Search results

Jump to navigation Jump to search
  • <center><span STYLE="font: 60pt arial;">'''403'''</span></center> ...rd Specifications for Construction and as described under [[401 - Culverts|Section 401, Backfilling of Culverts]] of this manual.
    7 KB (999 words) - 17:47, 12 January 2022
  • <center><span STYLE="font: 50pt arial;">'''Section 701'''</span></center> ...01%20PCC%20for%20Structures.pdf Standard Specifications for Construction - Section 701].'''</span></center>
    12 KB (1,593 words) - 13:11, 26 July 2022
  • ...pipe will be subjected to rejection if any defects, noted in the previous section for culvert pipe, are found. In addition, non-reinforced concrete sewer pi ...des given, bells or grooves upgrade, ends fully and closely jointed. Each section shall have full, firm bearing throughout its length. All pipe sections/joi
    16 KB (2,323 words) - 17:47, 12 January 2022
  • ...he pavement surface, in one or more passes, to the required grade or cross section. ..., dried-out surfaces must be re-compacted and restored to the proper cross section. Saturated areas must be allowed to dry prior to placing mixture. The agg
    139 KB (21,114 words) - 15:08, 30 January 2024