Pages with the fewest revisions

Jump to navigation Jump to search

Showing below up to 250 results in range #1 to #250.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

  1. 104.04 Conformity with the Contrat‏‎ (1 revision)
  2. 107.05 Sanitary Provisions‏‎ (1 revision)
  3. 108.11 Default of Contract‏‎ (1 revision)
  4. Pavement Historical Database‏‎ (1 revision)
  5. Projects with Incentive Provisions‏‎ (1 revision)
  6. 102.06 Irregular Bids‏‎ (1 revision)
  7. 104.05 Removal of Unauthorized Work‏‎ (1 revision)
  8. 107.07 Protection and Restoration of Property‏‎ (1 revision)
  9. 108.12 Termination of Contract‏‎ (1 revision)
  10. Oversight of Maintenance Funded Projects Using the Michigan Department of Transportation Letting System‏‎ (1 revision)
  11. Information Sharing About Construction Contractors and Consultants‏‎ (1 revision)
  12. 102.07 Delivery of Bid‏‎ (1 revision)
  13. 104.06 Coordination of Drawing Dimensions and Contract Documentation‏‎ (1 revision)
  14. 107.08 Land Monuments and Property Corners‏‎ (1 revision)
  15. 109.06 Source of Supply and Carrier Rates on Materials‏‎ (1 revision)
  16. New CM Format Code‏‎ (1 revision)
  17. 102.08 Withdrawal or Revision of Bid‏‎ (1 revision)
  18. 104.08 Cooperation by the Contractor‏‎ (1 revision)
  19. 107.10 Indemnification, Damage Liability, and Insurance‏‎ (1 revision)
  20. 107.21 Open to Traffic‏‎ (1 revision)
  21. 102.09 Downloading of Bids‏‎ (1 revision)
  22. 104.11 Work Zone Safety and Mobility‏‎ (1 revision)
  23. 107.11 Contractor's Responsibility for the Work‏‎ (1 revision)
  24. 102.18 - OJT Program‏‎ (1 revision)
  25. 102.10 Bid Review‏‎ (1 revision)
  26. 104.12 Approval for Use of the Right of Way‏‎ (1 revision)
  27. 107.13 Personal Liability of Public Officials‏‎ (1 revision)
  28. 102.11 Bid Rejection‏‎ (1 revision)
  29. 105.02 Natural Material Sources Found Within the Excavation Limits‏‎ (1 revision)
  30. 107.14 No Waiver of Legal Rights‏‎ (1 revision)
  31. 102.12 Bid Rejection Appeal‏‎ (1 revision)
  32. 105.03 Borrow Materials‏‎ (1 revision)
  33. 107.16 Forest Protection‏‎ (1 revision)
  34. 102.13 Consideration of Bids‏‎ (1 revision)
  35. 105.04 Miscellameous Quantities‏‎ (1 revision)
  36. 107.17 Use of Explosives‏‎ (1 revision)
  37. 105.05 Approval of Materials Incorporated into the Work‏‎ (1 revision)
  38. 107.18 Work over Navigable Waters‏‎ (1 revision)
  39. 105.06 Storage of Materials‏‎ (1 revision)
  40. 105.08 Nonconforming Materials‏‎ (1 revision)
  41. 107.20 Private Railroad Crossing for Haul Purposes‏‎ (1 revision)
  42. Table of Contents Division 1 Supplemental‏‎ (1 revision)
  43. 105.09 Materials not Incorporated into the Work‏‎ (1 revision)
  44. 108.02 Limitations of Operations‏‎ (1 revision)
  45. Density Training Videos‏‎ (1 revision)
  46. 103.03 Contractor Engineer Communication‏‎ (1 revision)
  47. 107.02 Permits and Licenses‏‎ (1 revision)
  48. 108.03 Competence of Workers‏‎ (1 revision)
