Pages without language links

Jump to navigation Jump to search

The following pages do not link to other language versions.

Showing below up to 100 results in range #71 to #170.

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)

  1. 107.18 Work over Navigable Waters
  2. 107.19 Hauling on Local Roads and Streets
  3. 107.20 Private Railroad Crossing for Haul Purposes
  4. 107.21 Open to Traffic
  5. 108.01 Subcontracting of Contract Work
  6. 108.02 Limitations of Operations
  7. 108.03 Competence of Workers
  8. 108.04 Adequacy of Methods and Equipment
  9. 108.05 Progress Schedule
  10. 108.06 Determination of Contract Time for Work Day Contracts
  11. 108.07 Extension of Time on Work Day Contracts
  12. 108.08 Extension of Time on Calendar Day Contracts
  13. 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts
  14. 108.10 Liquidated Damages
  15. 108.11 Default of Contract
  16. 108.12 Termination of Contract
  17. 109.01 Measurement of Quantities
  18. 109.02 Scope of Payment
  19. 109.03 Payments for Increased or Decreased Quantities
  20. 109.04 Progress and Partial Payments
  21. 109.05 Payment for Contract Revisions
  22. 109.06 Source of Supply and Carrier Rates on Materials
  23. 109.07 Final Inspection, Acceptance, and Final Payment
  24. 109.08 Prompt Payment
  25. 150 - Mobilization
  26. 201 - Clearing
  27. 202 - Removing Trees, Stumps, and Corduroy
  28. 203 - Removing Drainage Structures, Culverts, and Sewers
  29. 204 - Removing Miscellaneous Structures and Materials
  30. 205 - Roadway Earthwork
  31. 206 - Excavation and Backfill for Structures
  32. 207 - Obliterating Roadway
  33. 208 - Soil Erosion and Sedimentation Control (NPDES)
  34. 209 - Project Cleanup
  35. 301 - Subbase
  36. 302 - Aggregate Base Courses
  37. 303 - Open Graded Drainage Course
  38. 304 - Rubbilizing Existing PCC Pavement
  39. 305 - HMA Base Crushing and Shaping
  40. 306 - Aggregate Surface Course
  41. 307 - Aggregate Shoulders and Approaches
  42. 308 - Geotextiles for Base
  43. 401 - Culverts
  44. 402 - Storm Sewers
  45. 403 - Drainage Structures
  46. 404 - Underdrain
  47. 405 - Pump Station Construction
  48. 406 - Precast Three-Sided, Arch, and Box Culverts
  49. 501 - Plant Produced Hot Mix Asphalt
  50. 502 - HMA Crack Treatment
  51. 503 - Paver Placed Surface Seal
  52. 504 - Micro-Surfacing
  53. 505 - Chip Seals
  54. 506 - Slurry Seal
  55. 602 - Concrete Pavement Construction
  56. 603 - Concrete Pavement Restoration
  57. 700 - Closure of Unsafe Structures
  58. 701 - Portland Cement Concrete for Structures
  59. 702 - Mortar and Grout
  60. 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes
  61. 704 - Steel Sheet Piling and Cofferdams
  62. 705 - Foundation Piling
  63. 706 - Structural Concrete
  64. 707 - Structural Steel
  65. 708 - Prestressed Concrete
  66. 709 - Timber Sturctures
  67. 710 - Waterproofing and Protective Covers
  68. 711 - Bridge Railings
  69. 712 - Bridge Rehabilitation, Concrete
  70. 713 - Bridge Rehabilitation, Steel
  71. 714 - Temporary Structures and Approaches
  72. 715 - Cleaning and Coating Existing Structural Steel
  73. 716 - Shop Cleaning and Coating Structural Steel
  74. 717 - Downspouts and Drains
  75. 718 - Drilled Shafts
  76. 719 - Earth Retaining Structures
  77. 801 - Concrete Driveways
  78. 802 - Concrete Curb, Gutter, and Dividers
  79. 803 - Concrete Sidewalk, Ramps, and Steps
  80. 804 - Concrete Barriers and Glare Screens
  81. 805 - Hot Mix Asphalt Curb
  82. 806 - Bicycle Paths
  83. 807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts
  84. 808 - Fencing
  85. 809 - Field Office
  86. 810 - Permanent Traffic Signs and Supports
  87. 811 - Permanent Pavement Markings
  88. 812 - Temporary Traffic Control for Construction Zone Operations
  89. 813 - Slope Protection
  90. 814 - Paved Ditches
  91. 815 - Landscaping
  92. 816 - Turf Establishment
  93. 817 - Landscape Mowing
  94. 819 - Electrical and Lighting
  95. 820 - Traffic Signals
  96. 821 - Preservation of Land Monuments and Property Corners
  97. 822 - Ground or Cut Centerline and Shoulder Corrugations
  98. 823 - Water Mains
  99. 824 - Contractor Staking
  100. 825 - Sanitary Sewer Systems

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)