Pages with the most revisions

Jump to navigation Jump to search

Showing below up to 211 results in range #41 to #251.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

  1. 102.19 Evaluation of Contractor Performance and Contract Non-Compliance‏‎ (26 revisions)
  2. Final Project Review‏‎ (26 revisions)
  3. Materials Quality Assurance Procedures Manual‏‎ (25 revisions)
  4. Dispute Review Board (DRB)‏‎ (25 revisions)
  5. 710 - Waterproofing and Protective Covers‏‎ (23 revisions)
  6. Force Account Work‏‎ (23 revisions)
  7. Invalid title with namespace "(Main)" and text "Division_1__General_Provisions"
  8. 823 - Water Mains‏‎ (23 revisions)
  9. 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes‏‎ (21 revisions)
  10. 709 - Timber Sturctures‏‎ (21 revisions)
  11. 702 - Mortar and Grout‏‎ (20 revisions)
  12. 803 - Concrete Sidewalk, Ramps, and Steps‏‎ (19 revisions)
  13. 812 - Temporary Traffic Control for Construction Zone Operations‏‎ (19 revisions)
  14. 205 - Roadway Earthwork‏‎ (18 revisions)
  15. 815 - Landscaping‏‎ (17 revisions)
  16. 104.07 Contractor Obligations‏‎ (17 revisions)
  17. 713 - Bridge Rehabilitation, Steel‏‎ (16 revisions)
  18. MDOT Construction Manual Style Guide‏‎ (16 revisions)
  19. Notice of Non-Compliance with Contract Requirements‏‎ (16 revisions)
  20. 502 - HMA Crack Treatment‏‎ (16 revisions)
  21. 716 - Shop Cleaning and Coating Structural Steel‏‎ (16 revisions)
  22. 105.10 Buy America Source of Steel and Iron‏‎ (16 revisions)
  23. 107.09 Archeological and Historical Findings‏‎ (16 revisions)
  24. 807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts‏‎ (15 revisions)
  25. 108.01 Subcontracting of Contract Work‏‎ (15 revisions)
  26. 204 - Removing Miscellaneous Structures and Materials‏‎ (15 revisions)
  27. 819 - Electrical and Lighting‏‎ (15 revisions)
  28. Structural Fabrication Quality Manual‏‎ (15 revisions)
  29. 109.08 Prompt Payment‏‎ (14 revisions)
  30. 401 - Culverts‏‎ (14 revisions)
  31. Project Closeout Escalation of Accountability‏‎ (14 revisions)
  32. Quality Initiatives and Adjustments‏‎ (13 revisions)
  33. FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)‏‎ (13 revisions)
  34. 719 - Earth Retaining Structures‏‎ (13 revisions)
  35. Contract Administration and Oversight Guidelines for Projects Containing Warranty Work‏‎ (13 revisions)
  36. Construction Value Engineering Change Proposal (VECP)‏‎ (13 revisions)
  37. 108.07 Extension of Time on Work Day Contracts‏‎ (12 revisions)
  38. 802 - Concrete Curb, Gutter, and Dividers‏‎ (12 revisions)
  39. Holiday Traffic Safety Provisions‏‎ (12 revisions)
  40. Construction Field Services Indirect Testing Charges‏‎ (12 revisions)
  41. 105.01 Quality and Scope of Supply‏‎ (11 revisions)
  42. Project Delays Due to a Utility Company‏‎ (11 revisions)
  43. 206 - Excavation and Backfill for Structures‏‎ (11 revisions)
  44. 307 - Aggregate Shoulders and Approaches‏‎ (11 revisions)
  45. 108.10 Liquidated Damages‏‎ (11 revisions)
  46. Process for Documenting Certified Materials in FieldManager‏‎ (11 revisions)
  47. 711 - Bridge Railings‏‎ (11 revisions)