  49. 104.02 Plans and Working Drawings‏‎ (1 revision)
  50. 107.03 Patented Process and Materials‏‎ (1 revision)
  51. 108.04 Adequacy of Methods and Equipment‏‎ (1 revision)
  52. 102.04 Examination of Plans, Specifications, and Work Site‏‎ (1 revision)
  53. 104.03 Deviations from the Plans‏‎ (1 revision)
  54. 107.04 Federal Aid Participation‏‎ (1 revision)
  55. 108.06 Determination of Contract Time for Work Day Contracts‏‎ (1 revision)
  56. 102.05 Preparation of Bid Items in the Proposal‏‎ (2 revisions)
  57. Module:Category handler‏‎ (2 revisions)
  58. Module:Documentation/config‏‎ (2 revisions)
  59. Module:Namespace detect/data‏‎ (2 revisions)
  60. 825 - Sanitary Sewer Systems‏‎ (2 revisions)
  61. Module:Documentation‏‎ (2 revisions)
  62. 826 – Intelligent Transportation Systems‏‎ (2 revisions)
  63. Division 4 Supplemental Information‏‎ (2 revisions)
  64. 108.08 Extension of Time on Calendar Day Contracts‏‎ (2 revisions)
  65. Module:HtmlBuilder‏‎ (2 revisions)
  66. Module:Message box/configuration‏‎ (2 revisions)
  67. 102.14 Execution and Award of Contract‏‎ (2 revisions)
  68. 102.15 Requirements of Contract Bonds‏‎ (2 revisions)
  69. Project with Consultant Oversight‏‎ (2 revisions)
  70. 102.16 Bid Guaranty Payment‏‎ (2 revisions)
  71. 103.01 Intent of the Contract‏‎ (2 revisions)
  72. 700 - Closure of Unsafe Structures‏‎ (2 revisions)
  73. Module:Yesno‏‎ (2 revisions)
  74. Module:Message box‏‎ (2 revisions)
  75. 102.03 Interpretation of Bid Items in the Proposal‏‎ (2 revisions)
  76. 1001 - Concrete Production Equipment and Facilities‏‎ (2 revisions)
  77. Module:Namespace detect/config‏‎ (2 revisions)
  78. Module:Namespace detect‏‎ (2 revisions)
  79. Module:Arguments‏‎ (2 revisions)
  80. 900 - Materials‏‎ (3 revisions)
  81. Table of Contents Division 1‏‎ (3 revisions)
  82. 104.09 Lines, Grades, and Elevations‏‎ (3 revisions)
  83. Table of Contents by Project Phase‏‎ (3 revisions)
  84. Final Project Review Report‏‎ (3 revisions)
  85. Hot Mix Asphalt Production Manual‏‎ (3 revisions)
  86. Plans, Proposal, Input, Review and Evaluation‏‎ (3 revisions)
  87. Railroad Highway Projects‏‎ (3 revisions)
  88. 1005 - Mortar and Grout Mixtures‏‎ (3 revisions)
  89. 1006 - Patching, Repair, & Overlay Mixtures‏‎ (3 revisions)
  90. 104.01 Authority of the Department‏‎ (4 revisions)
  91. 109.02 Scope of Payment‏‎ (4 revisions)
  92. 109.03 Payments for Increased or Decreased Quantities‏‎ (4 revisions)
  93. 1004 - Portland Cement Concrete Mixtures‏‎ (4 revisions)
  94. Invalid title with namespace "(Main)" and text "101.4_INSPECTORS_DAILY_REPORT_(IDR)"
  95. 107.19 Hauling on Local Roads and Streets‏‎ (4 revisions)
  96. Division 3 Supplemental Information‏‎ (4 revisions)
  97. 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts‏‎ (4 revisions)
  98. FPR Frequently Asked Questions‏‎ (4 revisions)
  99. Contract Administration and Oversight Guidelines for Intelligent Transportation Systems (ITS) Projects‏‎ (4 revisions)
