Search results

Jump to navigation Jump to search
  • ...ated with contractors, consultants and their contracts. Because there are so many individuals working on various parts of program delivery, it is critic ...ies or activities, such as those mentioned, to Contract Services Division, so that we can follow up with whatever reviews are necessary. For the vast ma
    2 KB (265 words) - 09:41, 3 January 2018
  • ...tion. Adequate dust control measures will be maintained by the Contractor so as not to cause detriment to the safety, health, welfare or comfort of any
    686 bytes (98 words) - 17:36, 12 January 2022
  • -- Generate four different tidyVal functions, so that we don't have to check the -- or from the debug console, so assume that we were passed a table of args
    8 KB (1,311 words) - 09:28, 3 July 2014
  • ...jboss.state.mi.us/webforms/GetDocument.htm?fileName=1178.pdf Form 1178]'', so the test report can be obtained if necessary. One exception is for borderl
    1 KB (163 words) - 17:32, 12 January 2022
  • -- titles will probably only be a problem during testing, so we choose the best -- of the old template was to assume the page was not a subpage, so we will do
    13 KB (1,547 words) - 09:28, 3 July 2014
  • ...not be placed within 5 feet (1.5 m) of the spring point of a street return so that the transverse joint will function properly. ...ion (Protection and Restoration of Property), and the Contractor should be so reminded prior to commencing work.
    7 KB (999 words) - 17:47, 12 January 2022
  • ...ature are to be coordinated and discussed with Construction Field Services so appropriate material testing and evaluation can be performed. One example o ...necessary, the Contractor is required to provide access to stored material so that a thorough inspection may be made. The basis of acceptance, testing
    5 KB (767 words) - 14:44, 21 September 2023
  • ...amped in 12 inches (300 mm) layers. Care should be taken in driving posts so that they are properly placed and plumb. Incorrect spacing may not be corr ...a string line held along the face of a rail section. Rail should be hung so that the rail elements overlap in the direction of traffic. For a guardrai
    7 KB (988 words) - 10:53, 8 April 2024
  • ...accordance with the specifications and the intent of the Soils personnel, so that complete interception and collection of groundwater is accomplished. ...It is extremely important that geotextile trench wraps be properly placed so that no “windows” occur that would allow soil to bypass the wrap and be
    6 KB (843 words) - 17:47, 12 January 2022
  • ...cking. A straightedge should be placed across the walk to guide the edger so that a straight joint is constructed.
    3 KB (465 words) - 11:50, 19 January 2022
  • * Is the schedule sufficiently detailed so that progress can be monitored? Does the work plan make sense? Are there ob ...pdated. It is highly recommended to update the schedule on a monthly basis so that it can continue to assist the project team (Engineer and Contractor) a
    8 KB (1,206 words) - 14:27, 29 February 2024
  • ...ubblizing Contractor and paving Contractor should coordinate these efforts so any area open to traffic has at least an initial leveling course (scratch c
    4 KB (536 words) - 14:18, 16 February 2022
  • -- so that we don't have to worry about unclosed tags. .css('clear', 'both') -- So right or left floating items don't stick out of the doc box.
    35 KB (4,418 words) - 09:28, 3 July 2014
  • ...able, the authorizing division should be notified of the specific concerns so that they may follow up with the railroad company. The bill should be reta ...t, and balancing contract modification will be sent to the project manager so the project files may be closed out in a timely manner.
    12 KB (1,772 words) - 17:35, 14 December 2023
  • ...eserved for use. In light, sandy soils the stripping should be controlled so that the thin layer of organic surface material is not unduly diluted with ..., seeded, fertilized and mulched, it is desirable to pre-measure this area so the Contractor may determine amounts of materials to be placed in order to
    15 KB (2,398 words) - 13:12, 26 July 2022
  • ...al, or who aids in such activities without being lawfully authorized to do so can be found guilty of a felony punishable by up to 10 years in prison and
    5 KB (738 words) - 13:42, 1 April 2024
  • ...T quantity measurement, and MDOT Inspector’s Daily Reports. Failure to do so will jeopardize full federal-aid participation.
    6 KB (848 words) - 14:44, 19 January 2022
  • ...consultant to carry out the oversight duties of the MRC, however by doing so, the MRC is not relieved of being the responsible charge as required by the ...struction engineering, contract administration, and/or program compliance, so the MRC maintains overall project oversight as required by the CFR.
    30 KB (4,182 words) - 18:40, 13 December 2023
  • -- If we are using a div, redefine imageLeftCell so that the image -- If we are using a div, redefine imageRightCell so that the image
    18 KB (2,535 words) - 09:28, 3 July 2014
  • ...ify if cross bracing of the temporary support columns are required, and if so, verify the cross bracing welds are sufficient. ...restraint during the heating process and applying heat in select locations so that when the steel cools it moves back into place. Mechanically straighten
    14 KB (2,289 words) - 17:29, 10 April 2023

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)