Difference between revisions of "Structural Fabrication Quality Manual"
Line 21: | Line 21: | ||
industry standards for structural steel inspection. | industry standards for structural steel inspection. | ||
− | <b>Chapter 3 (Inspection and Test Plans): | + | <b>Chapter 3 (Inspection and Test Plans):</b> |
:* Added new standard ITP (steel highway structure, spun concrete prestressed pole, and | :* Added new standard ITP (steel highway structure, spun concrete prestressed pole, and | ||
bridge steel) | bridge steel) | ||
− | <b>Chapter 4 (Supplier Qualification Program): | + | <b>Chapter 4 (Supplier Qualification Program):</b> |
:* Added Supplier Qualification Standard for Steel Highway Structures. | :* Added Supplier Qualification Standard for Steel Highway Structures. | ||
− | <b>Chapter 7 (Request for Information Process) | + | <b>Chapter 7 (Request for Information Process):</b> |
:* Added requirement for SFU to electronically sign RFI to document response date and | :* Added requirement for SFU to electronically sign RFI to document response date and | ||
respondee to improve documentation. | respondee to improve documentation. | ||
− | <b>Chapter 8 (Nonconformance Process): | + | <b>Chapter 8 (Nonconformance Process):</b> |
:* Removed the requirement that weld repairs resulting from QC NDT are considered a major | :* Removed the requirement that weld repairs resulting from QC NDT are considered a major |
Revision as of 14:00, 18 July 2023
The Bureau of Bridges and Structures Construction Section has revised its 2021 Structural Fabrication Quality Manual (version 2) for a 2023 version 3 release. The manual is referenced in the MDOT Materials Quality Assurance Procedures Manual and is located on the Structural Fabrication Unit’s (SFU) website. A brief description of the revisions is presented below.
Chapter 1 (General Information):
- Updated web links due to new website platform
- Added narrative report writing requirements (high and low for ambient temperature and
requirements when “we” is used).
- Added example of acceptable as-built shop drawing submittal.
- Updated QAI qualifications for aggregate sampling.
Chapter 2 (Fabrication Inspection Procedures):
- Revised name of subsections 2.3 and 2.4 to align with bridge and structural steel
categories delineated in 2020 spec book.
- Added converting conventional radiographic test film to digital images.
- Updated terminology in subsection 2.4 from “traceable” to “identifiable” to align with
industry standards for structural steel inspection.
Chapter 3 (Inspection and Test Plans):
- Added new standard ITP (steel highway structure, spun concrete prestressed pole, and
bridge steel)
Chapter 4 (Supplier Qualification Program):
- Added Supplier Qualification Standard for Steel Highway Structures.
Chapter 7 (Request for Information Process):
- Added requirement for SFU to electronically sign RFI to document response date and
respondee to improve documentation.
Chapter 8 (Nonconformance Process):
- Removed the requirement that weld repairs resulting from QC NDT are considered a major
nonconformance requiring an NCR.
Annexes:
- Added existing MDOT Shop Drawing Review Process
- Added existing MDOT Structural Precast Concrete SD Review List
- Added existing MDOT Structural Steel SD Review List
- Added existing MDOT Elastomeric Bearing SD Review List
- Added existing MDOT Welder Qualification Program