  100. Section 701 - Portland Cement Concrete for Structures‏‎ (4 revisions)
  101. FHWA CAP Action Plans‏‎ (4 revisions)
  102. 105.07 Handling and Transporting Materials‏‎ (4 revisions)
  103. 109.01 Measurement of Quantities‏‎ (5 revisions)
  104. Letter to File‏‎ (5 revisions)
  105. 107.06 Furnishing Right-of-Way‏‎ (5 revisions)
  106. 503 - Paver Placed Surface Seal‏‎ (5 revisions)
  107. 406 - Precast Three-Sided, Arch, and Box Culverts‏‎ (5 revisions)
  108. 308 - Geotextiles for Base‏‎ (5 revisions)
  109. MDOT DENSITY TESTING AND INSPECTION MANUAL‏‎ (5 revisions)
  110. Weight Limit Waivers‏‎ (5 revisions)
  111. 306 - Aggregate Surface Course‏‎ (6 revisions)
  112. 107.12 Contractor's Responsibility for Utility Property and Services‏‎ (6 revisions)
  113. Contractor's Equipment and Traffic Control‏‎ (6 revisions)
  114. 305 - HMA Base Crushing and Shaping‏‎ (6 revisions)
  115. Work Order‏‎ (6 revisions)
  116. Processing Sewage/Storm Water Damage Claims‏‎ (6 revisions)
  117. Digital Calculations for Payment‏‎ (6 revisions)
  118. 405 - Pump Station Construction‏‎ (6 revisions)
  119. Construction Technology Support Resources‏‎ (6 revisions)
  120. 303 - Open Graded Drainage Course‏‎ (6 revisions)
  121. 1002 - Contractor Quality Control for Concrete‏‎ (7 revisions)
  122. 817 - Landscape Mowing‏‎ (7 revisions)
  123. Interim File Review‏‎ (7 revisions)
  124. 822 - Ground or Cut Centerline and Shoulder Corrugations‏‎ (7 revisions)
  125. 824 - Contractor Staking‏‎ (7 revisions)
  126. 404 - Underdrain‏‎ (7 revisions)
  127. 808 - Fencing‏‎ (7 revisions)
  128. 107.01 Laws to be Observed‏‎ (7 revisions)
  129. 821 - Preservation of Land Monuments and Property Corners‏‎ (7 revisions)
  130. 801 - Concrete Driveways‏‎ (7 revisions)
  131. 107.15 Compliance with Laws; Environmental Protection‏‎ (7 revisions)
  132. 101 - Terms, Format, and Conditions‏‎ (8 revisions)
  133. 506 - Slurry Seal‏‎ (8 revisions)
  134. 403 - Drainage Structures‏‎ (8 revisions)
  135. 805 - Hot Mix Asphalt Curb‏‎ (8 revisions)
  136. 505 - Chip Seals‏‎ (8 revisions)
  137. Extending Project Limits‏‎ (8 revisions)
  138. Section 601 - Portland Cement Concrete for Pavements‏‎ (8 revisions)
  139. 809 - Field Office‏‎ (8 revisions)
  140. 209 - Project Cleanup‏‎ (8 revisions)
  141. 203 - Removing Drainage Structures, Culverts, and Sewers‏‎ (8 revisions)
  142. 814 - Paved Ditches‏‎ (8 revisions)
  143. 806 - Bicycle Paths‏‎ (9 revisions)
  144. 804 - Concrete Barriers and Glare Screens‏‎ (9 revisions)
  145. Division 2 Supplemental Information‏‎ (9 revisions)
  146. 150 - Mobilization‏‎ (9 revisions)
  147. Division 7 Supplemental Information‏‎ (9 revisions)
  148. 301 - Subbase‏‎ (9 revisions)
  149. 816 - Turf Establishment‏‎ (9 revisions)
  150. Mandrel Testing of Plastic Pipe‏‎ (9 revisions)
  151. 402 - Storm Sewers‏‎ (9 revisions)
  152. 302 - Aggregate Base Courses‏‎ (9 revisions)
  153. 207 - Obliterating Roadway‏‎ (9 revisions)
