Pages without language links
Jump to navigation
Jump to search
The following pages do not link to other language versions.
Showing below up to 50 results in range #31 to #80.
View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)
- 104.01 Authority of the Department
- 104.02 Plans and Working Drawings
- 104.03 Deviations from the Plans
- 104.04 Conformity with the Contrat
- 104.05 Removal of Unauthorized Work
- 104.06 Coordination of Drawing Dimensions and Contract Documentation
- 104.07 Contractor Obligations
- 104.08 Cooperation by the Contractor
- 104.09 Lines, Grades, and Elevations
- 104.10 Claim for Extra Compensation or Extension of Time
- 104.11 Work Zone Safety and Mobility
- 104.12 Approval for Use of the Right of Way
- 105.01 Quality and Scope of Supply
- 105.02 Natural Material Sources Found Within the Excavation Limits
- 105.03 Borrow Materials
- 105.04 Miscellameous Quantities
- 105.05 Approval of Materials Incorporated into the Work
- 105.06 Storage of Materials
- 105.07 Handling and Transporting Materials
- 105.08 Nonconforming Materials
- 105.09 Materials not Incorporated into the Work
- 105.10 Buy America Source of Steel and Iron
- 106 - Quality Assurance Acceptance Program
- 107.01 Laws to be Observed
- 107.02 Permits and Licenses
- 107.03 Patented Process and Materials
- 107.04 Federal Aid Participation
- 107.05 Sanitary Provisions
- 107.06 Furnishing Right-of-Way
- 107.07 Protection and Restoration of Property
- 107.08 Land Monuments and Property Corners
- 107.09 Archeological and Historical Findings
- 107.10 Indemnification, Damage Liability, and Insurance
- 107.11 Contractor's Responsibility for the Work
- 107.12 Contractor's Responsibility for Utility Property and Services
- 107.13 Personal Liability of Public Officials
- 107.14 No Waiver of Legal Rights
- 107.15 Compliance with Laws; Environmental Protection
- 107.16 Forest Protection
- 107.17 Use of Explosives
- 107.18 Work over Navigable Waters
- 107.19 Hauling on Local Roads and Streets
- 107.20 Private Railroad Crossing for Haul Purposes
- 107.21 Open to Traffic
- 108.01 Subcontracting of Contract Work
- 108.02 Limitations of Operations
- 108.03 Competence of Workers
- 108.04 Adequacy of Methods and Equipment
- 108.05 Progress Schedule
- 108.06 Determination of Contract Time for Work Day Contracts