Difference between revisions of "Chapter 2 - Safety"

From MediaWiki
Jump to navigation Jump to search
Line 1: Line 1:
 +
{{Navbox Survey Manual|Chapter_1_-_Survey_Manual_Introduction|Chapter_3_-_Datums,_Coordinate_Systems_%26_Units_of_Measure}}
 +
 
==[[#2.1 General|2.1 General]]==
 
==[[#2.1 General|2.1 General]]==
  

Revision as of 15:34, 8 October 2015

Survey Support

Ambox important.png
Coming Soon

2.1 General

Safe practices must be utilized on all MDOT projects in accordance with OSHA, MiOSHA and Department procedures and regulations.

[top of page]


2.2 Personal Protection Equipment(PPE)

Ensure that proper personal protective equipment (PPE) is used in accordance with MDOT’s Personal Protective Equipment Policy Guidance Document 10118.

[top of page]


2.3 Traffic Control

Ensure that safe practices are followed according to the Michigan Manual of Uniform Traffic Control Devices, Part 6 and the Work Zone Safety and Mobility Manual.

[top of page]


2.3.1 Coordination of Traffic Control

Surveyors must discuss the project with the Region or Local TSC Safety Engineer before work commences or a price proposal is submitted. On projects for which survey activities are consulted out, MDOT does not reimburse additional traffic control after acceptance of project costs.


[top of page]