Search results

Jump to navigation Jump to search

Page title matches

Page text matches

  • FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan) ...are listed on the S&O plan for the project. Please review your projects S&O plan for any actions or approvals required by your FHWA Area Engineer on
    2 KB (296 words) - 15:37, 3 January 2024
  • ...or debris caused by the Contractor's operations will be at the Contractor's expense). Refer also to subsection [http://mdotcf.state.mi.us/public/specb
    1 KB (205 words) - 10:08, 13 September 2023
  • ...iness. If not shown as a pay item, dust control will be at the Contractor's expense.
    686 bytes (98 words) - 17:36, 12 January 2022
  • ...tor%27s_Responsibility_for_Utility_Property_and_Services 107.12 Contractor's Responsibility for Utility Property and Services]<br /> ...truction/index.php/Contractor%27s_Equipment_and_Traffic_Control Contractor's Equipment and Traffic Control]<br />
    7 KB (921 words) - 15:18, 26 July 2022
  • val = val:match('^%s*(.-)%s*$') return val:match('^%s*(.-)%s*$')
    8 KB (1,311 words) - 09:28, 3 July 2014
  • ...plies regardless of how the ROW is owned, i.e., fee, statutory, etc. MDOT's responsibilities/costs are limited to the removal of the tank and preventin ...moval Contractor (Upper Peninsula or Lower Peninsula contract) of the tank's existence and faxes them the map or sketch provided by the Engineer.
    9 KB (1,330 words) - 14:21, 23 September 2021
  • ...Meeting, the Engineer provides the Progress Clause, signs off on the plan's title sheet (along with the Project Manager) and signs the Certification Ac ...presentative should encourage the prime contractor and major subcontractor(s) to participate in the post-construction review process with written commen
    7 KB (1,055 words) - 11:29, 14 July 2020
  • nsVals[i] = format('"%s"', val) tinsert(self[tname], format('[[Category:%s|%s]]', cat, sort))
    18 KB (2,535 words) - 09:28, 3 July 2014
  • ...loat: right; padding-right: 1px;">{{#ev:youtube|JbwlvmOTUrI|350|right|MDOT's e-Construction Process}}</div> ..."float: left; padding-right: 1px;">{{#ev:youtube|ScB1b3fqjQo|350|left|MDOT's e-Construction Process on I-96}}</div>
    12 KB (1,824 words) - 16:49, 18 April 2024
  • ...ose changes in the contract requirements which will accomplish the project's functional requirements at a less cost or improve value or service at no in ...s, and proceed as follows for evaluation and/or approval of the contractor's VECP:
    9 KB (1,297 words) - 14:57, 11 October 2022
  • -- you can localise the module to your wiki's language. --
    3 KB (348 words) - 09:28, 3 July 2014
  • ...ost important of all, the actual pay limits. At this time, the Contractor's planned operations should be discussed, with instructions that the work be ...ROW limits for the adjacent property owner's use. The location and owner's name should be reported. Timber is not required to be cut in lengths less
    8 KB (1,133 words) - 12:01, 28 March 2023
  • -- Editors can experiment in this template's sandbox (edit | diff) and testcases (edit) pages. cfg['experiment-blurb-template'] = "Editors can experiment in this template's $1 and $2 pages."
    18 KB (2,100 words) - 09:28, 3 July 2014
  • MDOT’s archaeologist, Environmental Services Section, is solely responsible for ad ...human remains discovery in compliance with [http://www.legislature.mi.gov/(S(lepygpsc0qtdad5texio4mb0))/mileg.aspx?page=GetObject&objectname=mcl-333-285
    5 KB (738 words) - 13:42, 1 April 2024
  • | Masonry Cement Type N, Type S, Type M || 901 | Hydrated Lime Type S, Type SA || 901
    5 KB (749 words) - 11:43, 19 January 2022
  • Guidance for the submittal of CPE's and 1165 Non-Compliance Documents an be found here:
    3 KB (385 words) - 15:22, 26 September 2023
  • ...Act 174] Delays - Utility delays caused by [http://www.legislature.mi.gov/(S(m0pmq5oupdxtjvp4vrcooiaq))/mileg.aspx?page=getObject&objectName=mcl-Act-174 ...Utility Delay - Utility delays and/or extras resulting from the department’s design phase utility coordination efforts certifying utility issues are ide
    9 KB (1,295 words) - 10:58, 4 May 2022
  • return mw.ustring.format('[[%s|%s]]', page, display) return mw.ustring.format('[[%s]]', page)
    35 KB (4,418 words) - 09:28, 3 July 2014
  • ...Environmental Engineer or the Supervising Engineer of the Design Division’s Utilities Drainage and Roadsides Section. ...the information to the individual expeditiously may affect the department’s ability to successfully defend against a claim or civil action under the Ac
    20 KB (3,034 words) - 15:47, 19 January 2022
  • ...he order should be signed by the issuing Engineer and the prime Contractor's representative indicating understanding and agreement.
    3 KB (424 words) - 15:52, 19 January 2022

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)