  48. 109.04 Progress and Partial Payments‏‎ (11 revisions)
  49. 504 - Micro-Surfacing‏‎ (10 revisions)
  50. 813 - Slope Protection‏‎ (10 revisions)
  51. 1003 - Quality Assurance (Acceptance) for Concrete‏‎ (10 revisions)
  52. 106 - Quality Assurance Acceptance Program‏‎ (10 revisions)
  53. 201 - Clearing‏‎ (10 revisions)
  54. 202 - Removing Trees, Stumps, and Corduroy‏‎ (10 revisions)
  55. 108.05 Progress Schedule‏‎ (10 revisions)
  56. 304 - Rubbilizing Existing PCC Pavement‏‎ (10 revisions)
  57. 150 - Mobilization‏‎ (9 revisions)
  58. Division 7 Supplemental Information‏‎ (9 revisions)
  59. 301 - Subbase‏‎ (9 revisions)
  60. 816 - Turf Establishment‏‎ (9 revisions)
  61. Mandrel Testing of Plastic Pipe‏‎ (9 revisions)
  62. 402 - Storm Sewers‏‎ (9 revisions)
  63. 302 - Aggregate Base Courses‏‎ (9 revisions)
  64. 717 - Downspouts and Drains‏‎ (9 revisions)
  65. 207 - Obliterating Roadway‏‎ (9 revisions)
  66. 806 - Bicycle Paths‏‎ (9 revisions)
  67. 804 - Concrete Barriers and Glare Screens‏‎ (9 revisions)
  68. Division 2 Supplemental Information‏‎ (9 revisions)
  69. 505 - Chip Seals‏‎ (8 revisions)
  70. Extending Project Limits‏‎ (8 revisions)
  71. Section 601 - Portland Cement Concrete for Pavements‏‎ (8 revisions)
  72. 809 - Field Office‏‎ (8 revisions)
  73. 209 - Project Cleanup‏‎ (8 revisions)
  74. 203 - Removing Drainage Structures, Culverts, and Sewers‏‎ (8 revisions)
  75. 814 - Paved Ditches‏‎ (8 revisions)
  76. 101 - Terms, Format, and Conditions‏‎ (8 revisions)
  77. 506 - Slurry Seal‏‎ (8 revisions)
  78. 403 - Drainage Structures‏‎ (8 revisions)
  79. 805 - Hot Mix Asphalt Curb‏‎ (8 revisions)
  80. 822 - Ground or Cut Centerline and Shoulder Corrugations‏‎ (7 revisions)
  81. 824 - Contractor Staking‏‎ (7 revisions)
  82. 404 - Underdrain‏‎ (7 revisions)
  83. 808 - Fencing‏‎ (7 revisions)
  84. 107.01 Laws to be Observed‏‎ (7 revisions)
  85. 821 - Preservation of Land Monuments and Property Corners‏‎ (7 revisions)
  86. 801 - Concrete Driveways‏‎ (7 revisions)
  87. 107.15 Compliance with Laws; Environmental Protection‏‎ (7 revisions)
  88. 1002 - Contractor Quality Control for Concrete‏‎ (7 revisions)
  89. 817 - Landscape Mowing‏‎ (7 revisions)
  90. Interim File Review‏‎ (7 revisions)
  91. 305 - HMA Base Crushing and Shaping‏‎ (6 revisions)
  92. Work Order‏‎ (6 revisions)
  93. Processing Sewage/Storm Water Damage Claims‏‎ (6 revisions)
  94. Digital Calculations for Payment‏‎ (6 revisions)
  95. 405 - Pump Station Construction‏‎ (6 revisions)
  96. Construction Technology Support Resources‏‎ (6 revisions)
  97. 303 - Open Graded Drainage Course‏‎ (6 revisions)
  98. 306 - Aggregate Surface Course‏‎ (6 revisions)
  99. 107.12 Contractor's Responsibility for Utility Property and Services‏‎ (6 revisions)
  100. Contractor's Equipment and Traffic Control‏‎ (6 revisions)
  101. 109.01 Measurement of Quantities‏‎ (5 revisions)
  102. Letter to File‏‎ (5 revisions)
  103. 107.06 Furnishing Right-of-Way‏‎ (5 revisions)
  104. 503 - Paver Placed Surface Seal‏‎ (5 revisions)
  105. 406 - Precast Three-Sided, Arch, and Box Culverts‏‎ (5 revisions)
  106. 308 - Geotextiles for Base‏‎ (5 revisions)
