Pages without language links

Jump to: navigation, search

The following pages do not link to other language versions.

Prefix 

Showing below up to 244 results starting with #1.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

  1. 101.04 - Inspector's Daily Reports
  2. Invalid title with namespace "(Main)" and text "101.4_INSPECTOR’S_DAILY_REPORT_(IDR)"
  3. 101 - Terms, Format, and Conditions
  4. 102.01 Prequalification of Bidders
  5. 102.02 Contents of Proposal - Progress Clause
  6. 102.03 Interpretation of Bid Items in the Proposal
  7. 102.04 Examination of Plans, Specifications, and Work Site
  8. 102.05 Preparation of Bid Items in the Proposal
  9. 102.06 Irregular Bids
  10. 102.07 Delivery of Bid
  11. 102.08 Withdrawal or Revision of Bid
  12. 102.09 Downloading of Bids
  13. 102.10 Bid Review
  14. 102.11 Bid Rejection
  15. 102.12 Bid Rejection Appeal
  16. 102.13 Consideration of Bids
  17. 102.15 Execution and Award of Contract
  18. 102.16 Requirements of Contract Bonds
  19. 102.17 Bid Guaranty Payment
  20. 102.18 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs)
  21. 103.01 Intent of the Contract
  22. 103.02 Contract Revisions
  23. 103.03 Contractor Engineer Communication
  24. 104.01 Authority of the Department
  25. 104.02 Plans and Working Drawings
  26. 104.03 Deviations from the Plans
  27. 104.04 Conformity with the Contrat
  28. 104.05 Removal of Unauthorized Work
  29. 104.06 Coordination of Drawing Dimensions and Contract Documentation
  30. 104.07 Contractor Obligations
  31. 104.08 Cooperation by the Contractor
  32. 104.09 Lines, Grades, and Elevations
  33. 104.10 Contractor Claim for Extra Compensation or Time Extension
  34. 104.11 Work Zone Safety and Mobility
  35. 104.12 Approval for Use of the Right of Way
  36. 105.01 Quality and Scope of Supply
  37. 105.02 Natural Material Sources Found Within the Excavation Limits
  38. 105.03 Borrow Materials
  39. 105.04 Miscellameous Quantities
  40. 105.05 Approval of Materials Incorporated into the Work
  41. 105.06 Storage of Materials
  42. 105.07 Handling and Transporting Materials
  43. 105.08 Nonconforming Materials
  44. 105.09 Materials not Incorporated into the Work
  45. 105.10 Buy America Source of Steel and Iron
  46. 106 - Quality Assurance Acceptance Program
  47. 107.01 Laws to be Observed
  48. 107.02 Permits and Licenses
  49. 107.03 Patented Process and Materials
  50. 107.04 Federal Aid Participation
  51. 107.05 Sanitary Provisions
  52. 107.06 Furnishing Right-of-Way
  53. 107.07 Protection and Restoration of Property
  54. 107.08 Land Monuments and Property Corners
  55. 107.09 Archeological and Historical Findings
  56. 107.10 Indemnification, Damage Liability, and Insurance
  57. 107.11 Contractor's Responsibility for the Work
  58. 107.12 Contractor's Responsibility for Utility Property and Services
  59. 107.13 Personal Liability of Public Officials
  60. 107.14 No Waiver of Legal Rights
  61. 107.15 Compliance with Laws; Environmental Protection
  62. 107.16 Forest Protection
  63. 107.17 Use of Explosives
  64. 107.18 Work over Navigable Waters
  65. 107.19 Hauling on Local Roads and Streets
  66. 107.20 Private Railroad Crossing for Haul Purposes
  67. 107.21 Open to Traffic
  68. 108.01 Subcontracting of Contract Work
  69. 108.02 Limitations of Operations
  70. 108.03 Competence of Workers
  71. 108.04 Adequacy of Methods and Equipment
  72. 108.05 Progress Schedule
  73. 108.06 Determination of Contract Time for Work Day Contracts
  74. 108.07 Extension of Time on Work Day Contracts
  75. 108.08 Extension of Time on Calendar Day Contracts
