Difference between revisions of "Design Submittal Requirements"
Jump to navigation
Jump to search
(Created page with "==Introduction== ===Purpose=== The intent of this document is to provide standards and guidelines to promote consistent, uniform, and useable d...") |
|||
(11 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
− | + | {{Navbox DSR|Design Submittal Requirements|Chapter 1 - ProjectWise Pre-Bid Processes}} | |
− | |||
− | The | + | ==[[#Purpose|Purpose]]== |
+ | '''The Development Guide has moved to a Sharepoint site.''' | ||
+ | [https://stateofmichigan.sharepoint.com/sites/MDOT-SPC-DevelopmentGuide/ New Development Guide] | ||
− | + | If you haven't visited the new site yet, click the link, then click Request Access. You will be added to the Sharepoint Visitors group, and will receive an email with a link to the Development Guide. If you still have access issues, contact [http://mailto:Mdot-EngineeringSupportTraining@michigan.gov MDOT-EngineeringSupportTraining@michigan.gov] | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
[[CATEGORY:Design Submittal Requirements]] | [[CATEGORY:Design Submittal Requirements]] | ||
+ | [[CATEGORY:RID]] |
Latest revision as of 11:43, 10 January 2024
By Chapter
Purpose
The Development Guide has moved to a Sharepoint site. New Development Guide
If you haven't visited the new site yet, click the link, then click Request Access. You will be added to the Sharepoint Visitors group, and will receive an email with a link to the Development Guide. If you still have access issues, contact MDOT-EngineeringSupportTraining@michigan.gov