Search results

Jump to navigation Jump to search
  • These items will apply to locations outside the areas to be paid as '''Clearing'''. Pay quantity is shown when work for each item is completed.
    2 KB (326 words) - 10:07, 13 September 2023
  • ...nforced or nonreinforced concrete. [[601 - PCC Pavement Mixtures|Division 6]] of this manual should be referenced for concrete construction. Thickness <center>6 inches (150 mm)</center>
    5 KB (706 words) - 11:49, 19 January 2022
  • Protection of adjacent sidewalk, curb or gutter, or other items not required to be removed, but endangered by sloping to the angle of repos ...Precast concrete footings must be supported by placing them on a compacted 6 inch (150 mm) subbase of Granular Material Class II.
    7 KB (999 words) - 17:47, 12 January 2022
  • ...re is used to select project pay items to sample which represent the major items of work on the project and/or account for large portions of the project fun ...vailable with the Construction Contracts Unit, Construction Field Services Division.
    19 KB (2,779 words) - 17:01, 6 November 2023
  • ...ight to a depth of 9 inches (250 mm). Compacting original ground is not a pay item in this instance. Density tests are required for documentation. ...ackfill in this instance is included in the contract unit prices for other items).
    7 KB (1,044 words) - 10:08, 13 September 2023
  • ...hen the contractor submits a conceptual or final VECP, it must include all items required by the special provision and Form 1962, Value Engineering Change P ...gh the Construction Operations Engineer in the Construction Field Services Division. The VEDT membership will consist of the following individuals (or their de
    9 KB (1,297 words) - 14:57, 11 October 2022
  • ...ecified contract time. These liquidated damages will be identified as the pay item “Liquidated Damages, Oversight”. .... Liquidated damages for other department costs will be identified as the pay item “Liquidated Damages, Other”.
    9 KB (1,338 words) - 10:01, 27 July 2022
  • ...zing. Also, since these items on bridge or road jobs are some of the last items cast, late season work is likely. Dowels between barrier and base are to be spaced 6 feet (2 m) center to center on each side. Check to see that the base concr
    6 KB (929 words) - 11:50, 19 January 2022
  • ...rminal, Type ___''' or '''Guardrail Anchorage, Bridge, Detail'''. The pay items will be generic and based on usage (approach/departing, flared/non-flared, ...foot (3 m) straightedge. Variation of more than 1/4 inch in 10 feet (6 mm in 3 m) must be remedied.
    7 KB (988 words) - 10:53, 8 April 2024
  • !Updated!! Division !! Section !! Summary !! What Changed |<center>6/9/2020</center>||<center>1 Supplemental</center>||<center>[[Interim_File_Re
    16 KB (2,430 words) - 15:46, 6 May 2021
  • ...s and diameters of investigation. As stated in the special provision, the pay item will compensate the Contractor to locate and expose underground infras ...the Standard Specifications for Construction]. The special provision and pay item are not to be used to expose existing marked utilities as that is a re
    10 KB (1,390 words) - 10:07, 13 September 2023
  • ...struction project. Temporary structures also include temporary works type items such as falsework, formwork, work platforms or scaffolding and temporary ea ...y included to cover this work. Check the plans and specifications for pay items, and method of payment.
    19 KB (2,733 words) - 11:47, 19 January 2022
  • <center><span STYLE="font: 15pt arial;">''Construction Field Services Division''</span></center> !Updated!! Division !! Section !! Summary !! What Changed
    67 KB (8,623 words) - 17:18, 11 April 2024
  • ...re concrete mixtures is included in the unit prices for other relevant pay items. 0 – 6
    12 KB (1,593 words) - 13:11, 26 July 2022
  • <center><span STYLE="font: 40pt arial;">'''Division 2 Supplemental Information'''</span></center> ...logy Environmental Compliance Group will receive the original invoices and pay the invoices by way of payment voucher(s). A copy of which will be sent to
    9 KB (1,330 words) - 14:21, 23 September 2021
  • ...00 with a contract modification containing the following contract revision items: In accordance with 23 CFR 635.102 and 23 CFR 635.120, FHWA’s Michigan Division has further clarified the definition of major changes as noted below:
    50 KB (7,380 words) - 16:11, 1 April 2024
  • <center><span STYLE="font: 40pt arial;">'''Division 7 Supplemental Information'''</span></center> ...e coordinated with the Standard Specifications for Construction, Divisions 6 and 7 of the Construction Manual, Special Provision 12SP604B QUALITY CONTRO
    33 KB (4,932 words) - 16:38, 12 May 2021
  • <center>6</center> The following items may be accepted on the basis of conventional field testing (slump, air and
    21 KB (3,052 words) - 16:41, 22 November 2023
  • ...criteria apply in the application of the various permanent erosion control items. ...en used in areas subject to future mowing. These areas include a 20 foot (6 m) strip along the top of the foreslope adjacent to the shoulder and everyw
    15 KB (2,398 words) - 13:12, 26 July 2022
  • ...atching begins, the Engineer and the inspector should review the following items: ...ive on the project site, they must be visually inspected for the following items.
    23 KB (3,714 words) - 10:16, 13 September 2023

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)