Chapter 2 - Safety

From MediaWiki
Revision as of 10:18, 5 November 2015 by Lacrossd1 (talk | contribs)
Jump to navigation Jump to search

Training Materials

2.1 General

Safe practices must be utilized on all MDOT projects in accordance with OSHA, MiOSHA and Department procedures and regulations.

[top of page]


2.2 Personal Protection Equipment(PPE)

Ensure that proper personal protective equipment (PPE) is used in accordance with MDOT’s Personal Protective Equipment Policy Guidance Document 10118.

[top of page]


2.3 Traffic Control

Ensure that safe practices are followed according to the Michigan Manual of Uniform Traffic Control Devices, Part 6 and the Work Zone Safety and Mobility Manual.

[top of page]


2.3.1 Coordination of Traffic Control

Surveyors must discuss the project with the Region or Local TSC Safety Engineer before work commences or a price proposal is submitted. On projects for which survey activities are consulted out, MDOT does not reimburse additional traffic control after acceptance of project costs.


[top of page]