Difference between revisions of "Chapter 4 - Developing Electronic Data"
Jump to navigation
Jump to search
(Replaced content with "{{Navbox DSR|Chapter 3 - Standard Naming Conventions|Chapter 5 - RID Process}} ==4.1 Milestone Submittals== The Development Guide has moved...") Tag: Replaced |
|||
Line 6: | Line 6: | ||
If you haven't visited the new site yet, click the link, then click Request Access. You will be added to the Sharepoint Visitors group, and will receive an email with a link to the Development Guide. If you still have access issues, contact MDOT-EngineeringSupportTraining@michigan.gov | If you haven't visited the new site yet, click the link, then click Request Access. You will be added to the Sharepoint Visitors group, and will receive an email with a link to the Development Guide. If you still have access issues, contact MDOT-EngineeringSupportTraining@michigan.gov | ||
− | |||
− |
Revision as of 13:03, 24 April 2024
By Chapter
4.1 Milestone Submittals
The Development Guide has moved to a Sharepoint site. New Development Guide
If you haven't visited the new site yet, click the link, then click Request Access. You will be added to the Sharepoint Visitors group, and will receive an email with a link to the Development Guide. If you still have access issues, contact MDOT-EngineeringSupportTraining@michigan.gov