diff hist +68 N Pay Estimates Redirected page to 109.07 Final Inspection, Acceptance, and Final Payment current
- 14:21, 21 August 2018 diff hist +40 m Local Agency Program (LAP) →Project Administration: Economic Development Direct Grant Projects: Updated Heading for this section
- 14:01, 21 August 2018 diff hist +1,375 Dev Page Test
- 14:13, 2 August 2018 diff hist +82 Construction Technology Support Resources
- 12:50, 19 June 2018 diff hist +1 E-Construction
- 12:22, 19 June 2018 diff hist -1 E-Construction →Accessing MDOT's DataSource
- 12:21, 19 June 2018 diff hist +133 m E-Construction Updated Link for users to locate and download ProjectWise Explorer (SL)
- 11:30, 19 June 2018 diff hist -53 E-Construction Removed CPM note in table part of Section 101 - CPM FUSP already specifies the current naming convention for CPM submittals (BD)
- 11:07, 18 June 2018 diff hist +99 m Construction Technology Support Resources Adding Contacts for CFS
- 10:30, 18 June 2018 diff hist +248 N Construction Technology Support Resources Created page with " [http://www.michigan.gov/documents/C&Tcontacts_50297_7.pdf Construction & Technology Contacts] [http://www.michigan.gov/mdot/0,1607,7-151-9625_78316---,00.html CoSign] [h..."
- 16:28, 6 June 2018 diff hist -20,000 Dev Page Replaced content with "This page is for testing purposes"
- 16:27, 6 June 2018 diff hist +3 Dev Page →Current News
- 16:23, 6 June 2018 diff hist 0 Dev Page →Current News
- 16:21, 6 June 2018 diff hist -42 Dev Page →Current News
- 16:20, 6 June 2018 diff hist -22 Dev Page
- 16:19, 6 June 2018 diff hist +20,038 Dev Page
- 15:43, 6 June 2018 diff hist +14 m Main Page Updated new image with File:DI-06414-080.jpg [Pouring concrete on the I-75 Rouge River project]
- 15:38, 6 June 2018 diff hist +48 N File:DI-06414-080.jpg Pouring concrete on the I-75 Rouge River project current