Structural Fabrication Quality Manual

From MediaWiki
Revision as of 14:02, 18 July 2023 by Clarkj25 (talk | contribs)
Jump to navigation Jump to search
Email this Page

The Bureau of Bridges and Structures Construction Section has revised its 2021 Structural Fabrication Quality Manual (version 2) for a 2023 version 3 release. The manual is referenced in the MDOT Materials Quality Assurance Procedures Manual and is located on the Structural Fabrication Unit’s (SFU) website. A brief description of the revisions is presented below.

Chapter 1 (General Information):

  • Updated web links due to new website platform
  • Added narrative report writing requirements (high and low for ambient temperature and requirements when “we” is used).
  • Added example of acceptable as-built shop drawing submittal.
  • Updated QAI qualifications for aggregate sampling.


Chapter 2 (Fabrication Inspection Procedures):

  • Revised name of subsections 2.3 and 2.4 to align with bridge and structural steel categories delineated in 2020 spec book.
  • Added converting conventional radiographic test film to digital images.
  • Updated terminology in subsection 2.4 from “traceable” to “identifiable” to align with industry standards for structural steel inspection.

Chapter 3 (Inspection and Test Plans):

  • Added new standard ITP (steel highway structure, spun concrete prestressed pole, and bridge steel)

Chapter 4 (Supplier Qualification Program):

  • Added Supplier Qualification Standard for Steel Highway Structures.

Chapter 7 (Request for Information Process):

  • Added requirement for SFU to electronically sign RFI to document response date and respondee to improve documentation.

Chapter 8 (Nonconformance Process):

  • Removed the requirement that weld repairs resulting from QC NDT are considered a major nonconformance requiring an NCR.



[top of page]