Pages without language links

Jump to navigation Jump to search

The following pages do not link to other language versions.

Showing below up to 222 results in range #31 to #252.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. 104.01 Authority of the Department
  2. 104.02 Plans and Working Drawings
  3. 104.03 Deviations from the Plans
  4. 104.04 Conformity with the Contrat
  5. 104.05 Removal of Unauthorized Work
  6. 104.06 Coordination of Drawing Dimensions and Contract Documentation
  7. 104.07 Contractor Obligations
  8. 104.08 Cooperation by the Contractor
  9. 104.09 Lines, Grades, and Elevations
  10. 104.10 Claim for Extra Compensation or Extension of Time
  11. 104.11 Work Zone Safety and Mobility
  12. 104.12 Approval for Use of the Right of Way
  13. 105.01 Quality and Scope of Supply
  14. 105.02 Natural Material Sources Found Within the Excavation Limits
  15. 105.03 Borrow Materials
  16. 105.04 Miscellameous Quantities
  17. 105.05 Approval of Materials Incorporated into the Work
  18. 105.06 Storage of Materials
  19. 105.07 Handling and Transporting Materials
  20. 105.08 Nonconforming Materials
  21. 105.09 Materials not Incorporated into the Work
  22. 105.10 Buy America Source of Steel and Iron
  23. 106 - Quality Assurance Acceptance Program
  24. 107.01 Laws to be Observed
  25. 107.02 Permits and Licenses
  26. 107.03 Patented Process and Materials
  27. 107.04 Federal Aid Participation
  28. 107.05 Sanitary Provisions
  29. 107.06 Furnishing Right-of-Way
  30. 107.07 Protection and Restoration of Property
  31. 107.08 Land Monuments and Property Corners
  32. 107.09 Archeological and Historical Findings
  33. 107.10 Indemnification, Damage Liability, and Insurance
  34. 107.11 Contractor's Responsibility for the Work
  35. 107.12 Contractor's Responsibility for Utility Property and Services
  36. 107.13 Personal Liability of Public Officials
  37. 107.14 No Waiver of Legal Rights
  38. 107.15 Compliance with Laws; Environmental Protection
  39. 107.16 Forest Protection
  40. 107.17 Use of Explosives
  41. 107.18 Work over Navigable Waters
  42. 107.19 Hauling on Local Roads and Streets
  43. 107.20 Private Railroad Crossing for Haul Purposes
  44. 107.21 Open to Traffic
  45. 108.01 Subcontracting of Contract Work
  46. 108.02 Limitations of Operations
  47. 108.03 Competence of Workers
  48. 108.04 Adequacy of Methods and Equipment
  49. 108.05 Progress Schedule
  50. 108.06 Determination of Contract Time for Work Day Contracts
  51. 108.07 Extension of Time on Work Day Contracts
  52. 108.08 Extension of Time on Calendar Day Contracts
  53. 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts
  54. 108.10 Liquidated Damages
  55. 108.11 Default of Contract
  56. 108.12 Termination of Contract
  57. 109.01 Measurement of Quantities
  58. 109.02 Scope of Payment
  59. 109.03 Payments for Increased or Decreased Quantities
  60. 109.04 Progress and Partial Payments
  61. 109.05 Payment for Contract Revisions
  62. 109.06 Source of Supply and Carrier Rates on Materials
  63. 109.07 Final Inspection, Acceptance, and Final Payment
  64. 109.08 Prompt Payment
  65. 150 - Mobilization
  66. 201 - Clearing
  67. 202 - Removing Trees, Stumps, and Corduroy
  68. 203 - Removing Drainage Structures, Culverts, and Sewers
  69. 204 - Removing Miscellaneous Structures and Materials
  70. 205 - Roadway Earthwork
  71. 206 - Excavation and Backfill for Structures
  72. 207 - Obliterating Roadway
  73. 208 - Soil Erosion and Sedimentation Control (NPDES)
  74. 209 - Project Cleanup
  75. 301 - Subbase
  76. 302 - Aggregate Base Courses
  77. 303 - Open Graded Drainage Course
  78. 304 - Rubbilizing Existing PCC Pavement
  79. 305 - HMA Base Crushing and Shaping
  80. 306 - Aggregate Surface Course
  81. 307 - Aggregate Shoulders and Approaches
  82. 308 - Geotextiles for Base
  83. 401 - Culverts
  84. 402 - Storm Sewers
  85. 403 - Drainage Structures
  86. 404 - Underdrain
  87. 405 - Pump Station Construction
  88. 406 - Precast Three-Sided, Arch, and Box Culverts
  89. 501 - Plant Produced Hot Mix Asphalt
  90. 502 - HMA Crack Treatment
  91. 503 - Paver Placed Surface Seal
  92. 504 - Micro-Surfacing
  93. 505 - Chip Seals
  94. 506 - Slurry Seal
  95. 602 - Concrete Pavement Construction
  96. 603 - Concrete Pavement Restoration
  97. 700 - Closure of Unsafe Structures
  98. 701 - Portland Cement Concrete for Structures
  99. 702 - Mortar and Grout
  100. 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes
  101. 704 - Steel Sheet Piling and Cofferdams
  102. 705 - Foundation Piling
  103. 706 - Structural Concrete
  104. 707 - Structural Steel
  105. 708 - Prestressed Concrete
  106. 709 - Timber Sturctures
  107. 710 - Waterproofing and Protective Covers
  108. 711 - Bridge Railings