  107. MDOT DENSITY TESTING AND INSPECTION MANUAL‏‎ (5 revisions)
  108. Weight Limit Waivers‏‎ (5 revisions)
  109. 109.02 Scope of Payment‏‎ (4 revisions)
  110. 109.03 Payments for Increased or Decreased Quantities‏‎ (4 revisions)
  111. 1004 - Portland Cement Concrete Mixtures‏‎ (4 revisions)
  112. Invalid title with namespace "(Main)" and text "101.4_INSPECTORS_DAILY_REPORT_(IDR)"
  113. 107.19 Hauling on Local Roads and Streets‏‎ (4 revisions)
  114. Division 3 Supplemental Information‏‎ (4 revisions)
  115. 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts‏‎ (4 revisions)
  116. FPR Frequently Asked Questions‏‎ (4 revisions)
  117. Contract Administration and Oversight Guidelines for Intelligent Transportation Systems (ITS) Projects‏‎ (4 revisions)
  118. Section 701 - Portland Cement Concrete for Structures‏‎ (4 revisions)
  119. FHWA CAP Action Plans‏‎ (4 revisions)
  120. 105.07 Handling and Transporting Materials‏‎ (4 revisions)
  121. 104.01 Authority of the Department‏‎ (4 revisions)
  122. 104.09 Lines, Grades, and Elevations‏‎ (3 revisions)
  123. Table of Contents by Project Phase‏‎ (3 revisions)
  124. Final Project Review Report‏‎ (3 revisions)
  125. Hot Mix Asphalt Production Manual‏‎ (3 revisions)
  126. Plans, Proposal, Input, Review and Evaluation‏‎ (3 revisions)
  127. Railroad Highway Projects‏‎ (3 revisions)
  128. 1005 - Mortar and Grout Mixtures‏‎ (3 revisions)
  129. 1006 - Patching, Repair, & Overlay Mixtures‏‎ (3 revisions)
  130. 900 - Materials‏‎ (3 revisions)
  131. Table of Contents Division 1‏‎ (3 revisions)
  132. 825 - Sanitary Sewer Systems‏‎ (2 revisions)
  133. 826 – Intelligent Transportation Systems‏‎ (2 revisions)
  134. Module:Documentation‏‎ (2 revisions)
  135. Division 4 Supplemental Information‏‎ (2 revisions)
  136. 108.08 Extension of Time on Calendar Day Contracts‏‎ (2 revisions)
  137. Module:HtmlBuilder‏‎ (2 revisions)
  138. Module:Message box/configuration‏‎ (2 revisions)
  139. 102.14 Execution and Award of Contract‏‎ (2 revisions)
  140. 102.15 Requirements of Contract Bonds‏‎ (2 revisions)
  141. Project with Consultant Oversight‏‎ (2 revisions)
  142. 102.16 Bid Guaranty Payment‏‎ (2 revisions)
  143. 103.01 Intent of the Contract‏‎ (2 revisions)
  144. 700 - Closure of Unsafe Structures‏‎ (2 revisions)
  145. Module:Yesno‏‎ (2 revisions)
  146. Module:Message box‏‎ (2 revisions)
  147. 102.03 Interpretation of Bid Items in the Proposal‏‎ (2 revisions)
  148. 1001 - Concrete Production Equipment and Facilities‏‎ (2 revisions)
  149. Module:Namespace detect/config‏‎ (2 revisions)
  150. Module:Namespace detect‏‎ (2 revisions)
  151. Module:Arguments‏‎ (2 revisions)
  152. 102.05 Preparation of Bid Items in the Proposal‏‎ (2 revisions)
  153. Module:Category handler‏‎ (2 revisions)
  154. Module:Documentation/config‏‎ (2 revisions)
  155. Module:Namespace detect/data‏‎ (2 revisions)
  156. 102.10 Bid Review‏‎ (1 revision)
  157. 104.12 Approval for Use of the Right of Way‏‎ (1 revision)
  158. 107.13 Personal Liability of Public Officials‏‎ (1 revision)
  159. 102.11 Bid Rejection‏‎ (1 revision)