  154. 717 - Downspouts and Drains‏‎ (9 revisions)
  155. 304 - Rubbilizing Existing PCC Pavement‏‎ (10 revisions)
  156. 504 - Micro-Surfacing‏‎ (10 revisions)
  157. 813 - Slope Protection‏‎ (10 revisions)
  158. 1003 - Quality Assurance (Acceptance) for Concrete‏‎ (10 revisions)
  159. 106 - Quality Assurance Acceptance Program‏‎ (10 revisions)
  160. 201 - Clearing‏‎ (10 revisions)
  161. 108.05 Progress Schedule‏‎ (10 revisions)
  162. 202 - Removing Trees, Stumps, and Corduroy‏‎ (10 revisions)
  163. 109.04 Progress and Partial Payments‏‎ (11 revisions)
  164. 105.01 Quality and Scope of Supply‏‎ (11 revisions)
  165. Project Delays Due to a Utility Company‏‎ (11 revisions)
  166. 206 - Excavation and Backfill for Structures‏‎ (11 revisions)
  167. 307 - Aggregate Shoulders and Approaches‏‎ (11 revisions)
  168. 108.10 Liquidated Damages‏‎ (11 revisions)
  169. Process for Documenting Certified Materials in FieldManager‏‎ (11 revisions)
  170. 711 - Bridge Railings‏‎ (11 revisions)
  171. Construction Field Services Indirect Testing Charges‏‎ (12 revisions)
  172. 108.07 Extension of Time on Work Day Contracts‏‎ (12 revisions)
  173. 802 - Concrete Curb, Gutter, and Dividers‏‎ (12 revisions)
  174. Holiday Traffic Safety Provisions‏‎ (12 revisions)
  175. Construction Value Engineering Change Proposal (VECP)‏‎ (13 revisions)
  176. Quality Initiatives and Adjustments‏‎ (13 revisions)
  177. FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)‏‎ (13 revisions)
  178. 719 - Earth Retaining Structures‏‎ (13 revisions)
  179. Contract Administration and Oversight Guidelines for Projects Containing Warranty Work‏‎ (13 revisions)
  180. 109.08 Prompt Payment‏‎ (14 revisions)
  181. 401 - Culverts‏‎ (14 revisions)
  182. Project Closeout Escalation of Accountability‏‎ (14 revisions)
  183. Structural Fabrication Quality Manual‏‎ (15 revisions)
  184. 807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts‏‎ (15 revisions)
  185. 108.01 Subcontracting of Contract Work‏‎ (15 revisions)
  186. 204 - Removing Miscellaneous Structures and Materials‏‎ (15 revisions)
  187. 819 - Electrical and Lighting‏‎ (15 revisions)
  188. 716 - Shop Cleaning and Coating Structural Steel‏‎ (16 revisions)
  189. 105.10 Buy America Source of Steel and Iron‏‎ (16 revisions)
  190. 107.09 Archeological and Historical Findings‏‎ (16 revisions)
  191. 713 - Bridge Rehabilitation, Steel‏‎ (16 revisions)
  192. MDOT Construction Manual Style Guide‏‎ (16 revisions)
  193. Notice of Non-Compliance with Contract Requirements‏‎ (16 revisions)
  194. 502 - HMA Crack Treatment‏‎ (16 revisions)
  195. 815 - Landscaping‏‎ (17 revisions)
  196. 104.07 Contractor Obligations‏‎ (17 revisions)
  197. 205 - Roadway Earthwork‏‎ (18 revisions)
  198. Frequently Searched Items‏‎ (18 revisions)
  199. 812 - Temporary Traffic Control for Construction Zone Operations‏‎ (19 revisions)
  200. 803 - Concrete Sidewalk, Ramps, and Steps‏‎ (19 revisions)
