Pages without language links

Jump to navigation Jump to search

The following pages do not link to other language versions.

Showing below up to 230 results in range #21 to #250.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. 102.13 Consideration of Bids
  2. 102.14 Execution and Award of Contract
  3. 102.15 Requirements of Contract Bonds
  4. 102.16 Bid Guaranty Payment
  5. 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs)
  6. 102.18 - OJT Program
  7. 102.19 Evaluation of Contractor Performance and Contract Non-Compliance
  8. 103.01 Intent of the Contract
  9. 103.02 Contract Revisions
  10. 103.03 Contractor Engineer Communication
  11. 104.01 Authority of the Department
  12. 104.02 Plans and Working Drawings
  13. 104.03 Deviations from the Plans
  14. 104.04 Conformity with the Contrat
  15. 104.05 Removal of Unauthorized Work
  16. 104.06 Coordination of Drawing Dimensions and Contract Documentation
  17. 104.07 Contractor Obligations
  18. 104.08 Cooperation by the Contractor
  19. 104.09 Lines, Grades, and Elevations
  20. 104.10 Claim for Extra Compensation or Extension of Time
  21. 104.11 Work Zone Safety and Mobility
  22. 104.12 Approval for Use of the Right of Way
  23. 105.01 Quality and Scope of Supply
  24. 105.02 Natural Material Sources Found Within the Excavation Limits
  25. 105.03 Borrow Materials
  26. 105.04 Miscellameous Quantities
  27. 105.05 Approval of Materials Incorporated into the Work
  28. 105.06 Storage of Materials
  29. 105.07 Handling and Transporting Materials
  30. 105.08 Nonconforming Materials
  31. 105.09 Materials not Incorporated into the Work
  32. 105.10 Buy America Source of Steel and Iron
  33. 106 - Quality Assurance Acceptance Program
  34. 107.01 Laws to be Observed
  35. 107.02 Permits and Licenses
  36. 107.03 Patented Process and Materials
  37. 107.04 Federal Aid Participation
  38. 107.05 Sanitary Provisions
  39. 107.06 Furnishing Right-of-Way
  40. 107.07 Protection and Restoration of Property
  41. 107.08 Land Monuments and Property Corners
  42. 107.09 Archeological and Historical Findings
  43. 107.10 Indemnification, Damage Liability, and Insurance
  44. 107.11 Contractor's Responsibility for the Work
  45. 107.12 Contractor's Responsibility for Utility Property and Services
  46. 107.13 Personal Liability of Public Officials
  47. 107.14 No Waiver of Legal Rights
  48. 107.15 Compliance with Laws; Environmental Protection
  49. 107.16 Forest Protection
  50. 107.17 Use of Explosives
  51. 107.18 Work over Navigable Waters
  52. 107.19 Hauling on Local Roads and Streets
  53. 107.20 Private Railroad Crossing for Haul Purposes
  54. 107.21 Open to Traffic
  55. 108.01 Subcontracting of Contract Work
  56. 108.02 Limitations of Operations
  57. 108.03 Competence of Workers
  58. 108.04 Adequacy of Methods and Equipment
  59. 108.05 Progress Schedule
  60. 108.06 Determination of Contract Time for Work Day Contracts
  61. 108.07 Extension of Time on Work Day Contracts
  62. 108.08 Extension of Time on Calendar Day Contracts
  63. 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts
  64. 108.10 Liquidated Damages
  65. 108.11 Default of Contract
  66. 108.12 Termination of Contract
  67. 109.01 Measurement of Quantities
  68. 109.02 Scope of Payment
  69. 109.03 Payments for Increased or Decreased Quantities
  70. 109.04 Progress and Partial Payments
  71. 109.05 Payment for Contract Revisions
  72. 109.06 Source of Supply and Carrier Rates on Materials
  73. 109.07 Final Inspection, Acceptance, and Final Payment
  74. 109.08 Prompt Payment
  75. 150 - Mobilization
  76. 201 - Clearing
  77. 202 - Removing Trees, Stumps, and Corduroy
  78. 203 - Removing Drainage Structures, Culverts, and Sewers
  79. 204 - Removing Miscellaneous Structures and Materials
  80. 205 - Roadway Earthwork
  81. 206 - Excavation and Backfill for Structures
  82. 207 - Obliterating Roadway
  83. 208 - Soil Erosion and Sedimentation Control (NPDES)
  84. 209 - Project Cleanup
  85. 301 - Subbase
  86. 302 - Aggregate Base Courses
  87. 303 - Open Graded Drainage Course
  88. 304 - Rubbilizing Existing PCC Pavement
  89. 305 - HMA Base Crushing and Shaping
  90. 306 - Aggregate Surface Course
  91. 307 - Aggregate Shoulders and Approaches
  92. 308 - Geotextiles for Base
  93. 401 - Culverts
  94. 402 - Storm Sewers
  95. 403 - Drainage Structures
  96. 404 - Underdrain
  97. 405 - Pump Station Construction
  98. 406 - Precast Three-Sided, Arch, and Box Culverts
  99. 501 - Plant Produced Hot Mix Asphalt
  100. 502 - HMA Crack Treatment
  101. 503 - Paver Placed Surface Seal
  102. 504 - Micro-Surfacing
  103. 505 - Chip Seals
  104. 506 - Slurry Seal
  105. 602 - Concrete Pavement Construction
  106. 603 - Concrete Pavement Restoration
  107. 700 - Closure of Unsafe Structures
  108. 701 - Portland Cement Concrete for Structures
  109. 702 - Mortar and Grout
  110. 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes
  111. 704 - Steel Sheet Piling and Cofferdams
  112. 705 - Foundation Piling
  113. 706 - Structural Concrete
  114. 707 - Structural Steel
  115. 708 - Prestressed Concrete
  116. 709 - Timber Sturctures
  117. 710 - Waterproofing and Protective Covers
  118. 711 - Bridge Railings
  119. 712 - Bridge Rehabilitation, Concrete
  120. 713 - Bridge Rehabilitation, Steel
  121. 714 - Temporary Structures and Approaches
  122. 715 - Cleaning and Coating Existing Structural Steel
  123. 716 - Shop Cleaning and Coating Structural Steel
  124. 717 - Downspouts and Drains
  125. 718 - Drilled Shafts
  126. 719 - Earth Retaining Structures
  127. 801 - Concrete Driveways
  128. 802 - Concrete Curb, Gutter, and Dividers
  129. 803 - Concrete Sidewalk, Ramps, and Steps
  130. 804 - Concrete Barriers and Glare Screens
  131. 805 - Hot Mix Asphalt Curb
  132. 806 - Bicycle Paths
  133. 807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts
  134. 808 - Fencing
  135. 809 - Field Office
  136. 810 - Permanent Traffic Signs and Supports
  137. 811 - Permanent Pavement Markings
  138. 812 - Temporary Traffic Control for Construction Zone Operations
  139. 813 - Slope Protection
  140. 814 - Paved Ditches
  141. 815 - Landscaping
  142. 816 - Turf Establishment
  143. 817 - Landscape Mowing
  144. 819 - Electrical and Lighting
  145. 820 - Traffic Signals
  146. 821 - Preservation of Land Monuments and Property Corners
  147. 822 - Ground or Cut Centerline and Shoulder Corrugations
  148. 823 - Water Mains
  149. 824 - Contractor Staking
  150. 825 - Sanitary Sewer Systems
  151. 826 – Intelligent Transportation Systems
  152. 900 - Materials
  153. CONSTRUCTION MANUAL CONTENT TEMPLATE
  154. Certified Engineer Process
  155. Certified Office Technician Process
  156. Construction Field Services Indirect Testing Charges
  157. Construction Manual Wiki Tips
  158. Construction Technology Support Resources
  159. Construction Value Engineering Change Proposal (VECP)
  160. Contract Administration and Oversight Guidelines for Intelligent Transportation Systems (ITS) Projects
  161. Contract Administration and Oversight Guidelines for Projects Containing Warranty Work
  162. Contractor's Equipment and Traffic Control
  163. Density Training Videos
  164. Dev Page
  165. Digital Calculations for Payment
  166. Disadvantaged Business Enterprises (DBE)
  167. Dispute Review Board (DRB)
  168. Invalid title with namespace "(Main)" and text "Division_1_–_General_Provisions"
  169. Division 2 Supplemental Information
  170. Division 3 Supplemental Information
  171. Division 4 Supplemental Information
  172. Division 7 Supplemental Information
  173. E-Construction
  174. E-Signature
  175. Extending Project Limits
  176. FHWA CAP Action Plans
  177. FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
  178. FPR Frequently Asked Questions
  179. FieldManager
  180. Final Project Review
  181. Final Project Review Report
  182. Force Account Work
  183. Frequently Searched Items
  184. Holiday Traffic Safety Provisions
  185. Hot Mix Asphalt Production Manual
  186. Information Sharing About Construction Contractors and Consultants
  187. Interim File Review
  188. Letter to File
  189. Local Agency Program (LAP)
  190. MDOT Construction Manual Content Revision Procedures
  191. MDOT Construction Manual Style Guide
  192. MDOT DENSITY TESTING AND INSPECTION MANUAL
  193. Main Page
  194. Mandrel Testing of Plastic Pipe
  195. Materials Quality Assurance Procedures Manual
  196. Module:Arguments
  197. Module:Category handler
  198. Module:Documentation
  199. Module:Documentation/config
  200. Module:HtmlBuilder
  201. Module:Message box
  202. Module:Message box/configuration
  203. Module:Namespace detect
  204. Module:Namespace detect/config
  205. Module:Namespace detect/data
  206. Module:Yesno
  207. New CM Format Code
  208. Notice of Non-Compliance with Contract Requirements
  209. Oversight of Maintenance Funded Projects Using the Michigan Department of Transportation Letting System
  210. Pavement Historical Database
  211. Plans, Proposal, Input, Review and Evaluation
  212. Preconstruction Meeting
  213. Prevailing Wage
  214. Process for Documenting Certified Materials in FieldManager
  215. Processing Sewage/Storm Water Damage Claims
  216. Project Closeout Escalation of Accountability
  217. Project Delays Due to a Utility Company
  218. Project with Consultant Oversight
  219. Projects with Incentive Provisions
  220. Quality Initiatives and Adjustments
  221. Railroad Highway Projects
  222. Section 601 - Portland Cement Concrete for Pavements
  223. Section 701 - Portland Cement Concrete for Structures
  224. Standard Naming Convention
  225. Structural Fabrication Quality Manual
  226. Table of Contents Division 1
  227. Table of Contents Division 1 Supplemental
  228. Table of Contents by Project Phase
  229. Weight Limit Waivers
  230. Work Order

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)