  160. 105.02 Natural Material Sources Found Within the Excavation Limits‏‎ (1 revision)
  161. 107.14 No Waiver of Legal Rights‏‎ (1 revision)
  162. 102.12 Bid Rejection Appeal‏‎ (1 revision)
  163. 105.03 Borrow Materials‏‎ (1 revision)
  164. 107.16 Forest Protection‏‎ (1 revision)
  165. 102.13 Consideration of Bids‏‎ (1 revision)
  166. 105.04 Miscellameous Quantities‏‎ (1 revision)
  167. 107.17 Use of Explosives‏‎ (1 revision)
  168. 105.05 Approval of Materials Incorporated into the Work‏‎ (1 revision)
  169. 107.18 Work over Navigable Waters‏‎ (1 revision)
  170. 105.06 Storage of Materials‏‎ (1 revision)
  171. 105.08 Nonconforming Materials‏‎ (1 revision)
  172. 107.20 Private Railroad Crossing for Haul Purposes‏‎ (1 revision)
  173. Standard Rounding Convention Guidance‏‎ (1 revision)
  174. Table of Contents Division 1 Supplemental‏‎ (1 revision)
  175. 105.09 Materials not Incorporated into the Work‏‎ (1 revision)
  176. 108.02 Limitations of Operations‏‎ (1 revision)
  177. Density Training Videos‏‎ (1 revision)
  178. 103.03 Contractor Engineer Communication‏‎ (1 revision)
  179. 107.02 Permits and Licenses‏‎ (1 revision)
  180. 108.03 Competence of Workers‏‎ (1 revision)
  181. 104.02 Plans and Working Drawings‏‎ (1 revision)
  182. 107.03 Patented Process and Materials‏‎ (1 revision)
  183. 108.04 Adequacy of Methods and Equipment‏‎ (1 revision)
  184. 102.04 Examination of Plans, Specifications, and Work Site‏‎ (1 revision)
  185. 104.03 Deviations from the Plans‏‎ (1 revision)
  186. 107.04 Federal Aid Participation‏‎ (1 revision)
  187. 108.06 Determination of Contract Time for Work Day Contracts‏‎ (1 revision)
  188. Projects with Incentive Provisions‏‎ (1 revision)
  189. 104.04 Conformity with the Contrat‏‎ (1 revision)
  190. 107.05 Sanitary Provisions‏‎ (1 revision)
  191. 108.11 Default of Contract‏‎ (1 revision)
  192. 102.06 Irregular Bids‏‎ (1 revision)
  193. 104.05 Removal of Unauthorized Work‏‎ (1 revision)
  194. 107.07 Protection and Restoration of Property‏‎ (1 revision)
  195. 108.12 Termination of Contract‏‎ (1 revision)
  196. Oversight of Maintenance Funded Projects Using the Michigan Department of Transportation Letting System‏‎ (1 revision)
  197. Pavement Historical Database‏‎ (1 revision)
  198. 102.07 Delivery of Bid‏‎ (1 revision)
  199. 104.06 Coordination of Drawing Dimensions and Contract Documentation‏‎ (1 revision)
  200. 107.08 Land Monuments and Property Corners‏‎ (1 revision)
  201. 109.06 Source of Supply and Carrier Rates on Materials‏‎ (1 revision)
  202. Information Sharing About Construction Contractors and Consultants‏‎ (1 revision)
  203. 102.08 Withdrawal or Revision of Bid‏‎ (1 revision)
  204. 104.08 Cooperation by the Contractor‏‎ (1 revision)
  205. 107.10 Indemnification, Damage Liability, and Insurance‏‎ (1 revision)
  206. 107.21 Open to Traffic‏‎ (1 revision)
  207. New CM Format Code‏‎ (1 revision)
  208. 102.09 Downloading of Bids‏‎ (1 revision)
  209. 104.11 Work Zone Safety and Mobility‏‎ (1 revision)
  210. 107.11 Contractor's Responsibility for the Work‏‎ (1 revision)
  211. 102.18 - OJT Program‏‎ (1 revision)

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)