  201. 702 - Mortar and Grout‏‎ (20 revisions)
  202. 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes‏‎ (21 revisions)
  203. 709 - Timber Sturctures‏‎ (21 revisions)
  204. 710 - Waterproofing and Protective Covers‏‎ (23 revisions)
  205. Force Account Work‏‎ (23 revisions)
  206. Invalid title with namespace "(Main)" and text "Division_1__General_Provisions"
  207. 823 - Water Mains‏‎ (23 revisions)
  208. Dispute Review Board (DRB)‏‎ (25 revisions)
  209. Materials Quality Assurance Procedures Manual‏‎ (25 revisions)
  210. Final Project Review‏‎ (26 revisions)
  211. 102.19 Evaluation of Contractor Performance and Contract Non-Compliance‏‎ (26 revisions)
  212. Construction Manual Wiki Tips‏‎ (28 revisions)
  213. 714 - Temporary Structures and Approaches‏‎ (30 revisions)
  214. 701 - Portland Cement Concrete for Structures‏‎ (30 revisions)
  215. 706 - Structural Concrete‏‎ (30 revisions)
  216. Preconstruction Meeting‏‎ (31 revisions)
  217. 104.10 Claim for Extra Compensation or Extension of Time‏‎ (31 revisions)
  218. Certified Office Technician Process‏‎ (31 revisions)
  219. MDOT Construction Manual Content Revision Procedures‏‎ (32 revisions)
  220. 708 - Prestressed Concrete‏‎ (34 revisions)
  221. 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs)‏‎ (34 revisions)
  222. 109.05 Payment for Contract Revisions‏‎ (35 revisions)
  223. 102.01 Prequalification of Bidders‏‎ (35 revisions)
  224. Prevailing Wage‏‎ (39 revisions)
  225. 718 - Drilled Shafts‏‎ (40 revisions)
  226. 820 - Traffic Signals‏‎ (46 revisions)
  227. 704 - Steel Sheet Piling and Cofferdams‏‎ (46 revisions)
  228. 810 - Permanent Traffic Signs and Supports‏‎ (46 revisions)
  229. CONSTRUCTION MANUAL CONTENT TEMPLATE‏‎ (50 revisions)
  230. Dev Page‏‎ (55 revisions)
  231. Disadvantaged Business Enterprises (DBE)‏‎ (56 revisions)
  232. 208 - Soil Erosion and Sedimentation Control (NPDES)‏‎ (58 revisions)
  233. 603 - Concrete Pavement Restoration‏‎ (59 revisions)
  234. 707 - Structural Steel‏‎ (64 revisions)
  235. 705 - Foundation Piling‏‎ (65 revisions)
  236. 602 - Concrete Pavement Construction‏‎ (65 revisions)
  237. 102.02 Contents of Proposal - Progress Clause‏‎ (66 revisions)
  238. FieldManager‏‎ (67 revisions)
  239. 109.07 Final Inspection, Acceptance, and Final Payment‏‎ (72 revisions)
  240. Certified Engineer Process‏‎ (74 revisions)
  241. 715 - Cleaning and Coating Existing Structural Steel‏‎ (79 revisions)
  242. 811 - Permanent Pavement Markings‏‎ (83 revisions)
  243. E-Signature‏‎ (100 revisions)
  244. Local Agency Program (LAP)‏‎ (110 revisions)
  245. 103.02 Contract Revisions‏‎ (120 revisions)
  246. 712 - Bridge Rehabilitation, Concrete‏‎ (123 revisions)
  247. E-Construction‏‎ (152 revisions)
  248. 501 - Plant Produced Hot Mix Asphalt‏‎ (176 revisions)
  249. Standard Naming Convention‏‎ (241 revisions)
  250. Main Page‏‎ (624 revisions)

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)