  76. 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts
  77. 108.10 Liquidated Damages
  78. 108.11 Default of Contract
  79. 108.12 Termination of Contract
  80. 109.01 Measurement of Quantities
  81. 109.02 Scope of Payment
  82. 109.03 Payments for Increased or Decreased Quantities
  83. 109.04 Progress and Partial Payments
  84. 109.05 Payment for Contract Revisions
  85. 109.06 Source of Supply and Carrier Rates on Materials
  86. 109.07 Final Inspection, Acceptance, and Final Payment
  87. 109.08 Prompt Payment
  88. 150 - Mobilization
  89. 2010 Updates
  90. 2011 Updates
  91. 2012 Updates
  92. 2013 Updates
  93. 201 - Clearing
  94. 202 - Removing Trees, Stumps, and Corduroy
  95. 203 - Removing Drainage Structures, Culverts, and Sewers
  96. 204 - Removing Miscellaneous Structures and Materials
  97. 205 - Roadway Earthwork
  98. 206 - Excavation and Backfill for Structures
  99. 207 - Obliterating Roadway
  100. 208 - Soil Erosion and Sedimentation Control (NPDES)
  101. 209 - Project Cleanup
  102. 301 - Subbase
  103. 302 - Aggregate Base Courses
  104. 303 - Open Graded Drainage Course
  105. 304 - Rubbilizing Existing PCC Pavement
  106. 305 - HMA Base Crushing and Shaping
  107. 306 - Aggregate Surface Course
  108. 307 - Aggregate Shoulders and Approaches
  109. 308 - Geotextiles for Base
  110. 401 - Culverts
  111. 402 - Storm Sewers
  112. 403 - Drainage Structures
  113. 404 - Underdrain
  114. 405 - Pump Station Construction
  115. 406 - Precast Three-Sided, Arch, and Box Culverts
  116. 501 - Plant Produced Hot Mix Asphalt
  117. 502 - HMA Crack Treatment
  118. 503 - Paver Placed Surface Seal
  119. 504 - Micro-Surfacing
  120. 505 - Chip Seals
  121. 506 - Slurry Seal
  122. 601 - PCC Pavement Mixtures
  123. 602 - Concrete Pavement Construction
  124. 603 - Concrete Pavement Restoration
  125. 604 - Contractor Quality Control for Concrete
  126. 605 - Contractor Quality Assurance for Concrete
  127. 701-Portland Cement Concrete for Structures
  128. 701 - Portland Cement Concrete for Structures
  129. 702 - Mortar and Grout
  130. 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes
  131. 704 - Steel Sheet Piling and Cofferdams
  132. 705 - Foundation Piling
  133. 706 - Structural Concrete
  134. 707 - Structural Steel
  135. 708 - Prestressed Concrete
  136. 709 - Timber Sturctures
  137. 710 - Waterproofing and Protective Covers
  138. 711 - Bridge Railings
  139. 712 - Bridge Rehabilitation, Concrete
  140. 713 - Bridge Rehabilitation, Steel
  141. 714 - Temporary Structures and Approaches
  142. 715 - Cleaning and Coating Existing Structural Steel
  143. 716 - Shop Cleaning and Coating Structural Steel
  144. 717 - Downspouts and Drains
  145. 718 - Drilled Shafts
  146. 719 - Earth Retaining Structures
  147. 801 - Concrete Driveways
  148. 802 - Concrete Curb, Gutter, and Dividers
  149. 803 - Concrete Sidewalk, Ramps, and Steps
  150. 804 - Concrete Barriers and Glare Screens
  151. 805 - Hot Mix Asphalt Curb
  152. 806 - Bicycle Paths
  153. 807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts
  154. 808 - Fencing
  155. 809 - Field Office
  156. 810 - Permanent Traffic Signs and Supports
  157. 811 - Permanent Pavement Markings
  158. 812 - Temporary Traffic Control for Construction Zone Operations
  159. 813 - Slope Protection
  160. 814 - Paved Ditches
  161. 815 - Landscaping
  162. 816 - Turf Establishment
  163. 817 - Landscape Mowing
  164. 818 - Dune Grass Planting
  165. 819 - Electrical and Lighting
  166. 820 - Traffic Signals
  167. 821 - Preservation of Land Monuments and Property Corners