  109. 712 - Bridge Rehabilitation, Concrete
  110. 713 - Bridge Rehabilitation, Steel
  111. 714 - Temporary Structures and Approaches
  112. 715 - Cleaning and Coating Existing Structural Steel
  113. 716 - Shop Cleaning and Coating Structural Steel
  114. 717 - Downspouts and Drains
  115. 718 - Drilled Shafts
  116. 719 - Earth Retaining Structures
  117. 801 - Concrete Driveways
  118. 802 - Concrete Curb, Gutter, and Dividers
  119. 803 - Concrete Sidewalk, Ramps, and Steps
  120. 804 - Concrete Barriers and Glare Screens
  121. 805 - Hot Mix Asphalt Curb
  122. 806 - Bicycle Paths
  123. 807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts
  124. 808 - Fencing
  125. 809 - Field Office
  126. 810 - Permanent Traffic Signs and Supports
  127. 811 - Permanent Pavement Markings
  128. 812 - Temporary Traffic Control for Construction Zone Operations
  129. 813 - Slope Protection
  130. 814 - Paved Ditches
  131. 815 - Landscaping
  132. 816 - Turf Establishment
  133. 817 - Landscape Mowing
  134. 819 - Electrical and Lighting
  135. 820 - Traffic Signals
  136. 821 - Preservation of Land Monuments and Property Corners
  137. 822 - Ground or Cut Centerline and Shoulder Corrugations
  138. 823 - Water Mains
  139. 824 - Contractor Staking
  140. 825 - Sanitary Sewer Systems
  141. 826 – Intelligent Transportation Systems
  142. 900 - Materials
  143. CONSTRUCTION MANUAL CONTENT TEMPLATE
  144. Certified Engineer Process
  145. Certified Office Technician Process
  146. Construction Field Services Indirect Testing Charges
  147. Construction Manual Wiki Tips
  148. Construction Technology Support Resources
  149. Construction Value Engineering Change Proposal (VECP)
  150. Contract Administration and Oversight Guidelines for Intelligent Transportation Systems (ITS) Projects
  151. Contract Administration and Oversight Guidelines for Projects Containing Warranty Work
  152. Contractor's Equipment and Traffic Control
  153. Density Training Videos
  154. Dev Page
  155. Digital Calculations for Payment
  156. Disadvantaged Business Enterprises (DBE)
  157. Dispute Review Board (DRB)
  158. Invalid title with namespace "(Main)" and text "Division_1_–_General_Provisions"
  159. Division 2 Supplemental Information
  160. Division 3 Supplemental Information
  161. Division 4 Supplemental Information
  162. Division 7 Supplemental Information
  163. E-Construction
  164. E-Signature
  165. Extending Project Limits
  166. FHWA CAP Action Plans
  167. FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)
  168. FPR Frequently Asked Questions
  169. FieldManager
  170. Final Project Review
  171. Final Project Review Report
  172. Force Account Work
  173. Frequently Searched Items
  174. Holiday Traffic Safety Provisions
  175. Hot Mix Asphalt Production Manual
  176. Information Sharing About Construction Contractors and Consultants
  177. Interim File Review
  178. Letter to File
  179. Local Agency Program (LAP)
  180. MDOT Construction Manual Content Revision Procedures
  181. MDOT Construction Manual Style Guide
  182. MDOT DENSITY TESTING AND INSPECTION MANUAL
  183. Main Page
  184. Mandrel Testing of Plastic Pipe
  185. Materials Quality Assurance Procedures Manual
  186. Module:Arguments
  187. Module:Category handler
  188. Module:Documentation
  189. Module:Documentation/config
  190. Module:HtmlBuilder
  191. Module:Message box
  192. Module:Message box/configuration
  193. Module:Namespace detect
  194. Module:Namespace detect/config
  195. Module:Namespace detect/data
  196. Module:Yesno
  197. New CM Format Code
  198. Notice of Non-Compliance with Contract Requirements
  199. Oversight of Maintenance Funded Projects Using the Michigan Department of Transportation Letting System
  200. Pavement Historical Database
  201. Plans, Proposal, Input, Review and Evaluation
  202. Preconstruction Meeting
  203. Prevailing Wage
  204. Process for Documenting Certified Materials in FieldManager
  205. Processing Sewage/Storm Water Damage Claims
  206. Project Closeout Escalation of Accountability
  207. Project Delays Due to a Utility Company
  208. Project with Consultant Oversight
  209. Projects with Incentive Provisions
  210. Quality Initiatives and Adjustments
  211. Railroad Highway Projects
  212. Section 601 - Portland Cement Concrete for Pavements
  213. Section 701 - Portland Cement Concrete for Structures
  214. Standard Naming Convention
  215. Standard Rounding Convention Guidance
  216. Structural Fabrication Quality Manual
  217. Table of Contents Division 1
  218. Table of Contents Division 1 Supplemental
  219. Table of Contents by Project Phase
  220. Underground or Above Ground Fuel Storage Tanks
  221. Weight Limit Waivers
  222. Work Order

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)