Uploads by Greenes2
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
11:18, 2 July 2014 | Work continues on the new M-85 bridge over the Rouge River in Detroit.jpg (file) | 77 KB | Work continues on the new M-85 bridge over the Rouge River in Detroit. | 1 | |
10:41, 27 September 2013 | Traffic Signal.jpg (file) | 131 KB | 1 | ||
10:51, 22 September 2014 | The 96 Fix Grand OpeningCelebration.jpg (file) | 164 KB | The 96 Fix Grand Opening Celebration | 1 | |
14:12, 19 March 2014 | Table 602 % increase strength.png (file) | 27 KB | Table 602 % increase strength.png | 1 | |
09:48, 2 May 2014 | Table707.6.png (file) | 4 KB | Table 707.6 - Minimum Preheat Temperatures | 1 | |
09:45, 2 May 2014 | Table707.5.png (file) | 11 KB | Table 707.5 Welder Qualification Type and Position Limitations | 1 | |
15:05, 1 May 2014 | Table707.4.png (file) | 21 KB | Nut Rotation from Snug Tight Condition | 1 | |
14:50, 1 May 2014 | Table707.2.png (file) | 74 KB | Brief description of high strength bolts, nuts and washers used for structural applications. | 1 | |
12:22, 29 April 2014 | Table603-01.png (file) | 26 KB | Table 1: Modulus of Rupture Factors (F) | 1 | |
10:37, 2 July 2014 | Progress on the M-231 bridge over the Grand River in Ottawa County.jpg (file) | 64 KB | Progress on the M-231 bridge over the Grand River in Ottawa County | 1 | |
08:57, 9 May 2014 | Petosky US31.png (file) | 1.07 MB | Construction of US-31 in Petosky. | 1 | |
10:38, 2 July 2014 | Mount Elliot Park on the Detroit riverfront.jpg (file) | 100 KB | Mount Elliot Park on the Detroit riverfront. | 1 | |
08:52, 9 May 2014 | Mackinac Bridge.png (file) | 926 KB | Construction began 60 years ago this month on the "Mighty Mac" | 1 | |
09:36, 12 June 2015 | MDOT IM15-02 FlowChart 491553 7.pdf (file) | 184 KB | Flowchart for Claims process BOH-IM 2015-02 | 1 | |
16:06, 24 November 2015 | M231 Ottawa County.jpg (file) | 209 KB | 1 | ||
16:58, 7 April 2014 | Letter - Procedures for Review of Contractor Claims.png (file) | 76 KB | Letter-Procedures for Review of Contractor Claims | 1 | |
12:07, 4 March 2015 | ITS Submittals List.pdf (file) | 88 KB | List of ITS Submittals | 1 | |
16:57, 7 April 2014 | IM11-07 CPF.png (file) | 59 KB | Claims Process Flow Chart | 1 | |
08:57, 29 May 2014 | I-96 Livonia.png (file) | 1.07 MB | Concrete Paving I-96 in Livonia | 1 | |
16:10, 18 December 2013 | HMA2.jpg (file) | 50 KB | Cover Photo 2 for 501 | 1 | |
16:04, 18 December 2013 | HMA1.png (file) | 19 KB | Cover Photo 1 for 501 | 1 | |
16:08, 18 December 2013 | HMA1.jpg (file) | 93 KB | Cover Photo 1 for 501 | 1 | |
14:24, 19 March 2014 | Flowchart 602-09.png (file) | 41 KB | Figure 602-9 Pavement Coring for Acceptance Flow Chart | 1 | |
11:36, 25 March 2013 | Figure 101.04-1cont.png (file) | 62 KB | 1 | ||
11:36, 25 March 2013 | Figure 101.04-1.png (file) | 87 KB | 1 | ||
09:56, 19 March 2014 | Fig 718-9.png (file) | 249 KB | Figure 9. Improper concrete placement | 1 | |
09:56, 19 March 2014 | Fig 718-8.png (file) | 298 KB | Figure 8. Rebar cage being lowered into complete shaft | 1 | |
09:55, 19 March 2014 | Fig 718-7.png (file) | 150 KB | Figure 7. Rebar cage spacers | 1 | |
09:55, 19 March 2014 | Fig 718-6.png (file) | 59 KB | Figure 6. Soft rock core barrel | 1 | |
09:55, 19 March 2014 | Fig 718-5.png (file) | 76 KB | Figure 5. Muck bucket bottom | 1 | |
09:54, 19 March 2014 | Fig 718-4.png (file) | 124 KB | Figure 4. Muck bucket | 1 | |
09:54, 19 March 2014 | Fig 718-3.png (file) | 98 KB | Figure 3. Single flight rock auger | 1 | |
09:54, 19 March 2014 | Fig 718-2.png (file) | 270 KB | Figure 2. Double flight earth auger | 1 | |
09:53, 19 March 2014 | Fig 718-1.png (file) | 189 KB | Figure 1. Typical drill rig set up | 1 | |
12:58, 12 May 2014 | Fig 708.9.png (file) | 318 KB | Figure 708.9 – Major deficiency – spalled bottom corner and exposed prestressing strands at the end of a box beam | 1 | |
12:57, 12 May 2014 | Fig 708.8.png (file) | 416 KB | Figure 708.8 – Minor damage – spalled bottom corner at the end of a box beam | 1 | |
12:57, 12 May 2014 | Fig 708.7.png (file) | 324 KB | Figure 708.7 – Minor damage – broken corner at end of PCI girder | 1 | |
12:56, 12 May 2014 | Fig 708.6.png (file) | 342 KB | Figure 708.6 – Minor surface defect – honeycombing of PCI girder | 1 | |
12:55, 12 May 2014 | Fig 708.5.png (file) | 350 KB | Figure 708.5 – Minor surface defect – rubber gasket crease | 1 | |
12:55, 12 May 2014 | Fig 708.4.png (file) | 325 KB | Figure 708.4 – Minor surface defect – air holes greater than 1” in any direction | 1 | |
12:54, 12 May 2014 | Fig 708.3.png (file) | 870 KB | Figure 708.3 – Structural Precast Concrete Fabrication Inspection Flowchart | 1 | |
12:54, 12 May 2014 | Fig 708.2.png (file) | 147 KB | Figure 708.2 | 1 | |
12:53, 12 May 2014 | Fig 708.2-1.png (file) | 255 KB | Figure 708.2-1 – Shop Drawing Review Process | 1 | |
12:58, 12 May 2014 | Fig 708.10.png (file) | 400 KB | Figure 708.10 – Major deficiency – improper consolidation of concrete and expose prestressing strands and steel reinforcement | 1 | |
12:52, 12 May 2014 | Fig 708.1-1.png (file) | 223 KB | Figure 708.1-1 – Shop Drawing Review Process | 1 | |
12:59, 12 May 2014 | Fig 708-11.png (file) | 226 KB | Figure 708-11 Crack comparator for measuring crack width | 1 | |
12:16, 3 February 2014 | Fig 705-6.png (file) | 56 KB | Figure 6. Typical conical pile pile points | 1 | |
12:16, 3 February 2014 | Fig 705-5.png (file) | 21 KB | Figure 5. Typical HP section pile points | 1 | |
12:16, 3 February 2014 | Fig 705-4.png (file) | 77 KB | Figure 4. Typical helmet and cushion configuration | 1 | |
12:15, 3 February 2014 | Fig 705-3.png (file) | 30 KB | Figure 3. Typical nylon hammer cushions | 1 |