  168. 822 - Ground or Cut Centerline and Shoulder Corrugations
  169. 823 - Water Mains
  170. 824 - Contractor Staking
  171. Apprentices and Trainees
  172. Certified Engineer Process
  173. Certified Office Technician Process
  174. Commentary - Special Provision for Quality Control and Acceptance of Portland Cement Concrete 12SP604(B)
  175. Construction Field Services Indirect Testing Charges
  176. Construction Manual Wiki Tips
  177. Construction Technology Support Resources
  178. Construction Value Engineering Change Proposal (VECP)
  179. Content Revision Procedures
  180. Contract Administration and Oversight Guidelines for Intelligent Transportation Systems (ITS) Projects
  181. Contract Administration and Oversight Guidelines for Projects Containing Warranty Work
  182. Contractor's Equipment and Traffic Control
  183. Davis-Bacon and State Prevailing Wage Information
  184. Dev Page
  185. Disadvantaged Business Enterprises (DBE)
  186. Dispute Review Board (DRB)
  187. Invalid title with namespace "(Main)" and text "Division_1_–_General_Provisions"
  188. Division 2 Supplemental Information
  189. Division 3 Supplemental Information
  190. Division 7 Supplemental Information
  191. E-Construction
  192. E-Signature
  193. Extending Project Limits
  194. FHWA CAP Action Plans
  195. FPR Frequently Asked Questions
  196. FieldManager
  197. Final Project Review
  198. Final Project Review Report
  199. Frequently Searched Items
  200. Holiday Traffic Safety Provisions
  201. Hot Mix Asphalt Production Manual
  202. Information Sharing About Construction Contractors and Consultants
  203. Interim File Review
  204. LCPtracker Supplemental Information
  205. Letter to File
  206. Local Agency Program (LAP)
  207. Main Page
  208. Mandrel Testing of Plastic Pipe
  209. Manual Section and Page Number
  210. Materials Quality Assurance Procedures Manual
  211. Module:Arguments
  212. Module:Category handler
  213. Module:Documentation
  214. Module:Documentation/config
  215. Module:HtmlBuilder
  216. Module:Message box
  217. Module:Message box/configuration
  218. Module:Namespace detect
  219. Module:Namespace detect/config
  220. Module:Namespace detect/data
  221. Module:Yesno
  222. Notice of Non-Compliance with Contract Requirements
  223. Oversight of Maintenance Funded Projects Using the Michigan Department of Transportation Letting System
  224. Pavement Historical Database
  225. Plans, Proposal, Input, Review and Evaluation
  226. Preconstruction Meeting
  227. Prevailing Wage Oversight Procedures
  228. Process for Documenting Certified Materials in FieldManager
  229. Processing Sewage/Storm Water Damage Claims
  230. Project Closeout Escalation of Accountability
  231. Project Delays Due to a Utility Company
  232. Project with Consultant Oversight
  233. Projects with Incentive Provisions
  234. Quality Initiatives and Adjustments
  235. Railroad Highway Projects
  236. Revision Navigation
  237. Section 601 - Portland Cement Concrete for Pavements
  238. Section 701 - Portland Cement Concrete for Structures
  239. Structural Fabrication Quality Manual
  240. Table of Contents Division 1
  241. Table of Contents Division 1 Supplemental
  242. Table of Contents by Project Phase
  243. Weight Limit Waivers
  244. Work Order

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

Personal tools
Namespaces

Variants
Views
Actions
Navigation
Division 2 - Earthwork
Division 3 - Base Courses
Division 4 - Drainage Features
Division 5 - HMA Pavements and Surface Treatments
Division 6 - PCC Pavement Mixtures
Division 7 - Structures
Division 8 - Incidental Construction
Toolbox