Search results

Jump to navigation Jump to search
  • ...g plans to and inviting the DR to the Plan Review/Grade Inspection Meeting so the DR may provide general constructability review and/or mobility input co
    7 KB (1,055 words) - 11:29, 14 July 2020
  • ...be a minimum 18 inches wide. The membrane must be centered over the joint so that it extends a minimum of 9 inches on either side of the joint. Take additional cores through the reinforcing steel so the Engineer can evaluate the soundness of the shotcrete behind the steel.
    15 KB (2,249 words) - 18:23, 15 February 2024
  • ...ould be taken during the process of unloading and placing timber materials so as not to deform or damage the timber. Ensure the Contractor is handling st ...ses moisture in dry environments. As the moisture content of wood changes, so does its strength. Wood with lower moisture content has higher strength. M
    18 KB (2,669 words) - 16:33, 10 January 2024
  • ...fill should be brought up along both sides of the culvert at the same time so as to not displace the pipe.
    15 KB (2,250 words) - 12:56, 4 October 2023
  • ....php/Final_Project_Review#Review_Findings here]. The reason for citing is so the Engineer can understand the deficiency more effectively, and work towar Under the new guidance, Certified Engineer credentials are now portable. So, if you were certified while working at one employer and transition to anot
    16 KB (2,430 words) - 15:46, 6 May 2021
  • The team must have sufficient members included so that the combined team will meet the following requirements. ...(Form 1972)] should include reference to specific test documents examined, so that an auditor can easily trace these documents. Additionally, total quan
    19 KB (2,779 words) - 17:01, 6 November 2023
  • ...should verify that care is taken during the handling and erection process so that no damage occurs to the components. Ensure the contractor uses soften
    8 KB (1,268 words) - 11:47, 19 January 2022
  • ...instructions that the work be controlled to the extent that any plant life so designated will be saved. Vegetation beyond lines 3 feet (1 m) outside the
    8 KB (1,133 words) - 12:01, 28 March 2023
  • Ensure the Contractor cleans each shaft so at least 50% of the base contains less than ½ inch of sediment. The shaft ...Contractor’s tremie tube to ensure there is a bottom plate, valve, or plug so no water can get into the tube and contaminate the concrete prior to placem
    28 KB (4,324 words) - 11:40, 25 April 2023
  • ...tank, assuming a full tank. The storage or use area should be constructed so that no liquid can escape into any sewer system or to the surface or ground
    9 KB (1,330 words) - 14:21, 23 September 2021
  • ...plate on the ground, using duct tape to hold it in place. Place the plate so the entire width of the marking will be contained on the plate. ...oo thick or thin in one area of the line, show these areas to the operator so that the pavement marking equipment can be adjusted. Once adjustments hav
    56 KB (7,443 words) - 17:48, 9 October 2023
  • The spacing is based on the rigidity of the system so that deflections are minimized during the pour and to assure the forms do n ...or joists cross, a positive connection such as toe nailing should be used so that the members support each other laterally and do not spread or rotate d
    49 KB (7,967 words) - 12:41, 27 February 2024
  • ...uire close cooperation between all forces on highway construction projects so the roadway is signed properly when opened to traffic. ...rm 0467] of this work and submit it to MDOT Operation Field Service office so the sign support structure can be updated in the inventory system.
    19 KB (2,827 words) - 15:38, 2 April 2024
  • ...itted to be skewed around piling or other obstructions, but should be done so to not only reduce the skew, but also the number of skewed reinforcement st
    9 KB (1,409 words) - 11:48, 19 January 2022
  • ...r removing the old slab, cleaning up loose material should be done by hand so as not to disturb the existing base. If the existing base was more than 2 ...w to the plan dimensions as soon as the concrete has hardened sufficiently so that no excess raveling or spalling occurs. All edging will be done with a
    23 KB (3,714 words) - 10:16, 13 September 2023
  • ...ate various digital technologies into its business/construction operations so that cost savings, efficiency gains, and other benefits are realized. MDOT
    12 KB (1,824 words) - 16:49, 18 April 2024
  • ...the authorization should include an end date for which this use is allowed so that it does not become a "permanent" storage location for the Contractor. The roadbed and ditches should be maintained so the work will be well drained at all times while still controlling erosion
    78 KB (12,236 words) - 14:45, 21 September 2023
  • ...ovide a daily copy of measured quantities to the engineer’s representative so discrepancies can be identified promptly. ...ontractors with read only files several days before the estimate or weekly so they can review what documentation is needed to ensure timely payment.
    28 KB (4,153 words) - 15:37, 11 January 2024
  • ...g the back and front lip adjacent to the base course, is completely coated so that the moisture in the concrete is sealed in.
    12 KB (1,916 words) - 11:49, 19 January 2022
  • ...e vehicle is backed up only when an observer signals that it is safe to do so.''
    13 KB (1,841 words) - 11:18, 13 July 2023

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)